GovChime
Notice ID: 7857a03180101c374b6e2e05842ff868Presolicitation

F--F - ESA Phase I & II for Tohatchi

Archived on June 20, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
May 19, 2014
Notice type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541620: Environmental Consulting Services
Agency
Department of the InteriorBUREAU OF INDIAN AFFAIRS

Notice details

Office
BUREAU OF INDIAN AFFAIRS
PSC
F: NATURAL RESOURCES MANAGEMENT
Last updated
Dec 5, 2025

Identifiers

Solicitation number
A14PS00487
Notice ID
7857a03180101c374b6e2e05842ff868

Description

Amendment no.: 0006 is for Solicitation no.: A14PS00487 is as follows: 1. To change paragraph 10 in the statement of work to read: "The work shall consist of the conduct of an ASTM E1527-05 Phase 1 study with a visual survey, based using the existing utility plan of the Tohatchi School for the ~262.30 acres shall be use to confirm the location of underground utilities or any buried underground storage tanks. Revisions to the existing utility and site plan identify all existing structures and the location of underground utilities shall be developed. Following the visual survey, a report shall be prepared in the format a provided by Section 7, Phase 1 Environmental Site Assessment of the ASTM E1527-05 and shall also include documentation and recommendations as outlined in Section 13. The document shall be reviewed, stamped and signed by a Environmental Professional certifying that the Phase I was prepared in accordance with the ASTM E1527-005 format and the All Appropriate Inquiry Regulations 40 CFR 312.16." 2. To Clarify the Square footage below: Old Tohatchi/TAOS Boarding School Inventory BUIDLING NAME Bldg No. SQ.FT School, Boarding (Other)= Bldg no. 1 13,644.00 sq ft Barn = Bldg no. 10 2,970.00 sq ft Storage, Non-heated = Bldg no. 13 864.00 sq ft Storage, Non-heated = Bldg no. 19 720.00 sq ft Storage, Non-heated = Bldg no. 20 348.00 sq ft Utility Plant, Other = Bldg no. 21 1,743.00 sq ft Office = Bldg no. 71 19,029.00 sq ft Dormitory = Bldg no. 73 6,817.00 sq ft Warehouse = Bldg no. 79 915.00 sq ft Storage, Non-heated = Bldg no. 86 360.00 sq ft Pump House = Bldg no. 93 112.00 sq ft Office = Bldg no. 96 15,696.00 sq ft Office = Bldg no. 97 15,696.00 sq ft Quarters, Single-Family = Bldg no. 121 3,117.00 sq ft Quarters, Garage Detached = Bldg no. 122 1,184.00 sq ft Quarters, Multi-Family = Bldg no. 123 1,184.00 sq ft Quarters, Garage Detached = Bldg no. 124 1,184.00 sq ft Kitchen = Bldg no. 125 5,943.00 sq ft Warehouse = Bldg no. 126 1,008 sq ft TOTAL SQUARE FEET 92,534.00 sq ft Tank 2 Tank 3 Tank 4 Tank 5 Tank 6 Water Tank, Elevated 1 REVISED PRICE SCHEDULE: PRICE: Bread Springs School Phase I & II: 3. TO REVISE THE PRICE SCHEDULE: PRICE: School Phase I & II: ASTM E1903-11 PHASE II STUDY PRICE SCHEDULE - School TASK I PREWORK SUBMTTALS 1 Site Specific HASP $________ 2 Work Plan $________ 3 Work Schedule $________ Task I Sub-Total: $________ TASK II INVESTIGATION/SAMPLING/ANALYSES A Inves.(__ hours@ $___/hr) $________ 1 Asbestos (250 @ $___ ea) $________ Unit Price for additional samples above the 250 threshold $_______ 2 Lead/LBP (50 @ $___ ea) $________ 3 PCBs (20 @ $___ ea) $________ 4 Mercury (10 @ $___ ea) $________ 5 Chemicals (10 @ $___ ea) $________ 6 AST (3 @ $__ each) $________ If AST are discovered 7 Univ Wste (10 @ $___ ea) $________ 8 Lagoon (3 @ $___ ea) $________ 9 Water Twr (3 @ $___ ea) $________ (This would be for Lead in Soil) Task II Sub-Total: $________ OPTION: Geo Phy total $______ TASK III Engineer Cost Estimate 1 Cost Estimate $________ 2 PE Certification $________ 3 Discussions $________ Task III Sub-Total: $________ TASK IV Report 1 Report Preparation $________ 2 Draft Report $________ 3 Duplication of Report $________ Task IV Sub-Total: $________ TOTAL $_____________ 4. Include the following Clauses: 52.217-6; 52.217-7, 52.217-8, and 52.217-9

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

MARY JANE JOHNSON

Documents

No documents available.

Lifecycle

Solicitation:A14PS00487
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 9×
    Pre-SolicitationCurrentMay 9, 2014

    F--F - ESA Phase I & II for Tohatchi

    Notice 7857a03180101c374b6e2e05842ff868 on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

A14PS00487

Archive Date

Jun 20, 2014