Notice ID: 06b805bfec786eb8703b77586c9ad26fAward NoticeAwarded
Baker Compound Work Center Building
Awarded on June 19, 2015. Full description on SAM.gov.
Awarded tounder AG-04M3-C-15-0011 (source: SAM.gov award notice)• $889.0K
Overview
- Posted
- June 22, 2015
- Notice type
- Award Notice
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- WALLOWA WHITMAN NATIONAL FOREST
- Place of performance
- 3285 11th Street, Baker City, 97814
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Jun 19, 2015
- Award amount (SAM.gov award notice)
- $889.0K
Identifiers
- Solicitation number
- AG-04M3-S-15-0015
- Notice ID
- 06b805bfec786eb8703b77586c9ad26f
- Award number (PIID)
- AG-04M3-C-15-0011
Description
THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT FEBRUARY 17, 2015. PROJECT DESCRIPTION: The Baker Compound Work Center Building is a construction project that will have government operations occurring on site simultaneously during construction. The intent is to construct a new 3,088 square-foot work center building on the Baker Compound in Baker City, Oregon. Work includes but is not limited to the following construction methods and descriptions. The building will be a single story wood framed building, spread footing foundation with a crawl space and "I" - Joist & Beam framing for the floor. External building materials will include a composition shingle roof and cement-fiber siding. The basis of heat source will be two liquid natural gas-fired furnaces. In addition, the site work will consist of excavation/embankment work, new utilities, storm water improvements, parking area construction, and landscaping. In addition, the building will become the new demark point for the site telephone and IT networks. PROJECT LOCATION: The Baker Compound Work Center project will be located at: 3285 11th Street, Baker City, OR 97814. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around May 2015. Engineering point of contact is Jeffrey Stein, telephone: (541) 962-8544. Both performance and payment bonds will be required for this project as well as a bid guarantee. Estimated project value is between $500,000 to $1,000,000. NAICS 236220 with size standard $36.5 mil. This project is set aside 100% for small business.
Award Overview
Award Number
AG-04M3-C-15-0011
Award Amount (SAM.gov award notice)
$889.0K
Award Date
Jun 19, 2015
Awardee
Awardee UEI
DZJXJ5D3A496
Original Solicitation
Notice ID: 06b805bfec786eb8703b77586c9ad26f
Posted Date: Jun 22, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-04M3-S-15-0015- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationFeb 3, 2015
Baker Compound Work Center Building
- SolicitationMar 27, 2015
Baker Compound Work Center Building
- AwardedCurrentJun 22, 2015
Baker Compound Work Center Building
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-04M3-S-15-0015
Archive Date
Jul 8, 2015