GovChime
Notice ID: 0240acca5c824f1cb15276a22f6538c1Solicitation

Crab Lake WRP Restoration Project

Archived on November 30, 2010. Full description on SAM.gov.

Overview

Posted
August 20, 2010
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

Place of performance
Crab Lake, Grant County, Crab Lake
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 3, 2025

Identifiers

Solicitation number
AG-0546-S-10-0001
Notice ID
0240acca5c824f1cb15276a22f6538c1

Description

USDA-Natural Resources Conservation Service is announcing a restoration project under the Crab Lake Wetland Reserve Program (WRP) located one mile east of Wilson Creek in Grant County, Washington. This project consists of providing all supplies, materials; equipment, labor, and incidentals needed to excavate approximately 153,700 cubic yards of soil to construct eight (8) excavated ponds with low mounds on 5 privately owned (government easement) properties within the Crab Lake basin, The ponds will be constructed adjacent to the main channel to provide open water for migratory birds to use for a longer period of time during the spring and early summer. The ponds are designed to stay wet longer than the existing channel and provide resting sites on the mounds. This improved habitat is designed to provide more deep open water and diversity in the basin. The performance period for this project is approximately 45 calendar days notice to proceed. A solicitation for this project will be available at http//www.fedbizopps.gov on or about June 30, 2010. Site showing information will be shown in the solicitation. Requests for hardcopy solicitation must be in writing addressed to ronald.joyner@wa.usda.gov or faxed to (509) 323-2909. Estimated price range: between $250,000 and $500,000.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Ronald L. Joyner
Contracting Officer
Fax: 509-323-2909

Secondary Contact

Amy J Smith
Contract Specialist
Fax: (509) 323-2909

Documents

No documents available.

Lifecycle

Solicitation:AG-0546-S-10-0001
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationJun 15, 2010

    Crab Lake WRP Restoration Project

    Notice 7b941b1871ff88c13d4c3f3abff38811 on SAM.gov

  2. AwardedAug 20, 2010

    Crab Lake WRP Restoration Project

    Notice 0f6672b572fd5ebacba24e2e90256bbe on SAM.gov

  3. SolicitationCurrentAug 20, 2010

    Crab Lake WRP Restoration Project

    Notice 0240acca5c824f1cb15276a22f6538c1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-0546-S-10-0001

Archive Date

Nov 30, 2010