GovChime
Notice ID: 32e9970da5980a7ce5dc8e3b21596743Combined Synopsis/Solicitation

Middle Ridge Cabin Foundation

Archived on December 31, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−05:00
Posted
July 23, 2009
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Alaska Regional Office, R10
Place of performance
B. Location: Middle Ridge Cabin site is located approximately 19 miles southeast of Wrangell off NFS Road 50060., Wrangell, 99929
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
AG-0116-S-09-0114
Notice ID
32e9970da5980a7ce5dc8e3b21596743

Description

A. Description: This project involves the following work: 1. Foundation site excavation, compacted backfill, concrete foundation, cabin floor support joists, and exterior deck in full accordance with the drawings and contract provisions. 2. An option that includes hauling 75 cubic yards of Government furnished aggregate to the site, placing and compacting. Finished grade of aggregate shall be 8 inches below top of foundation stem wall. Aggregate shall be out-sloped from foundation and blend into existing shoulder of rock pad. Grade of aggregate shall be a maximum of 5 percent. Government furnished aggregate is located approximately 6.8 miles from the site in the Pat’s Quarry, a short distance from Milepost 11.1, Zimovia Highway. 3. The option also includes hauling, spreading and compacting shot rock. Shot rock is available 0.3 miles away from the site in the existing quarry on Road 50060. 15 cubic yards of pit run shot rock shall be spread and compacted to expand the existing pad at the back of the pad. The area where the shot rock is to be spread will be identified on the ground by the Contracting Officer. An additional 20 cubic yards of shot rock shall be hauled, spread, and compacted on the fill slopes of the existing pad to create a fill slope of 1 vertical/2 horizontal. When work is complete on the slopes, rock on the surface of treated fill slopes shall be less than 6” in size. Existing pad fill slopes between Rd. 50060 and the cabin foundation do not require finishing. The Contracting Officer shall identify on the ground approximately 60 lineal feet of fill slope at the back of the site that shall require finishing. 4. Mobilization of equipment to perform the work.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Sherman L Mayle
Contract Specialist
Fax: 9072286254

Documents

No documents available.

Lifecycle

Solicitation:AG-0116-S-09-0114
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentJul 10, 2009

    Middle Ridge Cabin Foundation

    Notice 32e9970da5980a7ce5dc8e3b21596743 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-0116-S-09-0114

Archive Date

Dec 31, 2009

Office Address

JUNEAU, AK, 99802