GovChime
Notice ID: dbf7e54d95d4af3c80b69c4e6ad2578bAward NoticeAwarded

Little Tucannon Creek Bridge Replacement Project

Awarded on June 18, 2010. Full description on SAM.gov.

Awarded tounder AG-04M3-C-10-0003 (source: SAM.gov award notice)• $153.6K

Overview

Posted
June 23, 2010
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
UMATILLA NATIONAL FOREST R6
Place of performance
Umatilla National Forest, Dayton
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Jun 18, 2010
Award amount (SAM.gov award notice)
$153.6K

Identifiers

Solicitation number
AG-04M3-S-10-0005
Notice ID
dbf7e54d95d4af3c80b69c4e6ad2578b
Award number (PIID)
AG-04M3-C-10-0003

Description

The Little Tucannon River passes under Forest road 4700 through a 96" x 66" Arch Culvert. This structure currently is undersized and a barrier to T&E and native fish. The U.S. Forest Service, Umatilla National Forest has a requirement for the removal of the existing culvert and the installation of a precast/prefabricated structure. Also included in this is stream simulation work in the channel, including placing rock for steps and streambed. De-watering is required for this project which includes re-directing the river for the duration of the project and installing erosion and pollution controls devices during installation of the new structure and stream simulation work. Little Tucannon crossing is located approximately 30 miles upstream on the Tucannon River from US Highway 12 at Dayton WA. The crossing replacement project is on Forest Road 4700 immediately following the Forest Road 4620 intersection with the Forest Road 4700. The work includes but is not limited to mobilization, construction staking, soil erosion and pollution control, clearing and grubbing, excavation, dewatering and stream diversion work, removal and disposal of the old culvert, topsoil conservation, placing precast footings, load haul and assembly of new structure and riprap placement, backfill and finish grade and stream simulation rock placement through the new structure. The period of performance will be 60 calendar days after receipt of Notice to Proceed. There is a limited window of time for in-stream work between July 15th to August 20th. A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical (questionnaire) and price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The magnitude of the government estimate is between $100,000 and $250,000. Contracting Office Address is Wallowa-Whitman NF, P.O. Box 907, Baker City, OR 97814. Place of Performance is Umatilla National Forest, Pendleton, OR. Points of contact are Jane Stuessy, CO, (541)523-1240 and Joe Neer, COR, (541)278-3749. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about April 23rd, 2010. A bid bond will be required with proposal submission and performance and payment bonds will be required after award. Note: prospective awardee shall be registered in the Central Contractor Registration (CCR) data base prior to award. Information on registration may be obtained via the internet at: http://www.ccr.gov or by calling 1-888-227-2423. All contractors and vendors must complete the electronic version of the Representations and Certifications (Section K in Solicitations) in the ORCA system. The ORCA site is http://www.bpn.gov - click on the Online Reps and Certs Application.

Full description on SAM.gov

Award Overview

Award Number

AG-04M3-C-10-0003

Award Amount (SAM.gov award notice)

$153.6K

Award Date

Jun 18, 2010

Awardee

Original Solicitation

Notice ID: dbf7e54d95d4af3c80b69c4e6ad2578b

Posted Date: Jun 23, 2010

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

2
  • 1204T020A0014
    EASTERN OREGON ENVIRONMENTAL RECOVERY LLC
    Department of AgricultureNAICS 237310
    —Signed Mar 2, 2026
  • 1204T020A0014
    EASTERN OREGON ENVIRONMENTAL RECOVERY LLC
    Department of AgricultureNAICS 237310
    —Signed Apr 11, 2025

Contacts

Contracting Officer

Primary Contact

Jane Stuessy
Contract Specialist
Fax: 541-523-1215

Documents

No documents available.

Lifecycle

Solicitation:AG-04M3-S-10-0005
  1. Awarded

This opportunity has been awarded.

  1. 7×
    Special NoticeFeb 1, 2010

    Little Tucannon Creek Bridge Replacement Project

    Notice a072d193f93f8f4bae56af4a6a864b76 on SAM.gov

  2. AwardedCurrentJun 23, 2010

    Little Tucannon Creek Bridge Replacement Project

    Notice dbf7e54d95d4af3c80b69c4e6ad2578b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-04M3-S-10-0005

Archive Date

Jul 7, 2010