Notice ID: f246fb3a03e64739ecdc58f7e9761ba1Combined Synopsis/Solicitation
F--F - ESA Phase I & II for Old Breadsprings
Archived on June 20, 2014. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- May 19, 2014
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541620: Environmental Consulting Services
- Agency
- Department of the InteriorBUREAU OF INDIAN AFFAIRS
Notice details
- Office
- BUREAU OF INDIAN AFFAIRS
- PSC
- F: NATURAL RESOURCES MANAGEMENT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- A14PS00486
- Notice ID
- f246fb3a03e64739ecdc58f7e9761ba1
Description
Amendment no.: 0005 is for Solicitation no.: A14PS00486 is as follows: 1. To change this paragraph to read as: Task II-1. The ASTM report shall be reviewed and stamped by a Environmental Professional certifying that the report was conducted and prepared in accordance with the required standards identified in this contract. 2. To Clarify the Square footage below: Old Bread Springs School Inventory Bldg Number SQ.FT Multi-purpose Building = Bldg No. 376 9,352 Sq ft Multi-purpose Building (378) = Bldg No. 378 1,048 Sq ft Appartment = Bldg No. 380 2,522 Sq ft Appartment = Bldg No. 381 2,131 Sq ft Pump house = Bldg No. 382 112 Sq ft Facility Maintenance Shop = Bldg No. 390 384 Sq ft School, elementary = Bldg No. 392 1,348 Sq ft School, elementary = Bldg No. 393 1,012 Sq ft School, elementary = Bldg No. 395 896 Sq ft 18,805 Sq ft Tank 1 Tank 2 Tank 3 Tank 4 Propane Tank Transfer to Tohaali 1 Water Tank, Elevated 1 Lagoon, 2 cell 1 3. REVISED PRICE SCHEDULE: ASTM E1903-11 PHASE II STUDY Price - Old Bread Springs School TASK I PREWORK SUBMTTALS 1 Site Specific HASP $ 2 Work Plan $ 3 Work Schedule $ TASK II INVESTIGATION/SAMPLING/ANALYSES A Inves.(64 hours@ $__/hr) $ 1 Asbestos (50 @ $__ea) $ 2 Lead/LBP (200 @ $__0 ea) $ 3 PCBs (50 @ $__ea) $ 4 Mercury (10 @ $__ea) $ 5 Chemicals (10 @ $__ea) $ 6 AST (3 @ $__ each) $ 7 Univ Wste (50 @ $__ ea) $ 8 Lagoon (10 @ $__ ea) $ 9 Water Twr (5 @ $__ ea) $ TASK III Engineer Cost Estimate 1 Cost Estimate $ 2 PE Certification $ 3 Discussions $ TASK IV Report 1 Report Preparation $ 2 Draft Report $ 3 Duplication of Report $ TOTAL $ Phase II PRICE Schedule Attachment C Group I and II Tasks Group Task I Pre-Work Submittals: 1. Develop a Health and Safety Plan in accordance with 29 CFR 1910.120 for worker protection $ 2. Work Plan/Schedule $ Subtotal $ Group Task II: Site visits, communication, photographic record; Research of Data Bases and records Conduct Interviews with local and knowledgeable individuals, etc, 1. Mileage (Gallup to Bread Springs 30/RTX$____mile X 3Trips) $ 2. Lodging/Per diem ($_____/night X3nightsX3) $ 3. Vehicle Rental $/week $ 4. Personnel Costs: Project Manager ($__/hrX32) $ Engineering Tech ($__/hr. X32) $ Administrative/Clerical ($__/hrX16) $ Professional Engineer Certification $ 5. Verify onsite Plot Plan locating all existing structures including plotting of all UGUs and ASTs $ 6. Prepare report in ASTM E1527-005 Outline format $ Subtotal $ Taxes: 7. NMGRT- 7.938% $ 8. Navajo Nation GRT- 4.0% $ Subtotal $ Total $ 4. All other terms and conditions to remain the same.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
MARY JANE JOHNSON
Documents
No documents available.
Lifecycle
Solicitation:
A14PS00486- Combined Synopsis
- 5×Combined SynopsisCurrentMay 9, 2014
F--F - ESA Phase I & II for Old Breadsprings
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
A14PS00486
Archive Date
Jun 20, 2014