GovChime
Notice ID: ae426af7b72345dab783fe4e4790af01Solicitation

W912HN20R4000 - Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia

Archived on May 2, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−04:00
Posted
April 26, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W074 ENDIST SAVANNAH
Place of performance
SC
PSC
Y1BD: CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912HN20R4000
Notice ID
ae426af7b72345dab783fe4e4790af01

Description

AMENDMENT 0004 CONTRACT CHANGES: The purpose of this amendment is to extend the Proposal due date from 22 April 2022 to 2 May 2022. On the Proposal Data Sheet, DUNS # has been adjusted to UEI #. 12.1. SUBMISSION REQUIREMENTS: 12.1.1. Technical Approach Narrative. Provide a technical approach narrative, both qualitative and quantitative, defining the elements of the proposal Include technical approach on all of the sub-items, and manufacturers data sheets for proposed materials into a single combined narrative for the SEED/SAMPLE task order. It is the responsibility of the Offeror to ensure that all aspects identified are addressed. Whether individual narratives or a single combined narrative is provided, the maximum total length for narratives shall not exceed five (5) type-written single-sided pages. ( For the SAMPLE TASK ORDER, Offerors are only required to provide manufacturers data sheet for the required paint (temporary and permanent), mooring points, asphalt surface treatment, and crack sealant. These Manufacturer data sheets are NOT TO BE INCLUDED in the 5 page limit). TECHNICAL SPECIFICATION CHANGES: There are no technical specification with this amendment. CONTRACT DRAWINGS: There are no drawing changes with this amendment. AMENDMENT 0003 The Purpose of this amendment is to include Factor 3 for Phase II that was erronous left out of amendment 2. All other terms and conditions sremain unchanged. AMENDMENT 0002 The purpose for this Amendment is as follows: 1. Phase II is issued w ith this Amendment. Only Offerors that submitted a successful offer during Phase I of the evaluation process shall respond/acknow ledge this Amendment. Phase II w ill evaulate those successful Offerors based on their understanding of the specified SAMPLE project (FA-50001-SP - Rubber Removal & Restriping MAAF/SAAF; FA-50002-SP - Joint/Seal, Crack, Spall Repair MAAF/SAAF) Scope of Work. 2. The CLIN Schedule now includes HOOH, a Bid Schedule and SAMPLE project have been added. HOOH for the tw o yr Base and the three options are required to be priced. 3. The due date and time have been extended to 22 April 2022 at 12: 00 EST. 4. Refer to Phase II Notes to Offers for submission requirements AMENDMENT 0001 The purpose of this amendment is to extend proposal due date from 28 July 2020 to 31 July 2020 at 2PM EST. All other terms and conditions remain unchanged. Two-Phase Design-Build Multiple Aw ard Task Order Contract (MATOC) for Airfield Maintenance and Construction type task orders. Task orders issued under this MATOC are anticipated to require performance of work predominantly performed in North Carolina, however performance may be required at other military locations within the South Atlantic Division Area of Operations (North Carolina, South Carolina, Georgia, Florida, Alabama & Mississippi). This is a competitive acquisition for the award of up to five Indefinite Delivery Contract Type Multiple Award Task Order (MATOC) being offered as a Total Small-Business Set Aside. For this procurement, only Small Businesses are eligible to submit offers to this solicitation. The life of the basic contract is for a base period of two (2) years and three (3) one year options. The contractors which successfully receive an award will have a total contract capacity of $45M. The Government will use a best value Two-Phase Design-Build selection procedure in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range betw een $250K and $5M. Task orders issued under this MATOC will be firm-fixed price. All other resultant task orders may include options.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912HN20R4000
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationMay 26, 2020

    W912HN20R4000 - Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia

    Notice 30b2c1ae4d5a469c9966c9b9c464eacc on SAM.gov

  2. 8×
    SolicitationCurrentJun 26, 2020

    W912HN20R4000 - Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia

    Notice ae426af7b72345dab783fe4e4790af01 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W912HN20R4000

Archive Date

May 2, 2022

Office Address

SAVANNAH, GA, 31401-3604