GovChime
Notice ID: 44d5cac15c061e65f6d0b3e83020b035Award NoticeAwarded

Clearwater NF - Elk Creek Dispersed Site Rehabilitation Project

Awarded on September 4, 2012. Full description on SAM.gov.

Awarded tounder AG-02RC-C-12-0071 (source: SAM.gov award notice)• $51.6K

Overview

Posted
September 5, 2012
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE
Place of performance
Clearwater National Forest 12730 Highway 12, Orofino, 83530
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Sep 4, 2012
Award amount (SAM.gov award notice)
$51.6K

Identifiers

Solicitation number
AG-02RC-S-12-0119
Notice ID
44d5cac15c061e65f6d0b3e83020b035
Award number (PIID)
AG-02RC-C-12-0071

Description

This project will treat adverse impacts of dispersed recreation on steam and reparian areas in municipal watershed through decommissioning or reduction of footprint. This project will resore water quality, re-establish native plants and restore fish habitat. All work will take place along Elk Creek, just north of the town of Elk River, ID adjacent to National Forest System Road 382. The work sites are scattered nine miles upstream of Elk River. Approximately 25-30 work sites. Through use of various physical barriers and control measures, dispersed campsites will be modified through on or more of the following methods: Embedding and placing boulders - Boulders (obtained by contractor) will be transported to site, staged and embedded at predetermined locations. Boulders will be no smaller than 4' x 4', embedded to 50% of their size, backfilled and stabilized. Boulders will be placed 30" apart from each other or pre-determined on-site control poionts (existing trees/rocks). ONe opening per site will be allowed to remain at 36". Constructing and installing jack leg (or other agreed upon) fencing - Fencing (obtained by contrator) will be transported to site, staged and installed at pre-determined locations and according to technical specifications. Decompaction of campsite - Pre-determined areas will be identifed for decompaction of soil. Technical specifications will be provided for depth of decompaction required. Scarification of campsite - Where decompaction is not feasible, scarification of certain locations will be prescribed. Technical specifications will be provided for depth of scarifictation request. Planting of vegetation - Vegetation (obtained by contractor) will be planed at sites with species, spacing, etc. to be provided in technical specifications. Seeding - Seed will be planted at sites with species, spacing, etc. to be provided in technical specificaitons. Work will commence in the fall of 2012, with the project continuing during the 2013 summer sesaon (May through October)

Full description on SAM.gov

Award Overview

Award Number

AG-02RC-C-12-0071

Award Amount (SAM.gov award notice)

$51.6K

Award Date

Sep 4, 2012

Awardee

Original Solicitation

Notice ID: 44d5cac15c061e65f6d0b3e83020b035

Posted Date: Sep 5, 2012

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Matthew Markovich
Contract Specialist
Fax: 208-476-8288

Documents

No documents available.

Lifecycle

Solicitation:AG-02RC-S-12-0119
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationJun 29, 2012

    Clearwater NF - Elk Creek Dispersed Site Rehabilitation Project

    Notice 7831843bc74aecc48b77ac49073ed8ed on SAM.gov

  2. SolicitationAug 15, 2012

    Clearwater NF - Elk Creek Dispersed Site Rehabilitation Project

    Notice 6659e319b1b919fca0e253dacfd0be20 on SAM.gov

  3. AwardedCurrentSep 5, 2012

    Clearwater NF - Elk Creek Dispersed Site Rehabilitation Project

    Notice 44d5cac15c061e65f6d0b3e83020b035 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-02RC-S-12-0119

Archive Date

Sep 19, 2012