GovChime
Notice ID: 06b805bfec786eb8703b77586c9ad26fAward NoticeAwarded

Baker Compound Work Center Building

Awarded on June 19, 2015. Full description on SAM.gov.

Awarded tounder AG-04M3-C-15-0011 (source: SAM.gov award notice)• $889.0K

Overview

Posted
June 22, 2015
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
WALLOWA WHITMAN NATIONAL FOREST
Place of performance
3285 11th Street, Baker City, 97814
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Jun 19, 2015
Award amount (SAM.gov award notice)
$889.0K

Identifiers

Solicitation number
AG-04M3-S-15-0015
Notice ID
06b805bfec786eb8703b77586c9ad26f
Award number (PIID)
AG-04M3-C-15-0011

Description

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT FEBRUARY 17, 2015. PROJECT DESCRIPTION: The Baker Compound Work Center Building is a construction project that will have government operations occurring on site simultaneously during construction. The intent is to construct a new 3,088 square-foot work center building on the Baker Compound in Baker City, Oregon. Work includes but is not limited to the following construction methods and descriptions. The building will be a single story wood framed building, spread footing foundation with a crawl space and "I" - Joist & Beam framing for the floor. External building materials will include a composition shingle roof and cement-fiber siding. The basis of heat source will be two liquid natural gas-fired furnaces. In addition, the site work will consist of excavation/embankment work, new utilities, storm water improvements, parking area construction, and landscaping. In addition, the building will become the new demark point for the site telephone and IT networks. PROJECT LOCATION: The Baker Compound Work Center project will be located at: 3285 11th Street, Baker City, OR 97814. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 2015. Engineering point of contact is Jeffrey Stein, telephone: (541) 962-8544. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $500,000 to $1,000,000. NAICS 236220 with size standard $36.5 mil. This project is set aside 100% for small business.

Full description on SAM.gov

Award Overview

Award Number

AG-04M3-C-15-0011

Award Amount (SAM.gov award notice)

$889.0K

Award Date

Jun 19, 2015

Awardee

Awardee UEI

DZJXJ5D3A496

Original Solicitation

Notice ID: 06b805bfec786eb8703b77586c9ad26f

Posted Date: Jun 22, 2015

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Bryce Kamerdula
Contract Specialist
Fax: 541-523-6393

Secondary Contact

Lorrie D. Hill
Procurement Technician
Fax: 541-523-6393

Documents

No documents available.

Lifecycle

Solicitation:AG-04M3-S-15-0015
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 6×
    Pre-SolicitationFeb 3, 2015

    Baker Compound Work Center Building

    Notice 04bd2f1f2f97bdc58eb07155453568a9 on SAM.gov

  2. SolicitationMar 27, 2015

    Baker Compound Work Center Building

    Notice c1661e365efedc43da4debaaa6d9dbe3 on SAM.gov

  3. AwardedCurrentJun 22, 2015

    Baker Compound Work Center Building

    Notice 06b805bfec786eb8703b77586c9ad26f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-04M3-S-15-0015

Archive Date

Jul 8, 2015