Notice ID: 61ed2753f14bd986dc553c749d1c0330Award NoticeAwarded
BEAVERHEAD-DEERLODGE NATIONAL FOREST - Nez Perce CDNSTrail Reconstruction
Awarded on June 1, 2015. Full description on SAM.gov.
Awarded tounder AG-0356-C-15-0010 (source: SAM.gov award notice)• $50.7K
Overview
- Posted
- June 2, 2015
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- CUSTER GALLATIN NATIONAL FOREST
- Place of performance
- Butte Ranger District 1820 Meadowlark Lane, Butte, 59701
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
- Award date
- Jun 1, 2015
- Award amount (SAM.gov award notice)
- $50.7K
Identifiers
- Solicitation number
- AG-0356-S-15-0021
- Notice ID
- 61ed2753f14bd986dc553c749d1c0330
- Award number (PIID)
- AG-0356-C-15-0010
Description
Z- Nez Perce CDNSTrail Reconstruction on the Butte Ranger District Project Location and Directions. To get to this project take I-15 North of Butte to the Elk Park Exit No. 138. Turn right or south at the Exit onto the Frontage Road. Take an immediate left onto the Nez Perce Road and travel along this road 3 miles to the Nez Perce Trailhead. The work begins at the Nez Perce Trailhead. The trailhead is accessible by passenger car. Description of Work. This project will construct much needed drainage features along an existing trail located off of the Elk Park Exit just north of Butte. The trail is currently a single-track motorized trail that was constructed in the early 2000's. The trail has not received significant maintenance in several years, and the switchbacks are all rutted and will need to be reconstructed. Equipment Requirments. All tools and equipment shall be furnished by the contractor. Excavators shall be limited to a maximum 39-inch track width. 2-wheeled motor vehicles are allowed for construction purposes only, such as transportation of employees and materials. 4-wheeled motor vehicles are not allowed. When not on site, keep valuable tools hidden from the trail. A blasting plan (including copy of Montana Blaster license holder) is required at time of quote submission. No formal site visit will be held. Contractors should inspect the site on their own. Construction Magnitude is $25,000 to $100,000 Performance Period is from July 1, 2015 thru September 30, 2016. No work can be done on site from 10-1-2015 thru 06-01-2016.
Award Overview
Award Number
AG-0356-C-15-0010
Award Amount (SAM.gov award notice)
$50.7K
Award Date
Jun 1, 2015
Awardee
Awardee UEI
KHYHFLNESJN3
Original Solicitation
Notice ID: 61ed2753f14bd986dc553c749d1c0330
Posted Date: Jun 2, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-0356-S-15-0021- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationApr 17, 2015
BEAVERHEAD-DEERLODGE NATIONAL FOREST - Nez Perce CDNSTrail Reconstruction
- SolicitationMay 14, 2015
BEAVERHEAD-DEERLODGE NATIONAL FOREST - Nez Perce CDNSTrail Reconstruction
- AwardedCurrentJun 2, 2015
BEAVERHEAD-DEERLODGE NATIONAL FOREST - Nez Perce CDNSTrail Reconstruction
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-0356-S-15-0021
Archive Date
Sep 30, 2015