Notice ID: 0240acca5c824f1cb15276a22f6538c1Solicitation
Crab Lake WRP Restoration Project
Archived on November 30, 2010. Full description on SAM.gov.
Overview
- Posted
- August 20, 2010
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Crab Lake, Grant County, Crab Lake
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 3, 2025
Identifiers
- Solicitation number
- AG-0546-S-10-0001
- Notice ID
- 0240acca5c824f1cb15276a22f6538c1
Description
USDA-Natural Resources Conservation Service is announcing a restoration project under the Crab Lake Wetland Reserve Program (WRP) located one mile east of Wilson Creek in Grant County, Washington. This project consists of providing all supplies, materials; equipment, labor, and incidentals needed to excavate approximately 153,700 cubic yards of soil to construct eight (8) excavated ponds with low mounds on 5 privately owned (government easement) properties within the Crab Lake basin, The ponds will be constructed adjacent to the main channel to provide open water for migratory birds to use for a longer period of time during the spring and early summer. The ponds are designed to stay wet longer than the existing channel and provide resting sites on the mounds. This improved habitat is designed to provide more deep open water and diversity in the basin. The performance period for this project is approximately 45 calendar days notice to proceed. A solicitation for this project will be available at http//www.fedbizopps.gov on or about June 30, 2010. Site showing information will be shown in the solicitation. Requests for hardcopy solicitation must be in writing addressed to ronald.joyner@wa.usda.gov or faxed to (509) 323-2909. Estimated price range: between $250,000 and $500,000.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-0546-S-10-0001- Pre-Solicitation
- Solicitation
- Awarded
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×Pre-SolicitationJun 15, 2010
Crab Lake WRP Restoration Project
- AwardedAug 20, 2010
Crab Lake WRP Restoration Project
- SolicitationCurrentAug 20, 2010
Crab Lake WRP Restoration Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-0546-S-10-0001
Archive Date
Nov 30, 2010