Z1MG--SOLAR PV SYSTEM PMIR - Base + 4 [605] | POP: (11/01/2025 - 10/31/2030)
Awarded on October 20, 2025. Full description on SAM.gov.
Overview
- Posted
- October 20, 2025
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 221114: Solar Electric Power Generation
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 262-NETWORK CONTRACT OFFICE 22 (36C262)
- Place of performance
- Loma Linda, California, 92357
- Last updated
- Nov 7, 2026
- First published
- Last updated on SAM.gov
- Award date
- Oct 20, 2025
- Award amount (SAM.gov award notice)
- $223.0K
Identifiers
- Solicitation number
- 36C26226P0077
- Notice ID
- a3bc326930f042e28ac017338b3dfe22
- Award number (PIID)
- 36C26226P0077
Description
The VA Loma Linda Healthcare System (VALLHCS), Jerry L. Pettis VA Medical Center (VAMC), located at 11201 Benton Street, Loma Linda, CA 92357-1000 is seeking to purchase Solar Photovoltaic System Preventive Maintenance Inspection and Repair (PMIR) services.
Award Overview
Award Number
36C26226P0077
Award Amount (SAM.gov award notice)
$223.0K
Award Date
Oct 20, 2025
Awardee
Awardee UEI
PH7LVCQSC819
Awardee CAGE Code
82PS3
Awardee Address
Blythe, CA 92225, UNITED STATES
Line Item Number
20
Original Solicitation
Notice ID: a3bc326930f042e28ac017338b3dfe22
Posted Date: Oct 20, 2025
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $603.3KSigned Jun 5, 2026
- $603.3KSigned Mar 20, 2026
- $520.0KSigned Feb 19, 2026
- $4.3MSigned May 19, 2025
- $446.0KSigned Mar 20, 2025
Contacts
Contracting Officer
Primary Contact
Documents
Files (8)
- Download
S02 CSS 36C26226Q0022_3.docx
449 KBAdded in Combined Synopsis/Solicitation version 9Posted - Download
S02 CSS 36C26226Q0022_2.docx
73 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
S02 CSS 36C26226Q0022_1.docx
68 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
S02 PV System LOMA LINDA VA II - AS-BUILT - 2013.05.10.pdf
76 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
S02 Photovoltaic Phase 1 complete set.pdf
3.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
S02 Loma Linda VA Electrical As-Built Dwgs_03-10-17_s-s.pdf
18 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Price-Cost Schedule 36C26226Q0022.docx
26 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
36C26226Q0022.docx
64 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 5Version 5Combined Synopsis/SolicitationArchived
Z1MG--SOLAR PV SYSTEM PMIR - Base + 4 [605] | POP: (11/01/2025 - 10/31/2030)
- 4Version 4Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Z1MG--SOLAR PV SYSTEM PMIR - Base + 4 [605] | POP: (11/01/2025 - 10/31/2030)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
2 | Page 1. This is a combined synopsis/solicitation for commercial services/items prepared in accordance with the format in FAR Subpart 12.2 in conjunction with FAR Part 13, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. 1.a. Project Title: Annual REC Solar Panel Maintenance 1.b. Description: VA Greater Los Angeles Healthcare System located at 11301 Wilshire Blvd; Los Angeles CA 90073 is seeking a contractor to provide preventive maintenance services on VA owned REC solar panels and solar inverters at the VA West Los Angeles Campus, 11301 Wilshire Blvd., Los Angeles, CA 90073. 1.c. Project Location: VA Greater Los Angeles Healthcare System, 11301 Wilshire Blvd, Los Angeles, CA 90073 1.d. Solicitation Type - Number: Request for Quotes (RFQ) - 36C26227Q0119. 1.e. Set Aside: This solicitation is issued as an SDVOSB set aside. 1.f. Applicable NAICS code: 238210 Electrical Contractors and Other Wiring Installation Contractors. 1.g. Small Business Size Standard: $19 million 1.h. Type of Contract: Firm Fixed Price 1.i. Period of Performance: Base year plus 4 option years 1.j. Wage Determination applicable to this project: SCA WD 2015-5613 revision 34 1.k. Questions regarding the solicitation should be submitted via email no later than 2pm PST Monday, November 30th, 2026, to ositadima.ndubizu@va.gov 1.l. Job walk will be conducted at 11am on Monday, November 23rd, 2026. Participants will meet with Ross Manoukian and Moses Dominguez in Bldg. 63 at the VA Greater Los Angeles Medical Center, 11301 Wilshire Blvd, Los Angeles, CA 90073. A location map is attached to this solicitation. Please reach out to Moses Dominguez at 310-904-4009 if you need to locate the meeting point. Please email ositadima.ndubizu@va.gov to indicate intent to participate 1.m. Company info and quote should be in the attached Enclosure 1 form. All other forms of offer will not be accepted. Your enclosure form and capabilities statement/experience should be sent in one email with 2 separate email attachments, or it will not be accepted 2. Statement of Work BACKGROUND. The purpose of this contract is to have a contractor provide training, maintenance, repair, inspection and cleaning of the VA WLA Solar PV inverters and arrays. Contractor shall provide all maintenance and services. The Contractor shall furnish all parts, labor, equipment, qualified personnel, qualified supervision, and transportation necessary. SCOPE. Contractor shall provide services as follows: Preventative Maintenance Service Description Service Frequency General Inspections: Visual inspection for signs of damage, overall wear and tear, module breakage, loose conduit, broken straps, etc. Sample check torque marks and tighten loose connections 2x/yr Electrical Inspections and Maintenance: Perform Check integrity