Awarded
Porcupine Springs Water System Improvements Project 2017
Awarded tounder AG-0261-C-17-0011 (source: SAM.gov award notice)• $191.8K
Overview
- Posted
- October 5, 2017
- Notice type
- Award Notice
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Boise National Forest
- Place of performance
- CASSIA COUNTY, ID, ID
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Sep 29, 2017
- Award amount (SAM.gov award notice)
- $191.8K
Identifiers
- Solicitation number
- AG-0261-S-17-0001
- Notice ID
- f5c36e190a547de45aea92d76af9686a
- Award number (PIID)
- AG-0261-C-17-0011
Description
AG-0261-S-17-0001 Porcupine Springs Water System Improvements Project 2017 IN APPROXIMATELY 15 DAY'S, THE SOLICITATION FOR THIS CONSTRUCTION PROJECT WILL BE AVAILABLE TO VIEW AND PRINT The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Project Location: The Porcupine Springs Water System Improvements Project 2017 is located on the Twin Falls Ranger District of the Sawtooth National Forest, Cassia County, Idaho. approximately 26 miles south and 9 miles east of Twin Falls, approximately 35 miles by road from Twin Falls (over the divide above the Magic Mountain ski resort) at an elevation of approximately 7020 feet. It is located in the SW1/4 of Section 30, T14S, R19E (Latitude 42 10'19"N, Longitude 114 16'39"W). 1. This project proposes to modify an existing well and installing a new solar-powered submersible pump. 2. Installing a new utility building with plumbing appurtenances and solar-powered electrical system. 3. Installing new buried waterline. 4. Installing a new water hydrant. 5. Installing a remote telemetry system for communication between the pump controls and the tank level floats. 6. Disconnecting the existing spring source from the water system (at the existing tank). 7. All Work to decommission the existing spring source and pump system will be completed by others (not in contract). Contact DuWayne Kimball dkimball@fs.fed.us For More Information. The anticipated Project Start Date is July 2017. Contract Days: 90 Calendar Days. Estimated Price Range: $25,000 to $150,000 NAICS Code: 221310 Size Standard: $27.5 This proposed procurement is a TOTAL SMALL BUSINESS set aside.
Award Overview
Award Number
AG-0261-C-17-0011
Award Amount (SAM.gov award notice)
$191.8K
Award Date
Sep 29, 2017
Awardee
Original Solicitation
Notice ID: f5c36e190a547de45aea92d76af9686a
Posted Date: Oct 5, 2017
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
AG-0261-S-17-0001- Market Research
- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Market ResearchOct 4, 2016
PORCUPINE SPRINGS WATER SYSTEM IMPROVEMENT PROJECT 2017
- 7×Pre-SolicitationApr 3, 2017
Porcupine Springs Water System Improvements Project 2017
- SolicitationSep 14, 2017
Porcupine Springs Water System Improvements Project 2017
- AwardedCurrentOct 5, 2017
Porcupine Springs Water System Improvements Project 2017
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-0261-S-17-0001
Archive Date
Oct 10, 2017
Office Address
BOISE, ID, 83709