GovChime
Notice ID: ee90c0633cd238774019040325c4bac2Solicitation

Pole Creek Guard Station Water Tank Repainting

Archived on May 31, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:30 AM UTC+02:00
Posted
April 17, 2017
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238320: Painting and Wall Covering Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Boise National Forest
Place of performance
Jarbidge
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
AG-0261-S-17-0065
Notice ID
ee90c0633cd238774019040325c4bac2

Description

POLE CREEK GUARD STATION WATER TANK REPAINTING This project includes the repainting of a 7000-gallon bolted steel water tank, 12 foot diameter x 8 foot high. Both interior and exterior surfaces will be repainted. The work includes sandblasting or other approved surface preparation, repairing deteriorated surfaces as needed to maintain structural integrity, repairing the interior ladder, installing a new seal around the inlet pipe, and coating the tank surfaces with a 2-part alkyd epoxy coating. All interior coatings must be NSF approved for drinking water systems. PROJECT LOCATION The project is located at the Pole Creek Guard Station on the Jarbidge Ranger District in Elko County, Nevada. Pole Creek GS is located approximately 16 miles south of Three Creek, Idaho, via FS Road 58074 (Pole Creek Road). SITE INFORMATION AND LIMITATIONS The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: 1. Utilities are not available at the site for construction purposes. Contractor shall be responsible for coordinating/providing required power and water for construction operation. 2. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work. Toilet facilities shall be provided at a rate of one stool for every 10 workers assigned or working on site with a minimum of one required. 3. Access to the tank site from the Pole Creek GS is via 3 miles of improved native surface road, and approximately mile of unimproved route. The unimproved route may generally follow an abandoned two-track road or an alternate route approved by the Contracting Officer. Estimated Start Date: July 20, 2017, contract time 45 Calendars Days. NAICS: 238320, $15.0M

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Tanya Spanfellner
Contracting Officer
Fax: 208-373-4197

Documents

No documents available.

Lifecycle

Solicitation:AG-0261-S-17-0065
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationApr 13, 2017

    Pole Creek Guard Station Water Tank Repainting

    Notice 9b42afcc4cf0f3d9fc5431ce53669063 on SAM.gov

  2. SolicitationCurrentApr 17, 2017

    Pole Creek Guard Station Water Tank Repainting

    Notice ee90c0633cd238774019040325c4bac2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-0261-S-17-0065

Archive Date

May 31, 2017