of weather resistance (seals, hubs and weather stripping) Check electrical equipment housing for signs of corrosion Perform Infrared scans, as needed In Contract Year 1 only, four single-technician, one-day dispatches for labor only corrective maintenance as needed 1x/yr Inverter Inspections and Maintenance: Check integrity of weather resistance (seals, hubs and weather stripping) Check inverter housing for signs of corrosion Clean inverter air vents and heat sink clean filters Replace inverter filters in AE Solaron model 250, 333, 500 and Satcon model 75, 250 central inverters Perform Infrared scans, as needed 1x/yr Array Washing: Includes normally expected soiling conditions. Heavy cleaning, such as excessive soiling, debris removal, bird droppings and soot, not to exceed 10% of total array 2x/yr & Additional Upon request Carport Solar Panel Washing and Cleaning: Carport Solar Panel Washing & Cleaning to occur on a weekend. 2x/yr Vegetation Control: Remove or mow weeds and grasses located in accessible areas under the array. Turn off solar panels and ensure solar panels and inverters are not damaged. 1x/yr Contractor shall provide a completed maintenance checklist within 3 weeks following each visit, which includes a list of issues discovered, resolution, and accompanying photos as appropriate. Carport solar panel washing & cleaning needs to be performed on the weekends. Solar Panel Locations: Solar Array Location Solar Monitoring Inverters myPVData 333 KW Solaron Inverter Site 3- West of Building 304 Employee Parking Lot myPVData Two 333 KW Solaron Inverter Site 4- West of Building 402 Employee Parking Lot myPVData One 333 KW and one 250KW Solaron Inverters Site 5- Ground Mount North of Helipad myPVData 250 KW Solaron Inverter Building 500 Rooftop myPVData 250 KW Satcon Inverter Buildings 510 & 511 Rooftops myPVData 75 KW Satcon Inverter Building 213 Rooftop Draker (2) SMA SB 9000TL & (2) SMA SB 8000TL Building 218 Rooftop Draker (5) SMA SB 9000TL Building 222 Rooftop Draker (2) SMA SB 9000TL & (2) SMA SB 8000TL Building 401 Rooftop Draker (2) Refusol 016K & (2) Refusol 012K Building 304 Rooftop Draker (2) Refusol 020K & (2) Refusol 016K Building 508 Rooftop Draker (6) SMA SB7000TL Parking Lot 12 & 299 Draker (1) 250 KW Solaron Parking Lot 49 Draker (1) Refusol 024K, (4) Refusol 020K, & (2) Refusol 012K South of Heliport Ground Mount Draker 500 KW Solaron Inverter The Government will provide the following: Site access and a safe working environment. Facility contacts to provide real time information about site conditions (power outage, active construction, etc.). Coordination and closing the parking area for the washing and maintenance activities during the weekends. Contractor can use VA West LA outdoor water source but may have to provide means to transport water as needed and required if water source is not close to solar arrays. Contractor to verify water sources. Field work will be performed during local business hours unless otherwise agreed by the solar contractor and the VA COR The Contractor will not provide the following: Hardware or firmware upgrades or refurbishments Installation refurbishments to bring equipment in compliance with new code or revised manufacturer requirements. Cosmetic corrosion repair. Rules of the Station: Contractor shall comply with all rules of the facility, including security badging, non-smoking and privacy, and reporting to the COR upon arrival at the facility. The Contractor shall present a neat, well-groomed, professional appearance at all times. The Contractor personnel shall not wear sandals, flip-flop style footwear, or open-toed shoes. Safety: Contractor shall perform electrical safety measurements on all equipment in use under this contract. The standards to be used are those of the National Fire Protection Agency code 99. A copy of these codes shall be provided by the VA Engineering Department upon request. These standards shall be strictly enforced. Any equipment not meeting the minimum standards shall be considered inoperable until such time as its passes the minimum standards. All equipment shall be subject to inspection by VA Engineering personnel to verify compliance with these standards. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VA property shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Contractor shall take such safety precautions as necessary to protect the lives and health of the occupants of the building. Fire and safety deficiencies, which exist and are part of the responsibility of the Contractor shall be immediately corrected. If the Contractor fails or refuses to correct deficiencies promptly, the CO may issue an order stopping all, or any part, of the work. Contractor shall comply with all applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. The Contractor personnel shall follow applicable facility policies concerning fire/disaster programs. