Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 4:30 PM PST
- Posted
- November 3, 2026
- Notice type
- Special Notice
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 561210: Facilities Support Services
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- SPACE SYSTEMS COMMAND.FA4610 30 CONS PK
- Place of performance
- Lompoc, California, 93437
- PSC
- Z1AZ: MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- FA461027R0001
- Notice ID
- a6055c6b4b3f43e1b1a00ad69059e3de
Description
*See Amendments section at the bottom for updates/amendments to this draft RFP.
This Special Notice provides interested parties with information regarding the availability of the draft Request for Proposal (dRFP), review requirements, the tentative acquisition schedule, and the upcoming Industry Day and Site Visit.
This notice is for planning purposes only and does not constitute an invitation for bids, request for proposals, or quotes, nor does it indicate that the Government will contract for the items described herein. The Government will not reimburse respondents for any costs associated with submitting feedback or attending the events outlined in this notice.
The 30th Contracting Squadron (30 CONS/PKD) at Vandenberg Space Force Base (VSFB), CA, is requesting industry feedback on the dRFP for the Facility Readiness and Maintenance Execution (FRAME) contract. FRAME is the follow-on acquisition to the current Launch Operations Support Contract (LOSC) (Contract #FA4610-23-D-0001, currently performed by Call Henry, Inc.).
FRAME follow-on acquisition is 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) code for this effort is 561210 Facilities Support Services (small business size standard is $47M).
Description of Services, Background, and Objective: FRAME is a non-personal services contract that provides maintenance, repair, modification, and modernization for over 130 facilities, property, and equipment (P&E) supporting the nation’s space mission, defense, and test activities at VSFB and its associated geographically-separated locations.
The scope of work involves facility infrastructure and systems (including water and gas mains, roads, generators, power distribution, HVAC, waste systems, and roofing) alongside the execution of distinct sustainment projects and standby support for urgent repairs during select launch operations to ensure maximum operational readiness. Additionally, the contract encompasses the inspection, testing, and certification of all Space Launch Delta 30 cranes and elevators. A key change under this follow-on acquisition is that the South Vandenberg Power Plant (SVPP) is no longer a requirement and will not be carried over from the legacy LOSC to the new FRAME contract.
The primary objective of the FRAME contract is to ensure Real Property Installed Equipment (RPIE) and facilities are maintained and operationally ready for a variety of ballistic missile, space, guided weapon, and aircraft test and evaluation missions in support of Space Launch Delta 30 (SLD 30), 30th Civil Engineer Squadron (30 CES), 4th Launch Squadron (4 LS), 2nd Range Operations Squadron (2 ROPS), Missile Defense Agency (MDA), U. S. Space Forces - Space (S4S), 18th Space Defense Squadron (18 SDS), Sentinel, 30th Operations Support Squadron (30 OSS), 2nd Space Launch Squadron (2 SLS), the National Reconnaissance Office (NRO), and various other Range Users.
Mission Essential Services: The FRAME contract contains some mission-essential requirements which require continued support during peacetime, national emergency, and/or wartime scenarios.
Tentative Acquisition Schedule:
dRFP Release: 8 Sep 26
Final RFP Issuance: Jan 27
Proposals Due: Mar 27
Anticipated Award: 18 Dec 27
Performance Start: 1 Apr 28
4. Industry Day and Site Visit Event Details
Interested businesses are invited to register for the upcoming two-day event. Representatives will have the opportunity to attend a briefing detailing the contract structure, tour key range facilities, and participate in one-on-one sessions with the Government program team.
-
Dates: September 22, 2026 (General Briefing & Tour) – September 23, 2026 (One-on-One Sessions)
-
Location: Vandenberg Space Force Base (VSFB), CA
-
Maximum Attendees: Limited to two (2) representatives per prospective company due to base logistical constraints.
Registration and RSVP Deadlines:
-
Attendee RSVP & Security Vetting Submission: No later than Friday, September 11, 2026, at 16:30 Pacific Time. Provide your full name and company. Late requests may not be processed.
