Upgrade X-Ray Controller
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM CST
- Posted
- October 29, 2026
- Notice type
- Presolicitation
- NAICS
- 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8125 AFSC PZIMA
- Place of performance
- 0, Oklahoma, 73145
- PSC
- 6625: ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- C27-003
- Notice ID
- a465d208acaf4bd6bf8b14ac8dc956f4
Description
The 76 CMXG is requesting the utilization of funds for the procurement of Upgrade Xray controller and Automated Equipment. In accordance with AIR FORCE T.O 33B-1-2 (Table 3, Master List of Suppo1t Equipment), the system must be an approved equivalent to the X-Ray Apparatus Set (Master/Procmement NSN: MIL-PRF-32133/6635-01-394-5926). The required system must strictly adhere to the following component specifications:
SYSTEM SPECIFICATIONS (Upgrade X-ray booth X-ray controller and automated equipment)
• Hardware: Includes new servo motors, drives, operator control user interfaces, and manual controls hardware.
• Software: Features programmable motion control software based on Parker Motion Systems libraries. It includes an intuitive interface for custom motion programs, automatic inspection positioning for repeatable programs, and digital image capture/save capabilities.
• System Integration: The upgraded motion program will operate on the existing Vecow PC, interfacing directly with cmTent imaging software.
INSTALLATION, TRAINING AND DOCUMENTATION
• Installation & Training: Installation and a minimum of 4 homs of Operator and Maintenance Training onsite. (Covers travel, labor, shipping, and necessaiy bracketing hai·dwai·e to mount/remove equipment in the CMXG TSG X-ray System, with up to two (2) days onsite for installation, testing, debugging, and system acceptance).
• Removal and Disposal of the existing equipment.
• Documentation: Deliver three (3) complete sets of engineering manuals, which include drawings, schematics, and troubleshooting guides.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Presolicitation
B2210 Upgrade X-Ray Controller
- 2Version 2PresolicitationCurrent
Upgrade X-Ray Controller
Similar Opportunities
Additional Details
Solicitation Number
C27-003
Archive Date
Nov 20, 2026
Office Address
TINKER AFB, OK, 73145-3303