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137 Contractor should provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employee s fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. PERFORMANCE MONITORING. VA COR will be delegated to each facility to assist the Contracting Officer in the administration and monitoring of the resulting contract. A Delegation of Authority letter issued to the COR, a copy of which will be sent to the Contractor, states the responsibilities and limitations of the COR. The COR is not authorized to change any of the terms and conditions of the resulting order. The Contracting Office Representative (COR) will monitor contractor performance. The COR will certify the work was done in accordance with the SOW. COR will inspect the system once the service has been completed and the system is returned to normal operation. The Contractor shall comply with all applicable regulations and guidelines of the Joint Commission (JC), Occupational Safety and Health Administration (OSHA), California Public Utility Commission and/or any other pertinent federal, state, and local policies relating to the herein mentioned work. All tasks accomplished by the Contractor personnel shall be performed to preclude damage or defacement to patient or Government-owned property, equipment, and facilities. The Contractor shall report any damage caused by the Contractor personnel to the COR. The Contractor shall replace items or repair property, equipment, or facilities to previous condition, if the Contractor is determined to be at fault for the damage. Only those services specified herein are authorized under this contract. Before performing any service or repairs of a non-contract nature, the COR or Contracting Officer must be advised of the reasons for this additional work. If appropriate, the Contracting Officer or his/her designee may authorize the additional emergency and unforeseen repairs under a separate purchase authorization or this contract. The Vendor is cautioned that only the Contracting Officer may authorize additional services or repairs and that reimbursement will not be made unless this prior authorization is obtained. PERIOD OF PERFORMANCE. The period of performance is Base Year plus up to four (4) option years This project shall be completed Monday Through Friday, 7:00 AM to 5:00 PM, except on Federal holidays or any other holiday declared by the President of the United States as a national holiday. SERVICES OUTSIDE OF NORMAL SERVICES: Hours of Operation as agreed to in writing between the Contractor and Contracting, for solar cleaning of carports to be performed preferably during weekends. Solar carports will be washed and cleaned during the weekends The Vendor is not required to provide service on the following National holidays, nor shall the Vendor be paid for these holidays. The following national holidays observed by the Federal Government New Year s Day January 01 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 04 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 CONTRACTOR EMPLOYEES The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC). Badge. Contractor shall obtain a Contractor I.D Badge from the VA Police. All Contractor personnel are required to wear I.D Badge during the entire time on VA facility. The I.D Badge MUST have an identification picture and shall state the name of the individual and the company represented. PARKING: It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office. The Contractor assumes full responsibility for any parking violations. Smoking is strictly prohibited on the grounds of any VHA facility. Per VHA Directive 1085 dated March 5, 2019, it is VHA policy that all VHA health care facilities, including hospitals, community clinics, administrative offices, and Vet Centers, will be smoke-free for patients, visitors, contractors, volunteers, and vendors effective October 1, 2019. There will no longer be designated smoking areas. INSURANCE COVERAGE a. The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract. b. The Government shall be held liable for any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract. c. Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer. d. The Contractor shall furnish to the Contracting Officer within fifteen (15) days of award an Official Certification from the insurance company indicating that the coverage has been obtained and that it may not be changed or cancelled without guaranteed thirty (30) day notice to the Contracting Officer. New certifications shall be furnished at least thirty (30) days prior to the expiration date of the current insurance policy. The phrase will endeavor is not acceptable terms to the Government and such coverage carrying that phrase will be rejected and services may not be rendered until proper certificate is issued. e. SUPPLEMENTAL INSURANCE REQUIREMENTS In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract: (a) Workers' compensation and employer s liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (b) General Liability: $500,000.00 per occurrence. (c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage. (d) The successful bidder must present to the Contracting Officer, prior to the award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage. E.1 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES GENERAL INSTRUCTIONS TO OFFERORS: Submit written offers in accordance with the following instructions, as well as Addendum to FAR 52.212-1, Instruction to Offerors. Oral offers will not be accepted. Complete and submit enclosure 1 via email no later than 10am PST Monday, December 7th, 2026, to ositadima.ndubizu@va.gov. Ensure the following are completed and/or included in the quote packet: Vendor Information with UEI number (Company info and quote should be on Enclosure 1 form pg. 1) Acknowledgement of amendments (Enclosure 1 form pg. 1) Concurrence/non-concurrence with solicitation terms, conditions, and provisions (Enclosure 1 form pg. 1) Schedule of services (Enclosure 1 form pg. 2) FAR 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services (Enclosure 1 form pg. 4) VAAR 852.219-75, VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction (Enclosure 1 form pg. 2) Company info and quote should be on the attached Enclosure 1 form. All other forms of offer will not be accepted. Your enclosure form, capabilities statement/experience and any certifications/Training should be sent in one email on separate email attachments, or it will not be accepted. SPECIAL STANDARDS OF RESPONSIBILITY To assist the contracting officer in determining if the special standards of responsibility applicable to this procurement are met, offerors are asked to provide the following information with their [offers]. Failure to include this information could result in a contracting officer s determination that an otherwise successful offeror is not eligible for the contract award. SP1: Special Licensure. Offeror or proposed subcontractor shall submit evidence that they are an authorized service provider for REC Solar Commercial Corporation. SP2: Specialized Training. Offerors or proposed subcontractor shall submit evidence that they possess a 30-hour Occupational Safety and Health Administration (OSHA) safety card issued by the State of California. The Lead Solar PV Technician submit evidence that they possess a 10-hour Occupational Safety and Health Administration (OSHA) safety card issued by the State of California. Evidence of passing the NABCEP Entry Level Exam is preferred, not required. North American Board of Certified Energy Practitioners (NACEP) Certified PV Installation Professional is preferred (not required).  SP3: Specialized Experience. Contractor must have at least 7 years experience troubleshooting, repairing, obtaining necessary parts to repair Satcon 75KW, 250KW, AE Advanced Energy Solaron 250 KW, 333 KW, 500 KW, SMA and Refusol type of solar inverters. The Lead Solar PV Technician shall have at least 2 years of electrician experience; 7 years of Solar PV experience. Project Manager/Field Supervisor shall have at least 7 years of Solar PV experience with similar size solar projects over 3 MW of solar system. Offeror shall provide references for which the contractor has performed services as described in the scope. The narrative must include contract numbers or reference point of contact to include  telephone numbers and e-mail addresses. References will be contacted to verify technical capability to fulfil the requirements listed in the Scope of work. If Offeror intends to satisfy this requirement through use of a proposed subcontractor(s), Offeror must provide this information for each proposed subcontractor. (End of provision) ADDENDUM to 52.212-2 Evaluation Commercial Products and Commercial Services (NOV 2021) (a) Basis of Award. This procurement is being conducted pursuant to FAR Part [13] procedures. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose [offer], conforming to the solicitation, [offers] the lowest price, whose [offered] price does not exceed the amount of funding available for the procurement, and whose [offered] price is found to be reasonable. Price alone is the sole evaluation factor. In addition to the general standards of responsibility found at FAR § 9.104-1, in accordance with FAR § 9.104-2, the special standards of responsibility described below apply to this procurement. Offerors who fail to meet any special standard of responsibility will not be eligible to receive a contract award.  (b) Evaluation Process. Quotes will be evaluated in the following manner. The lowest-priced quote will be identified. The lowest-priced quote will be evaluated to determine if the quoted price exceeds the amount of funding available for the procurement. If the quoted price does not exceed the amount of funding available for the procurement, the quoted price will be evaluated to determine if it is reasonable. If the quoted price is found to be reasonable, the offeror who submitted this quote will be identified as the successful offeror. The contracting officer will then determine if the successful offeror is responsible using the general standards of responsibility and the special standards of responsibility applicable to this procurement. If a contract award cannot be made to the successful offeror, the contracting officer will evaluate the next lowest-priced quote following the procedures described above. This process will continue until a contract award can be made, or the contracting officer determines that no contract award can be made. The contracting officer may find all quotes not acceptable and cancel the solicitation if the lowest-priced quote exceeds the amount of funding available for the procurement. The contracting officer may likewise find a quote under evaluation, as well as all remaining quotes, not acceptable and cancel the solicitation if the quote currently under evaluation exceeds the amount of funding available for the procurement. The Government intends to evaluate quotes and award a contract without discussions with offerors. However, the Government reserves the right to conduct discussions at any time if determined by the contracting officer to be in the Government s interest.   (c) Options. The Government will evaluate [offers / quotes] for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an [offer] is unacceptable if the option prices are significantly unbalanced or if the [offered] price for the basic requirement or any option exceeds the amount of funding available for any of those requirements. Evaluation of options should not oblige the Government to exercise the option(s).   (d) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before the award.  (End of provision) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04, dated 6/11/2025. Full versions of the following provisions and clauses for this solicitation can be found in enclosure 2. 3.a. FAR 52.212-1, Instructions to Offerors Commercial Items 3.b. FAR 52.212-2, Evaluation -- Commercial Items 3.c. FAR 52.212-4, Contract Terms and Conditions -- Commercial Items 3.d. FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items 3.e. VAAR 852.219-73, VA Notice of Total Set-Aside for Verified Service-Disabled Veteran-Owned Small Businesses 3.f. VAAR 852.219-75, VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. 3.g. FAR 52.233-2, Service of Protest 3.h. VAAR 852.233-70, Protest Content/Alternative Dispute Resolution 3.i. VAAR 852.233-71, Alternative Protest Procedure 3.j VAAR 852.222-71 Compliance with Executive Order 13899 | 53% | Combined Synopsis | 12/07/2026 |
AMENDMENT 10/06/205 The purpose of this Amendment is to answer questions (pages 11 12) submitted after the site walk in time for final submission of responses on 10/10/2025 at 10:00 PST at Norman.Napper-Rogers@va.gov. Subject line shall include RESPONSE TO RFQ 36C26226Q0022. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * AMENDMENT 10/02/205 The purpose of this Amendment is to extend the due date for final submission of responses to 10/10/2025 at 10:00 PST at Norman.Napper-Rogers@va.gov. Subject line shall include RESPONSE TO RFQ 36C26226Q0022. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * AMENDMENT 09/24/2025. The purpose of this Amendment is to add a site walk to the contact. The site walk will be conducted on 10/01/2025. The walk will begin on time at 08:30 AM. Please be 15 min early to get checked in. Meeting outside the FACILITIES MANAGEMENT SERVICE (FMS) building. Park on the outer perimeter parking spaces of the campus. You will meet with COR Roger Kim. Please notify him of your intent to participate at 909-504-7959. There will not be an extension of the due date for final responses. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2025-05. This solicitation is set-aside for 100% Small Business concerns IAW FAR 19.203(c). The associated North American Industrial Classification System (NAICS) code for this procurement is 221114, with a small business size standard of 500 Employees. The FSC/PSC is Z1MG. The VA Loma Linda Healthcare System (VALLHCS), Jerry L. Pettis VA Medical Center (VAMC), located at 11201 Benton Street, Loma Linda, CA 92357-1000 is seeking to purchase Solar Photovoltaic System Preventive Maintenance Inspection and Repair (PMIR) services. All interested companies shall provide quotations for the following: Supplies/Services STATEMENT OF WORK (SOW) GENERAL Introduction: The VA Loma Linda Healthcare System (VALLHCS) located at 11201 Benson Street Loma Linda, CA 92357 requires Solar Photovoltaic (PV) Maintenance services for one base and up to four option years. Background: The VALLHCS currently has five solar arrays and metered inverters on-site; four arrays mounted on the carports in the parking lots and one on the garage structure. The total capacity of the solar PV arrays is 1.421 MW-DC. Table 1 Solar PV System Information Array Location Inverter Manufacturer Inverter Size (kW-AC) Array Size (kW-DC) Module Quantity 4 Parking Lot (carport) Solaron 500 580.944 2,352 5 Parking Lot (carport) Solaron 333 359.632 1,456 7 Parking Lot (carport) Satcon 135 148.694 602 8 Parking Lot (carport) Satcon 75 82.992 336 9 Parking Garage Structure Solaron 250 248.976 1,008 OBJECTIVE Description: The VALLHCS installed a grid-tied solar PV system that is connected to the facility s 480V service bays with no energy storage or backup feature in November 2013. The solar modules are Samsung model LPC247M-08. The inverters are metered and monitored from the Data Acquisition System (DAS), using Athea platform. The inverter was rated at 1,420 kW-AC. The system was rated at 1,701 kW-DC STC and 1,490 kW-AC CEC. The system has downsized when the rooftop arrays were removed in September 2024. The VALLHCS had solar PV maintenance services from April 2020 to March 2025 and requires renewal of full maintenance services. Scope of Work: The contractor shall provide all labor, materials, tools, equipment, engineering, transportation, qualified personnel, supervision and other services necessary for performing solar PV system management, maintenance, repair, cleaning, and training to the manufacturer and industrial standards. The purpose is to manage system performance for optimum solar generation. System Management: The contractor shall provide system management services to include monitoring the DAS, responding to alarms, tracking work orders/services, administrating warranty/utility, and reporting performance. System Production Report: The contractor shall provide, via DAS, a monthly and annual energy production reports showing the actual system performance within first two weeks of the month. Preventative Maintenance: The contractor shall provide inspections, testing, cleaning, and preventative maintenance (PM) services in accordance with manufacturers