-
One-on-One Meeting Request: Companies interested in booking a one-on-one session with the program office must explicitly request it via email by Tuesday, September 15, 2026, at 16:30 Pacific Time. Slots are limited and will be scheduled on a first-come, first-served basis.
Maps and a tentative agenda are attached to this announcement to assist registered attendees with navigation and scheduling.
Base Access & Entry Requirements:
All site visit attendees must report to the Vandenberg Visitor Control Center (VCC), located at 6 California Blvd (Santa Maria Gate) prior to entry (VCC hours: 0600-1800).
-
Arrive Early: Attendees are strongly encouraged to arrive early to the Visitor Control Center to allow sufficient time for base entry processing and to avoid delays getting to the briefing.
-
Identification for Non-CAC Holders: Attendees who do not possess a Common Access Card (CAC) must present a REAL ID-compliant credential or a valid U.S. Passport. If an attendee does not have a REAL ID or a Passport, they must bring and present a standard state-issued Driver's License or ID card, a Birth Certificate, and a physical Social Security Card to obtain a base visitor pass.
-
Foreign Nationals will not be able to participate due to the time necessary to vet access.
5. Important Site Visit Disclaimers & Rules of Conduct:
-
Change of Solicitation Terms: Please understand that nothing said during the Industry Day briefings, site tours, or one-on-one sessions by any Government representative changes the terms, conditions, specifications, or requirements of the solicitation. If a change to the solicitation is determined to be necessary based on what is discussed or observed, it will be formally issued as a written amendment via email.
-
Photography and Video Restrictions: No photography or video recording is permitted on this installation at any time, unless specific, designated areas are explicitly pointed out and authorized by the hosting Facility Manager.
6. Submission of Questions & Comments (CRM)
The Government is actively seeking industry feedback on the Draft PWS and planned acquisition strategy to ensure clear, high-performing requirements.
To submit questions or comments concerning the acquisition and dRFP, prospective offerors must use the official Comment Resolution Matrix (CRM) Excel spreadsheet (which will be posted with the Draft RFP documents).
-
Completed CRM spreadsheets must be returned to the Points of Contact listed below.
-
The deadline for submitting dRFP and Industry Day comments is September 29, 2026, by 16:30 Pacific Time.
7. Primary Points of Contact
For all RSVP submissions, one-on-one requests, CRM question submittals or administrative questions, please send correspondence via email to BOTH of the following representatives:
- Primary POC (Contracting Officer):
-
Katherine Williams, 30 CONS/PKD
-
Email: katherine.williams.9@spaceforce.mil
-
-
Secondary POC (Contract Specialist):
-
Sabrina Swain, 30 CONS/PKD
-
Email: sabrina.swain.1@spaceforce.mil
-
*Amendments:
9/8/2026: This office is updating this draft RFP to update and add additional attachments.
9/29/2026: This office is updating the tentative acquisition schedule and extending the date of this draft RFP.
10/8/2026: This office is adding the following attachments to this draft RFP: FRAME Industry Day Brief, FRAME Industry Day CRM 20261008, and FRAME RFP_GFP List_07Oct2026.
10/26/2026: This office is adding the following attachement to this draft RFP: Frame Industry Day Attendees POCs 20261026.
UPDATE - 11/3/2026: This office is updating this draft RFP to add a second draft RFP package.
The Government has posted an updated (second) version of the draft Request for Proposal (dRFP) package for the Facility Readiness and Maintenance Execution (FRAME) contract.
Interested parties are requested to review the complete updated package and submit any questions or comments using the official Comment Resolution Matrix (CRM) spreadsheet. All files associated with this release include "v2" in the filename. Files provided as part of the Technical Library include "TL" in the filename.
CRM / Comment Deadline: 22 November 2026 by 16:30 Pacific Time.
Completed CRM spreadsheets must be emailed to both of the following Points of Contact:
- Contracting Officer: Katherine Williams, katherine.williams.9@spaceforce.mil
- Contract Specialist: Sabrina Swain, sabrina.swain.1@spaceforce.mil
Note: The revised CLIN structure is reflected in the Cost/price Workbook under the Section B tab. Offerors should carefully review this tab when preparing any feedback or future pricing models.
