GovChime
Notice ID: 8a99db93359f3b6a7f7ac4fa57c4c767Award NoticeAwarded

HELENA NATIONAL FOREST - Meriwether Coulter Boat Dock Reconstruction (revised)

Awarded on August 28, 2015. Full description on SAM.gov.

Awarded tounder AG-03H6-C-15-0004 (source: SAM.gov award notice)• $421.1K

Overview

Posted
September 9, 2015
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
CUSTER GALLATIN NATIONAL FOREST
Place of performance
3131 Gates of the Mountains Road, Helena, 59602
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Aug 28, 2015
Award amount (SAM.gov award notice)
$421.1K

Identifiers

Solicitation number
AG-03H6-S-15-0006
Notice ID
8a99db93359f3b6a7f7ac4fa57c4c767
Award number (PIID)
AG-03H6-C-15-0004

Description

NOTE: THIS IS A PRESOLICITATION NOTICE FOR A PROJECT INTENDED TO BE RESOLICITED. SOLICITATION #AG-03H6-S-15-0002 WAS CANCELLED PER "FAR 15.206(e) - AMENDING THE SOLICITATION". ADDITIONAL AMENDMENTS TO THE ORIGINAL SOLICITATION WOULD HAVE REQUIRED MAJOR CHANGES IN HOW THE PROJECT WAS ORIGINALLY ADVERTISED. THE ERRORS WERE ON THE PART OF THE GOVERNMENT AND THE REQUIRED CORRECTION WAS TO CANCEL THAT SOLICITATION, CORRECT THE DEFICIENCIES IN THE BIDDING MATERIALS AND READVERTISE THE REQUIREMENT. -PROJECT DESCRIPTION AND LOCATION- Scope of Contract: The project consists of the supply and installation of new all-in-one floatable boat dock systems at the Meriwether and Coulter recreation sites on Holter Lake. BASE BID: The Meriwether Picnic Area boat docks will provide access for a tour boat and eight new recreational boat slips. A gabion barge mooring/landing structure will also be constructed at the site. Meriwether improvements consist of, but are not limited to: structure excavation, timber retaining wall repairs, installation of gabions & revet mattresses, installation of reinforced concrete bulkheads, signing, placement of wave armoring, crushed aggregate surfacing, floatable dock system, and aluminum gangways/ramps. ADDITIVE 1: The Coulter Campground recreational site boat docks will provide access for six to eight new recreational boat slips. Coulter improvements consist of, but are not limited to: structure excavation, installation of reinforced concrete bulkheads, crushed aggregate surfacing, supply and installation of floatable dock system, and an aluminum gangway. Plans show additional dock section providing access for two boat slips which will not be part of nor in the scope of work in this additive item. ADDITIVE 2: The existing timber and foam fabricated dock system to be replaced is in ill repair and will be in excess to Forest Service needs after installation of new dock systems. Demolition and disposal consists of, but is not limited to: demolition, removal and disposal of existing Meriwether and Coulter boat docks. Docks will be stored at the Gates of the Mountains Marina at the conclusion of the 2015 summer season. Project Location: The projects are located 20 miles north of Helena, Montana and four miles downstream from the Gates of the Mountains Marina on Holter Lake. Refer to the location map on the title sheet of the plans. Pre-Bid Tour: No formal pre-bid tour is scheduled. Additional Information: It is anticipated the full solicitation and all bidding materials will be posted to FBO on/around July 8, 2015. Project will be advertised as Full & Open competition, Invitation for Bid (IFB). No Set-Asides. Per FAR 36.204(e) Disclosure of the Magnitude of Construction Projects, this project is estimated between $500,000 and $1,000,000, all items. A bid bond in the amount of 20% of the bid or $200,000, whichever is less will be required. Work is to commence Fall of 2015 with completion by June of 2016. Details outlining the differences between the original solicitation and the new one will be posted with all the bidding materials.

Full description on SAM.gov

Award Overview

Award Number

AG-03H6-C-15-0004

Award Amount (SAM.gov award notice)

$421.1K

Award Date

Aug 28, 2015

Awardee

Awardee UEI

ULXQDFDAY6Q8

Original Solicitation

Notice ID: 8a99db93359f3b6a7f7ac4fa57c4c767

Posted Date: Sep 9, 2015

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Gary B. Stephens
Contracting Officer
Fax: (406) 587-6848

Secondary Contact

Dana M. Bangart
Purchasing Agent
Fax: 4065876848

Documents

No documents available.

Lifecycle

Solicitation:AG-03H6-S-15-0006
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 2×
    Pre-SolicitationJun 25, 2015

    HELENA NATIONAL FOREST - Meriwether Coulter Boat Dock Reconstruction (revised)

    Notice 1300f9cb27495bf4e7e0eb35ce45dd69 on SAM.gov

  2. SolicitationJul 18, 2015

    HELENA NATIONAL FOREST - Meriwether Coulter Boat Dock Reconstruction (revised)

    Notice 8bc4aca8363c638b45853b9acf6ec1fe on SAM.gov

  3. AwardedCurrentSep 9, 2015

    HELENA NATIONAL FOREST - Meriwether Coulter Boat Dock Reconstruction (revised)

    Notice 8a99db93359f3b6a7f7ac4fa57c4c767 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-03H6-S-15-0006

Archive Date

Dec 31, 2015