recommendations. Preventative Maintenance Report: The contractor shall provide a completed maintenance checklist/log, list of issues discovered, resolution, and appliable photos as appropriate within two weeks of each visit. System Repair and Training: The contractor shall provide repairs and training as needed to maintain the solar PV system. Specific Requirements: Conference Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. The contractor shall facilitate monthly meetings on Microsoft Teams with meeting minutes to discuss reports, services, and any agenda that will optimize the performance of the solar PV system. Quality Control Program: The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with the Scope of Work. The contractor implements procedures to assure their work complies with the requirements of the contract. The QCP shall be delivered within 21 days after contract award and revised annually for Contracting Officer Representative (COR) review/approval. Site-Specific Safety Plan: The contractor shall develop and maintain an effective Site-Specific Safety Plan to ensure safe services are performed in accordance with standard electrical and PV safety practices. The contractor implements procedures to identify, prevent, and train contractor personnel in event of medical or site emergency. The plan shall be delivered within 21 days after contract award and revised annually for COR review/approval. Applicable Publications: The contractor shall abide by all latest applicable regulations, publications, manuals, and local policies/procedures to include but not limited to OSHA, NFPA, IEEE, NEC, and VA/VHA Directives. Qualifications: The contractor site manager shall have at least three years of solar PV experience, possess an OSHA 30-Hour Occupational Safety and Health Training Course card, and preferably obtain a North American Board of Certified Energy Practitioners (NABCEP) Board Certification. The contractor solar PV technician(s) shall have at least two years of electrician experience, one year of solar PV experience, possess at lease an OSHA 10-Hour Occupational Safety and Health Training Course card, and preferably obtain a NABCEP Associate Credential. The resumes and copy of the OSHA cards shall be delivered within 21 days after contract award for COR review/approval. Adequate Workforce: The contractor shall maintain stability and continuity of an adequate workforce for uninterrupted performance of all services. Background Check: The contractor personnel performing work must have a general employment background check at the time of the proposed submission and must maintain the level of security required for the life of the contract. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. Access Control: The contractor shall establish and implement methods of ensuring all badges and keys issued to the contractor by the government are not lost, misplaced, duplicated and are not used by unauthorized persons. Government Responsibilities: Furnished Items and Services: The COR or facility personnel will provide site access to the solar PV system to perform the services or will allow the contractor to check-out a key and temporary badge from the Facilities Management Service. Technical Documents: The COR will provide Operation & Maintenance (O&M) manuals, as-builds, and any technical documents on file. The contractor is responsible for the accuracy of the technical documents. Water Source: The government will provide access to water spigot for use in module washing. The contractor is responsible for water conservation practices. Quality Assurance: The COR will evaluate the contractor s performance on the deliverables and services. General Maintenance Services Furnished Items and Services: The contractor shall provide compatible software/hardware parts or equipment with the existing PV system/design. The cost of labor, materials, equipment, and other services shall be submitted to the COR for review/approval prior to any work. Site Visits: The contractor shall notify the COR at least one month of any site visits or services to discuss and coordinate the best course of action with the VA Police, Facility, Safety, and any other departments involved. The contractor shall check-in and check-out with the COR for each site visit. System Management: The contractor shall provide system management services to include monitoring the DAS, responding to alarms, tracking work orders/services, administrating warranty/utility, and reporting performance. The contractor shall respond and notify the COR for discussion/decision on the path forward to resolve/repair the issue to the alarms from the DAS as follows in Table 2. Table 2 Alarm Response Level Response Level General Description Remote Response Field Response 1 Emergency (Safety related issues and/or complete site outages) ½ Day 1 Day 2 Critical System Production Issues (Inverter Loss or Weather Adjusted Performance <80%) ½ Day 2 Days 3 Communications or DAS Issue (not classified as Tier 1 or 2) ½ Day 3 Days 4 Non-Critical Low Production: (80% < Weather Adjusted Performance <90%) 1 Day 5 Days 5 General Issue, not falling into the categories above 1 Day As needed Preventative Maintenance: The contractor shall provide PM services and cleaning for PV array and inverters in accordance with SunWize O&M manual, Solaron User manual, and Satcon manual. The contractor shall develop, complete, and submit a PM checklist/log