Updated Tentative Acquistion Schedule:
- Second dRFP Posted: 3 November 2026
- CRM Comments Due: 22 November 2026
- Final RFP Issuance: 20 January 2027
- Proposals Due: 21 March 2027
This remains a draft for planning purposes only. Nothing in this notice or the draft documents constitutes a formal solicitation or commitment by the Government.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (121)
- Download
TL SLD 30 FACILITY MNGR PRGM INSTR 32-1001v2.pdf
1.2 MBAdded in Special Notice version 6Posted - Download
TL Service call historical datav2.xlsx
299 KBAdded in Special Notice version 6Posted - Download
TL PTO 13968R4 and Part 70 Dec 2025v2.pdf
2.3 MBAdded in Special Notice version 6Posted - Download
TL PM Workload Matrix CLINv2.xlsx
33 KBAdded in Special Notice version 6Posted - Download
TL Pillar Point Launches or Sys Tests draftv2.pdf
72 KBAdded in Special Notice version 6Posted - Download
TL Pillar Point Outfall Drain Insp examplev2.pdf
104 KBAdded in Special Notice version 6Posted - Download
TL Launch Slips Liftoffs by OYs total hrsv2.xlsx
20 KBAdded in Special Notice version 6Posted - Download
TL ISWMP Final Sept 2026v2.pdf
4.4 MBAdded in Special Notice version 6Posted - Download
TL HPGSA-PV-230-VTE-01242024v2.pdf
696 KBAdded in Special Notice version 6Posted - Download
TL HPGSA-PV-229-VTE-01242024v2.pdf
719 KBAdded in Special Notice version 6Posted - Download
TL Framelight Policy Change 8 Jan 2024v2.pdf
102 KBAdded in Special Notice version 6Posted - Download
TL CES Launch Operations Support Templatev2.pdf
183 KBAdded in Special Notice version 6Posted - Download
TL CDRL A027 Testing and Cert Samplev2.pdf
664 KBAdded in Special Notice version 6Posted - Download
TL CDRL A026 Corr Prev Ctrl Rpt Samplev2.pdf
720 KBAdded in Special Notice version 6Posted - Download
TL CDRL A023 Emission Equip Usage Samplev2.xlsx
81 KBAdded in Special Notice version 6Posted - Download
TL CDRL A022 Backflow Prev Sys Rpt Samplev2.pdf
688 KBAdded in Special Notice version 6Posted - Download
TL CDRL A021 Cathodic Prot Bklet Samplev2.pdf
58 KBAdded in Special Notice version 6Posted - Download
TL CDRL A018 Solid Waste Report Samplev2.pdf
92 KBAdded in Special Notice version 6Posted - Download
TL CDRL A016 Daily Main Rpr Schdle Samplev2.pdf
37 KBAdded in Special Notice version 6Posted - Download
TL CDRL A015 Work Order Status Rpt Samplev2.xlsx
20 KBAdded in Special Notice version 6Posted - Download
TL CDRL A028 Weekly Main Rpr Schdle Samplev2.xlsx
17 KBAdded in Special Notice version 6Posted - Download
TL CDRL A014 PE Responsibility List Samplev2.xlsx
1.1 MBAdded in Special Notice version 6Posted - Download
TL CDRL A006 Consol Cost Lbr Fund Samplev2.xlsx
109 KBAdded in Special Notice version 6Posted - Download
TL 20250624 VSFB CCCPM for Submittal to DDWv2.pdf
4.4 MBAdded in Special Notice version 6Posted - Download
TL - FY26 12 Month TR list for Tech Libraryv2.xlsx
22 KBAdded in Special Notice version 6Posted - Download
Attch 13 FRAME DD254_RFP - draftv2.pdf
75 KBAdded in Special Notice version 6Posted - Download
Attch 12 Workload Factors - draftv2.xlsx
21 KBAdded in Special Notice version 6Posted - Download
Attch 11 GFP TRACKER - 2026 - draftv2.xlsx
149 KBAdded in Special Notice version 6Posted - Download
Attch 10 CRM Template - draftv2.xlsx
23 KBAdded in Special Notice version 6Posted - Download
Attch 9 Section M - draftv2.docx
76 KBAdded in Special Notice version 6Posted - Download
Attch 8 Section L - draftv2.docx
181 KBAdded in Special Notice version 6Posted - Download
Attch 8 L-1 BOE Workbook-draftv2.xlsx
84 KBAdded in Special Notice version 6Posted - Download
Attch 8 Cost Price Workbook-draftv2.xlsx
336 KBAdded in Special Notice version 6Posted - Download
Attch 7 SCA WD 2015-5647 (Rev 29)v2.pdf
251 KBAdded in Special Notice version 6Posted - Download
Attch 7 SCA WD 2015-5637 (Rev 34)v2.pdf
44 KBAdded in Special Notice version 6Posted - Download
Attch 7 SCA WD 1986-0431 (Rev 68)v2.pdf
26 KBAdded in Special Notice version 6Posted - Download
Attch 6 DB WD CA20260018 (Mod 6)v2.pdf
