Notice ID: dbf7e54d95d4af3c80b69c4e6ad2578bAward NoticeAwarded
Little Tucannon Creek Bridge Replacement Project
Awarded on June 18, 2010. Full description on SAM.gov.
Awarded tounder AG-04M3-C-10-0003 (source: SAM.gov award notice)• $153.6K
Overview
- Posted
- June 23, 2010
- Notice type
- Award Notice
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- UMATILLA NATIONAL FOREST R6
- Place of performance
- Umatilla National Forest, Dayton
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Jun 18, 2010
- Award amount (SAM.gov award notice)
- $153.6K
Identifiers
- Solicitation number
- AG-04M3-S-10-0005
- Notice ID
- dbf7e54d95d4af3c80b69c4e6ad2578b
- Award number (PIID)
- AG-04M3-C-10-0003
Description
The Little Tucannon River passes under Forest road 4700 through a 96" x 66" Arch Culvert. This structure currently is undersized and a barrier to T&E and native fish. The U.S. Forest Service, Umatilla National Forest has a requirement for the removal of the existing culvert and the installation of a precast/prefabricated structure. Also included in this is stream simulation work in the channel, including placing rock for steps and streambed. De-watering is required for this project which includes re-directing the river for the duration of the project and installing erosion and pollution controls devices during installation of the new structure and stream simulation work. Little Tucannon crossing is located approximately 30 miles upstream on the Tucannon River from US Highway 12 at Dayton WA. The crossing replacement project is on Forest Road 4700 immediately following the Forest Road 4620 intersection with the Forest Road 4700. The work includes but is not limited to mobilization, construction staking, soil erosion and pollution control, clearing and grubbing, excavation, dewatering and stream diversion work, removal and disposal of the old culvert, topsoil conservation, placing precast footings, load haul and assembly of new structure and riprap placement, backfill and finish grade and stream simulation rock placement through the new structure. The period of performance will be 60 calendar days after receipt of Notice to Proceed. There is a limited window of time for in-stream work between July 15th to August 20th. A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical (questionnaire) and price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The magnitude of the government estimate is between $100,000 and $250,000. Contracting Office Address is Wallowa-Whitman NF, P.O. Box 907, Baker City, OR 97814. Place of Performance is Umatilla National Forest, Pendleton, OR. Points of contact are Jane Stuessy, CO, (541)523-1240 and Joe Neer, COR, (541)278-3749. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about April 23rd, 2010. A bid bond will be required with proposal submission and performance and payment bonds will be required after award. Note: prospective awardee shall be registered in the Central Contractor Registration (CCR) data base prior to award. Information on registration may be obtained via the internet at: http://www.ccr.gov or by calling 1-888-227-2423. All contractors and vendors must complete the electronic version of the Representations and Certifications (Section K in Solicitations) in the ORCA system. The ORCA site is http://www.bpn.gov - click on the Online Reps and Certs Application.
Award Overview
Award Number
AG-04M3-C-10-0003
Award Amount (SAM.gov award notice)
$153.6K
Award Date
Jun 18, 2010
Awardee
Original Solicitation
Notice ID: dbf7e54d95d4af3c80b69c4e6ad2578b
Posted Date: Jun 23, 2010
Original Response Deadline: Not specified
Contract Details
More From This Vendor
Top 5 most recent
- —Signed Mar 2, 2026
- —Signed Apr 11, 2025
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-04M3-S-10-0005- Awarded
This opportunity has been awarded.
- 7×Special NoticeFeb 1, 2010
Little Tucannon Creek Bridge Replacement Project
- AwardedCurrentJun 23, 2010
Little Tucannon Creek Bridge Replacement Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-04M3-S-10-0005
Archive Date
Jul 7, 2010