Notice ID: de6de0e4cc3273ceb4e04715c51caeabAward NoticeAwarded
Rainbow Point Water System Reconstruction
Awarded on August 13, 2008. Full description on SAM.gov.
Awarded tounder AG-0261-P-08-0089 (source: SAM.gov award notice)• $84.4K
Overview
- Posted
- August 15, 2008
- Notice type
- Award Notice
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Boise National Forest
- Place of performance
- Valley County
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
- Award date
- Aug 13, 2008
- Award amount (SAM.gov award notice)
- $84.4K
Identifiers
- Solicitation number
- AG-0261-S-08-0043
- Notice ID
- de6de0e4cc3273ceb4e04715c51caeab
- Award number (PIID)
- AG-0261-P-08-0089
Description
Project awarded to Challenger Company of Nampa, Idaho
Award Overview
Award Number
AG-0261-P-08-0089
Award Amount (SAM.gov award notice)
$84.4K
Award Date
Aug 13, 2008
Awardee
Original Solicitation
Notice ID: de6de0e4cc3273ceb4e04715c51caeab
Posted Date: Aug 15, 2008
Original Response Deadline: Not specified
Contract Details
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-0261-S-08-0043- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJul 1, 2008
Rainbow Point Water System Reconstruction
- SolicitationJul 17, 2008
Rainbow Point Water System Reconstruction
- AwardedCurrentAug 15, 2008
Rainbow Point Water System Reconstruction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items | - | Combined Synopsis | 11/28/2026 |
| - | Awarded | Open | |
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services. | - | Combined Synopsis | 12/01/2026 |
PROJECT:: SOUTH FORK BUNKHOUSE WELL ABANDONMENT PROJECT - RIO GRANDE NF, COLORADO POC: JANICE KING, CONTRACT SPECIALIST, at janice.king@usda.gov and Lucas Dahlman, Contracting Officer, at lucas.dahlman@usda.gov THERE IS A SITE VISIT SCHEDULED FOR NOVEMBER 17, 2026. READ this Solicitation in its entirety for details and contact information for the Site Visit. READ each of the attachments in the Attachments/Links Section. Questions Due: November 19, 2026, at 9:00 a.m. MT - Quotes Due: December 9, 2026, at 9:00 a.m. MT; Questions and quotes shall be submitted by the due dates and times to the Contract Specialist & Contracting Officer listed above via email. | - | Combined Synopsis | 12/09/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
AG-0261-S-08-0043
Archive Date
Sep 1, 2008
Office Address
BOISE, ID, 83709