232 KBAdded in Special Notice version 6Posted - Download
Attch 6 DB WD CA20260014 (Mod 5)v2.pdf
81 KBAdded in Special Notice version 6Posted - Download
Attch 5 CBA IBEW 2024 12949 redactedv2.pdf
306 KBAdded in Special Notice version 6Posted - Download
Attch 5 Appdx B Wage Rate Tables redactedv2.pdf
125 KBAdded in Special Notice version 6Posted - Download
Attch 4 FRAME Incentive Plan - draftv2.docx
89 KBAdded in Special Notice version 6Posted - Download
Attch 3 Consolidated DID Files draftv2.pdf
1.7 MBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A030 Maintenance Data Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A029 Sustainment Roadmap Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A028 Weekly MR Schdle Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A027 Test Insp Rpt Draftv2.pdf
56 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A026 Corr Prev Ctl Plan Draftv2.pdf
55 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A025 RCM Plan Draftv2.pdf
55 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A024 Facility Asses Rpt Draftv2.pdf
3.7 MBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A023 Emission Equp Usage Draftv2.pdf
33 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A022 Backflow Prev Rpt Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A021 Cathodic Prot Bklet Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A020 Asbestos Lead Abate Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A015 Wrk Odr Status Rpt Draftv2.pdf
33 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A018 Solid Waste Rpt Draftv2.pdf
246 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A019 HMMP Rpt Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A017 Quality Mgmt Plan Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A016 Daily MR Schdle Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A014 PE Resp List Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A013 Accident Incdt Rpt Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A012 Security Mgmt Plan Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A011 Sys Safety Pgm Plan Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A008 GFP GFM Invtry Rpt Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A006 Intg Cst Lbr Reimb Draftv2.pdf
55 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A005 Program Mgmt Rev Draftv2.pdf
53 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A004 Program Mgmt Plan Draftv2.pdf
55 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A003 Data Mgmt Plan Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A002 Phase-Out Plan Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 3 CDRL A001 Phase-In Plan Draftv2.pdf
54 KBAdded in Special Notice version 6Posted - Download
Attch 2 Apdx H Environmental Reqs- draftv2.pdf
452 KBAdded in Special Notice version 6Posted - Download
Attch 2 Apdx K L M N FRAME- draftv2.xlsx
53 KBAdded in Special Notice version 6Posted - Download
Attch 2 Apdx J Antenna Twr Resp List draftv2.docx
54 KBAdded in Special Notice version 6Posted - Download
Attch 2 Apdx I PE Inventory - draftv2.xlsx
1018 KBAdded in Special Notice version 6Posted - Download
Attch 1 FRAME PWS - Draftv2.docx
269 KBAdded in Special Notice version 6Posted - Download
FRAME Industry Day Attendees POCs 20261026.pdf
58 KBAdded in Special Notice version 5Posted - Download
FRAME Industry Day Brief.pptx
4.7 MBAdded in Special Notice version 4Posted - Download
FRAME RFP_GFP List_07Oct2026.xlsx
10 MBAdded in Special Notice version 4Posted - Download
FRAME Industry Day CRM 20261008.xlsx
63 KBAdded in Special Notice version 4Posted - Download
Attch 3 CDRL A020 Asbestos Lead Abatemt Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A023 Emission Equip Usage Draft.pdf
33 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A021 Cathodic Prot Booklet Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A024 Facility Asses Rpt Draft.pdf
3.7 MBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A022 Backflow Prev Sys Rpt Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A026 Corr Prev Ctl Plan draft.pdf
