GovChime
Notice ID: a465d208acaf4bd6bf8b14ac8dc956f4Presolicitation

Upgrade X-Ray Controller

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CST
Posted
October 29, 2026
Notice type
Presolicitation
NAICS
334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8125 AFSC PZIMA
Place of performance
0, Oklahoma, 73145
PSC
6625: ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
C27-003
Notice ID
a465d208acaf4bd6bf8b14ac8dc956f4

Description

The 76 CMXG is requesting the utilization of funds for the procurement of Upgrade X­ray controller and Automated Equipment. In accordance with AIR FORCE T.O 33B-1-2 (Table 3, Master List of Suppo1t Equipment), the system must be an approved equivalent to the X-Ray Apparatus Set (Master/Procmement NSN: MIL-PRF-32133/6635-01-394-5926). The required system must strictly adhere to the following component specifications: 


SYSTEM SPECIFICATIONS (Upgrade X-ray booth X-ray controller and automated equipment) 

•    Hardware: Includes new servo motors, drives, operator control user interfaces, and manual controls hardware.
•    Software: Features programmable motion control software based on Parker Motion Systems libraries. It includes an intuitive interface for custom motion programs, automatic inspection positioning for repeatable programs, and digital image capture/save capabilities.
•    System Integration: The upgraded motion program will operate on the existing Vecow PC, interfacing directly with cmTent imaging software.

INSTALLATION, TRAINING AND DOCUMENTATION

•    Installation & Training: Installation and a minimum of 4 homs of Operator and Maintenance Training onsite. (Covers travel, labor, shipping, and necessaiy bracketing hai·dwai·e to mount/remove equipment in the CMXG TSG X-ray System, with up to two (2) days onsite for installation, testing, debugging, and system acceptance).
•    Removal and Disposal of the existing equipment.
•    Documentation: Deliver three (3) complete sets of engineering manuals, which include drawings, schematics, and troubleshooting guides.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 1
    Version 1Presolicitation

    B2210 Upgrade X-Ray Controller

    Notice d3e6f25992974aca8eda434f0b14d10b on SAM.gov

  2. 2
    Version 2PresolicitationCurrent

    Upgrade X-Ray Controller

    Notice a465d208acaf4bd6bf8b14ac8dc956f4 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

C27-003

Archive Date

Nov 20, 2026

Office Address

TINKER AFB, OK, 73145-3303