sheet for record of performance. The contractor shall document deficiencies with appliable photos and resolutions in a PM report within two weeks of PM performance. Table 3 Example of Preventative Maintenance Services Preventative Maintenance Service Description Service Frequency General Inspections: Visual inspection for signs of damage, overall wear and tear, module breakage, loose conduit, broken straps, etc. Sample check torque marks and tighten loose connections Electrical Inspections and Maintenance: Perform manufacturer s preventative maintenance on electrical equipment Check integrity of weather resistance (seals, hubs and weather stripping) Check electrical equipment housing for signs of corrosion Perform infrared scans, as needed Inverter Inspections and Maintenance: Perform manufacturer s preventative maintenance Check integrity of weather resistance (seals, hubs and weather stripping) Check inverter housing for signs of corrosion Clean inverter air vents and heat sinks clean filters Perform infrared scans, as needed Monitoring Equipment Inspection: Clean and verify readings of pyranometer(s) Check integrity of cell temperature sensor and verify DAS readings Check other weather station components Check that the System meter is reading accurately Array Washing: Includes normally expected soiling conditions. Heavy cleaning, such as excessive soiling, debris removal, bird droppings and soot, not to exceed 10% of total array. Vegetation Control: Remove or mow weeds and grasses located in accessible areas under the array Tracker Maintenance: Perform manufacturer s preventative maintenance Check limit switches and backtrack function if applicable Check torque and tolerances on all dynamic components Grease all zerk fittings Inspect all rubber/plastic components, boots, and bushings Corrective Maintenance: The contractor shall provide corrective maintenance (not listed, within the scope of the contract) to scheduled and unscheduled issues or failures as necessary in a timely manner to restore the system to the required levels of performance. The contractor shall notify the COR of the issues and provide supporting documents/services for corrective maintenance. The cost of corrective maintenance shall be preapproved by the Contracting Officer. Technical Assistance and Training: The contractor shall provide technical assistance and training to ensure VA personnel are generally familiar with the PV systems, components, and safety. Technical assistance may be needed for specialized work, including warranty or utility applications. Billing and Payment: The contractor shall email invoices to the COR for review/approval after the completion of service. Once approved, the contractor shall submit the invoice on the Tungsten Network for government invoice processing. Table 4 Example Line Items for Services Items Service Frequency Cost ($/yr) 1 System Management: DAS monitoring, alarm responding, work order tracking, warranty/utility administrating, technical assistance, training, and reporting M - F 2 Preventive Maintenance: inspection/checks, torquing, cleaning, troubleshooting, thermal scanning, recording, and etc. 2x / yr 3 Module washing and inspection 2x / yr 4 Corrective Maintenance As needed Total Base period (and recurring option years up to 4 years) Total Period of Performance The period of performance (POP) will be one base period and four one-year option years (OY). At the end of each POP, the government may extend the term of the contract unilaterally. Base Period: November 01, 2025 - October 31, 2026. OY1: 11/01/2026 10/31/2027. OY2: 11/01/2027 10/31/2028. OY3: 11/01/2028 10/31/2029. OY4: 11/01/2029 10/31/2030. Free On Board (FOB) is destination for this purchase order. Place of Performance/Place of Delivery Address: Department of Veterans Affairs VA Loma Linda Healthcare System (VALLHCS) Jerry L. Pettis VA Medical Center (VAMC) 11201 Benton Street Loma Linda, CA Postal Code: 92357-1000 Country: UNITED STATES The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023) ADDENDUM to FAR 52.212-1 FAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998) FAR 52.204-7, System for Award Management (NOV 2024) FAR 52.204-16, Commercial and Government Entity Code Reporting (AUG 2020) FAR 52.204-20, Predecessor of Offeror (AUG 2020) FAR 52.217-5, Evaluation of Options (JUL 1990) FAR 52.233-2, Service of Protest (SEPT 2006) VAAR 852.209-70, Organizational Conflicts of Interest (OCT 2020) VAAR 852.233-70, Protest Content/Alternative Dispute Resolution (OCT 2018) VAAR 852.233-71, Alternate Protest Procedure (OCT 2018) VAAR 852.252-70, Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) End of Addendum to 52.212-1 FAR 52.212-2, Evaluation-Commercial Items (NOV 2021) FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services (MAY 2024)(DEVIATION FEB 2025) Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: FAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services (NOV 2023) ADDENDUM to FAR 52.212-4 FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998) FAR 52.203-16, Preventing Personal Conflicts of Interest (JUN 2020) FAR 52.204-13, System for Award Management Maintenance (OCT 2018) FAR 52.204-18, Commercial and Government Entity Code Maintenance (AUG 2020) FAR 52.217-8, Option to Extend Services (NOV 1999) FAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000) FAR 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2024) FAR 