GovChime
Notice ID: 4cd3500764227c93c54265096aa4d32aAward NoticeAwarded

REDFISH LAKE LIFT STATION

Awarded on September 2, 2010. Full description on SAM.gov.

Awarded tounder AG-0261-C-10-0033 (source: SAM.gov award notice)• $508.9K

Overview

Posted
September 8, 2010
Notice type
Award Notice
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Boise National Forest
Place of performance
The project is located on the Sawtooth National Recreation Area on the Sawtooth National Forest. The project is located near Redfish Lake and is approximately 10 miles south of Stanley, Idaho via State Highway 75 and Forest Roads #213 and #214. The project is located in Custer County, T9N, R13E, Section 03. , Stanley
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Sep 2, 2010
Award amount (SAM.gov award notice)
$508.9K

Identifiers

Solicitation number
AG-0261-S-10-0075
Notice ID
4cd3500764227c93c54265096aa4d32a
Award number (PIID)
AG-0261-C-10-0033

Description

REDFISH LAKE LIFT STATION IN APPROXIMATELY 15 DAY's, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT. This Request for Proposal consists of the reconstruction of the existing sewer system and restrooms at Redfish Lake on the Sawtooth National Recreation Area on the Sawtooth National Forest. Work includes: Removing the existing restrooms/utility building. Modifying the existing lift station and sewer system, including removing and replacing pumps, piping, pipe fittings, and the valve vault. The wet well shall remain in place and be reconditioned to accommodate the new piping. Constructing a new restroom/utility building that houses the lift station wet well, backup generator and two separate restrooms. The following utilities shall be included: water, electrical, and propane. Realigning and installing a pressurized force main that exits the lift station and connects to the existing force main via a new pressurized manhole Completing existing sewer line improvements. This work includes replacing failing sewer line segments, patching asphalt roadway segments, and modifying existing manholes. . CONTACT SHAWN ROBNETT, (208) 737-3206 FOR MORE INFORMATION. CONTRACT TIME WILL BE 420 days with an estimated start date of 09/13/2010 (includes time between Memorial Day 2011 and Labor Day 2011 where work will be suspended due to Visitor/Summer season) ESTIMATED PRICE RANGE: $250,000 to $500,000 NAICS Code: 237110 Size Standard: $33.5 This procurement will be advertized as a TOTAL HUB-ZONE SET-SIDE.

Full description on SAM.gov

Award Overview

Award Number

AG-0261-C-10-0033

Award Amount (SAM.gov award notice)

$508.9K

Award Date

Sep 2, 2010

Awardee

Original Solicitation

Notice ID: 4cd3500764227c93c54265096aa4d32a

Posted Date: Sep 8, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:AG-0261-S-10-0075
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationJul 2, 2010

    REDFISH LAKE LIFT STATION

    Notice 12efb6cbacd908730a8d93ab93f175fe on SAM.gov

  2. SolicitationAug 6, 2010

    REDFISH LAKE LIFT STATION

    Notice 95894bc0a1da6337bd90864a779a7a0c on SAM.gov

  3. AwardedCurrentSep 8, 2010

    REDFISH LAKE LIFT STATION

    Notice 4cd3500764227c93c54265096aa4d32a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-0261-S-10-0075

Archive Date

Sep 30, 2010