Granite Surface Plate Calibration and lapping - with Q&As
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM CST
- Posted
- October 27, 2026
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 541380: Testing Laboratories and Services
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.ACC-CTRS.ACC RI.W6QK ACC-RI
- Place of performance
- Rock Island, Illinois, 61299
- PSC
- J049: MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W519TC27QA007
- Notice ID
- a4c11f84919f46dea60f2305e06b9846
Description
Q&A's:
1. CLINs 0001 through 0005 (pages 3-5) are each one firm-fixed-price lot for "Inspection and calibration." SOW paragraphs 1 and 4.2 (pages 1-2) call for lapping only of plates that are out of specification, the QASP (Attachment 0002, page 1) says lapping repairs must be authorized by the CO or COR, and Section G, paragraph 6.a (page 12) asks for labor rates. Should each year's lot price cover inspection and calibration of all 18 plates, with lapping priced separately (for example, a per-plate price or an hourly labor rate) and billed only when authorized? Or should the lot price include all lapping that may be needed that year? If lapping is priced separately, where in the quote should those prices or rates be shown?
Answer: Firm fixed for calibration of all plates listed in the SOW. Lapping to be priced separately. We don’t know which plates will require lapping or how much lapping per plate will be needed. We are asking for an hourly rate for lapping. Whether the plate is big or small, the hourly rate would be the same. Plates may require a lot of lapping or very little. Pricing lapping by the plate doesn’t seem to make much sense.
2. Each CLIN (pages 3-5) states "All travel shall be in accordance with the Joint Travel Regulation (JTR)," and SOW paragraph 2 (page 1) says invoices will be checked against the contract prices and JTR approved prices. Should travel be included in each year's firm-fixed lot price, or will it be reimbursed separately at JTR rates? If it is reimbursed separately, how should travel be shown in the quote?
Answer: Include estimated travel costs in the firm-fixed pricing. The Vendor that gets the award will bill actual costs after the service.
3. Section G, paragraph 6.c (page 12) asks offerors to "concur at the bottom of the Scope of Work (SOW) and sign," but Attachment 0001 ends at paragraph 15.1 on page 4 with no concurrence or signature block. Is it acceptable to add a signed and dated concurrence statement at the bottom of SOW page 4, or to submit a separate signed concurrence page on company letterhead that references Attachment 0001 dated 15 Oct 26?
Answer: Either is fine by me.
_______________________
All Vendors MUST submit all requirements plus the signed Soliciation to the POC before the closing date and time or they will not be considered for this action.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (3)
- Download
Solicitation - W519TC27QA007 - updated.pdf
3.1 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment 0002 - QASP - Granite Surface Plates.pdf
158 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Attachment 0001 - Scope of Work (SOW).pdf
142 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
Granite Surface Plate Calibration and lapping
- 2Version 2Combined Synopsis/Solicitation
Granite Surface Plate Calibration and lapping
- 3Version 3Combined Synopsis/Solicitation
Granite Surface Plate Calibration and lapping - updated Docs
- 4Version 4Combined Synopsis/SolicitationCurrent
Granite Surface Plate Calibration and lapping - with Q&As
Similar Opportunities
Additional Details
Solicitation Number
W519TC27QA007
Archive Date
Nov 24, 2026
Office Address
ROCK ISLAND, IL, 61299-0000