52.223-10, Waste Reduction Program (MAY 2024)(DEVIATION FEB 2025) FAR 52.228-5, Insurance-Work on a Government Installation (JAN 1997) CL-120, Supplemental Insurance Requirements FAR 52.229-3, Federal, State, and Local Taxes (FEB 2013) FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation (APR 1984) FAR 52.237-3, Continuity of Services (JAN 1991) VAAR 852.203-70, Commercial Advertising (MAY 2018) VAAR 852.222-71, Compliance with Executive order 13899 (DEVIATION)(APR 2025) VAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018) VAAR 852.242-71, Administrative Contracting Officer (OCT 2020) End of Addendum to 52.212-4 FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (JAN 2025)[(DEVIATION JUL 2025)] The following subparagraphs of FAR 52.212-5 are applicable: (b)(1), (4), (5), (7), (9), (12), (18)(i), (22), (23), (26), (29), (31), (35)(i), (36)(i), (37), (38), (39), (40), (46), (51), (55), (59), (63), (c)(1), (3), (7), and (8). FAR DEVIATION FEB 2025 Instructions: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM. All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests. This is accomplished through the Tungsten Network located at: http://www.fsc.va.gov/einvoice.asp. This is mandatory and the sole method for submitting invoices. All quoters shall submit the following: All information required by FAR 52.212-1(b) Submission of Offers. All quotes shall be sent to the Network Contracting Office (NCO) Norman.Napper-Rogers@va.gov. Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Options will be evaluated at time of award. The following are the decision factors: Price, and past performance, with price more important. Past performance will be based on CPARS and FAPIIS ratings. No rating in CPARS is equal to a neutral rating. The award will be made to the response most advantageous to the Government. Responses should contain your best terms, conditions. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoters shall list exception(s) and rationale for the exception(s), if any. Final submission of your response shall be received not later than 10/10/2025, 10:00 PDT at Norman.Napper-Rogers@va.gov only. Subject line should include RESPONSE TO RFQ 36C26226Q0022. Submissions shall include your quote using the attached schedule as well as a capabilities statement with qualifications proving all certifications and education required for the work being conducted in the SOW, as this is highly scientific and regulated. Submissions not meeting all requirements of the SOW will be considered ineligible for award. Quotes should be based on the information provided as no discussions will be allowed. This solicitation is being made under FAR 13.106-2(b)(3) using Simplified Acquisition Procedures. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. Point of Contact Norman Napper-Rogers, Contracting Officer, Norman.Napper-Rogers@va.gov. Questions & Answers (Q&A) The following questions were raised after the site walk that was conducted on 10/01/2025. Could you please clarify the requirements in SOW 2.2.1? Specifically, should offerors include monitoring services in their pricing, or should we assume continuation of the existing management approach as stated in the SOW? Yes, SOW 2.3.11.3 elaborates little farther, and it includes monitoring/subscribing into the existing DAS. We are currently on Athena platform which is powered by stem and AlsoEnergy (ae). From the SOW 2.3.12.1 Table 4, the expectation is to gain access and login on the ae PowerTrack shown below Monday through Friday, preferably couple minutes during the hours of generation/production to see any issues. The previous contractor mentioned that alarms/notifications can be setup that are out of range to help monitor the system. The ae PowerTrack subscription is good through 8/23/2026 and will need to be renewed by the contractor. For more information, you can contact AlsoEnergy s Tech Support at 866.303.5668 or support@alsoenergy.com. Also, the ae PowerTrack generates analysis and reports that can be used to report performance on our monthly meetings (SOW 2.3.1.). The solicitation makes mention of Corrective Maintenance to be performed as needed. Could we get more information on that? Is there a maximum or minimum number of hours for this? It would help with our budget planning. To help with VA budget planning, SOW 2.3.12.1 Table 4 mentions Corrective Maintenance (up to 100 hours/year). That has been the average hours from experience shown below. However, we also had cases where we had to repair/replace beams. We are also getting close to inverters end of life and may need replacements in the future. Since the corrective maintenance is to be performed as needed, there is no limit on the hours. Our previous contractor provided Time and Material (T&M) rates as part of the price proposal and was used to propose the cost of the corrective maintenance when an issue was identified. The cost will be reviewed and if approved, a modification will be issued. What is the name of the incumbent contractor, contract number, and contract value? Name: CAMS Renewable Services, LLC. Contract: 36C26225P1373 Value: $248,607.48 | 94% | AwardedArchived | Open |
Preventatitve Maintenance and repair of downed solar arrays | 94% | AwardedArchived | Open |
94% | AwardedArchived | Open | |
56% | AwardedArchived | Open |
Additional Details
Solicitation Number
36C26226P0077
Archive Date
Nov 19, 2025
Office Address
Gilbert, AZ, 85297