55 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A015 Work Order Status Rpt Draft.pdf
32 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A027 Test Insp Rpt Draft.pdf
56 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A028 Weekly MR Schedule Draft.pdf
54 KBAdded in Special Notice version 2Posted - Download
Attch 5 CBA IBEW 2024 12949 Appdx A redacted.pdf
306 KBAdded in Special Notice version 2Posted - Download
Attch 5 Appendix B Wage Rate Tables redacted.pdf
125 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A017 Quality Mgmt Plan Draft.pdf
54 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A013 Accident Incdt Rpt Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A011 Sys Safety Pgm Plan Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A008 GFP GFM Inv Rpt Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 4 FRAME Incentive Plan - Draft.docx
94 KBAdded in Special Notice version 2Posted - Download
Attch 7 SCA WD 2015-5647 (Rev 29).pdf
251 KBAdded in Special Notice version 2Posted - Download
Attch 7 SCA WD 2015-5637 (Rev 34).pdf
44 KBAdded in Special Notice version 2Posted - Download
Attch 6 DB WD CA20260014 (Mod 5).pdf
81 KBAdded in Special Notice version 2Posted - Download
Attch 7 SCA WD 1986-0431 (Rev 68).pdf
26 KBAdded in Special Notice version 2Posted - Download
Attch 6 DB WD CA20260018 (Mod 6).pdf
232 KBAdded in Special Notice version 2Posted - Download
Attch 8 Section L - draft.docx
177 KBAdded in Special Notice version 2Posted - Download
Attch 9 Section M - draft.docx
77 KBAdded in Special Notice version 2Posted - Download
Attch 10 CRM Template - draft.xlsx
23 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A016 Daily MR Schedule Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A014 PE Resp List - Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A005 Program Mgmt Review Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A004 Program Mgmt Plan draft.pdf
55 KBAdded in Special Notice version 2Posted - Download
Attch 2 Apdx J Antenna Tower Resp List draft.docx
45 KBAdded in Special Notice version 2Posted - Download
Attch 2 Apdx H Environmental Reqs - draft.docx
137 KBAdded in Special Notice version 2Posted - Download
Attch 2 Apdx I PE Inventory - draft.xlsx
1.0 MBAdded in Special Notice version 2Posted - Download
Attch 3 Consolidated DID Files draft.pdf
1.7 MBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A025 RCM Plan - Draft.pdf
54 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A018 Solid Waste Report - Draft.pdf
55 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A019 HMMP Report - Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A002 Phase-Out Plan Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A003 Data Management Plan Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 3 CDRL A001 Phase-In Plan Draft.pdf
53 KBAdded in Special Notice version 2Posted - Download
Attch 2 Appendix K L M N - draft.xlsx
53 KBAdded in Special Notice version 2Posted - Download
Attch 1 FRAME PWS - draft.docx
267 KBAdded in Special Notice version 2Posted - Download
RFI Atch 4 Bldg 8500 Map.pptx
76 KBAdded in Special Notice version 2Posted - Download
RFI Atch 3 Map to Bldg 8500.png
2.4 MBAdded in Special Notice version 2Posted - Download
RFI Atch 1 Industry Day Agenda_22-23 September 2026.pdf
95 KBAdded in Special Notice version 2Posted
Lifecycle
- 1Version 1Special Notice
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
- 2Version 2Special Notice
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
- 3Version 3Special Notice
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
- 4Version 4Special Notice
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
- 5Version 5Special Notice
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
- 6Version 6Special NoticeCurrent
Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT
Similar Opportunities
Additional Details
Solicitation Number
FA461027R0001
Archive Date
Feb 15, 2027
Office Address
VANDENBERG SFB, CA, 93437-5212