GovChime
Notice ID: 6b6065fef5b0ce8a0c04468d2aef8504Award NoticeAwarded

Touchet Corral Culvert Replacement Project

Awarded on June 18, 2010. Full description on SAM.gov.

Awarded tounder AG-04M3-C-10-0004 (source: SAM.gov award notice)• $145.5K

Overview

Posted
June 23, 2010
Notice type
Award Notice
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
UMATILLA NATIONAL FOREST R6
Place of performance
Umatilla National Forest, Dayton
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Jun 18, 2010
Award amount (SAM.gov award notice)
$145.5K

Identifiers

Solicitation number
AG-04M3-S-10-0006
Notice ID
6b6065fef5b0ce8a0c04468d2aef8504
Award number (PIID)
AG-04M3-C-10-0004

Description

Touchet Corral is located approximately 20 miles south of Dayton, WA. Head south on Touchet RD for 20 miles, turn onto Forest Road 6400700. The stream crossing is immediately after the intersection of Rd 64 and Rd 6400700. The Touchet River passes under Forest road 6400700 through a 6ft diameter corrugated metal pipe (CMP) which serves as a barrier to T&E and native fish. The U.S. Forest Service, Umatilla National Forest has a requirement for the removal of the existing culvert and the installation of a precast/prefabricated structure. Also included is stream simulation work in the channel. This work includes placing rock for steps and streambed. De-watering is required for this project which includes re-directing the river for the duration of the project and installing erosion and pollution controls devices during installation of the new structure and stream simulation work within schedule and in compliance with drawings and specifications. The period of performance will be 60 calendar days after receipt of Notice to Proceed. There is a limited window of time for in-stream work between July 15th to August 20th. A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical (questionnaire) and price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The magnitude of the government estimate is between $100,000 and $250,000. Contracting Office Address is Wallowa-Whitman NF, P.O. Box 907, Baker City, OR 97814. Place of Performance is Umatilla National Forest, Pendleton, OR. Points of contact are Jane Stuessy, CO, (541)523-1240 and Paul Gerber, COR, (541)278-3781. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about April 23rd, 2010. A bid bond will be required with proposal submission and performance and payment bonds will be required after award. Note: prospective awardee shall be registered in the Central Contractor Registration (CCR) data base prior to award. Information on registration may be obtained via the internet at: http://www.ccr.gov or by calling 1-888-227-2423. All contractors and vendors must complete the electronic version of the Representations and Certifications (Section K in Solicitations) in the ORCA system. The ORCA site is http://www.bpn.gov - click on the Online Reps and Certs Application.

Full description on SAM.gov

Award Overview

Award Number

AG-04M3-C-10-0004

Award Amount (SAM.gov award notice)

$145.5K

Award Date

Jun 18, 2010

Awardee

Original Solicitation

Notice ID: 6b6065fef5b0ce8a0c04468d2aef8504

Posted Date: Jun 23, 2010

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

2
  • 1204T020A0014
    EASTERN OREGON ENVIRONMENTAL RECOVERY LLC
    Department of AgricultureNAICS 237310
    —Signed Mar 2, 2026
  • 1204T020A0014
    EASTERN OREGON ENVIRONMENTAL RECOVERY LLC
    Department of AgricultureNAICS 237310
    —Signed Apr 11, 2025

Contacts

Contracting Officer

Primary Contact

Jane Stuessy
Contract Specialist
Fax: 541-523-1215

Documents

No documents available.

Lifecycle

Solicitation:AG-04M3-S-10-0006
  1. Awarded

This opportunity has been awarded.

  1. 3×
    Special NoticeFeb 2, 2010

    Touchet Corral Culvert Replacement Project

    Notice 6a79082446e4f17ce9f3fa95f9cdae2c on SAM.gov

  2. AwardedCurrentJun 23, 2010

    Touchet Corral Culvert Replacement Project

    Notice 6b6065fef5b0ce8a0c04468d2aef8504 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-04M3-S-10-0006

Archive Date

Jul 7, 2010