GovChime
Notice ID: babf6c453f976ee32c9337c231778c13Solicitation

Kettle Crest Trail #13 South Rehabilitation

Archived on January 25, 2011. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−05:00
Posted
July 27, 2009
Notice type
Solicitation
Set-aside
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
COLVILLE NATIONAL FOREST
Place of performance
Ferry County, Washington State, KETTLE FALLS, 99141
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
AG-05G1-S-09-0016
Notice ID
babf6c453f976ee32c9337c231778c13

Description

Colville National Forest, Kettle Crest Trail #143South Rehabilitation The Three Rivers Ranger District on the Colville National Forest located in North Eastern Washington State has a requirement for trail rehabilitation services on Kettle Crest Trail #13 South. The project is located in Ferry County, Washington State. To reach the project from Colville, Washington, travel north on State Highway 395 for approximately 12 miles to State Highway 20, travel west on State Highway 20 for approximately 24 miles to Forest Road #2000495, travel north on Forest Road #2000495 for 0.15 miles to Kettle Crest Trail head. The project begins on the east side of the parking area. The Contractor shall provide all tools, equipment, material, supplies (there are no Government – Furnished), labor, supervision, workman’s compensation, unemployment insurance, facilities, transportation and incidentals to perform all work necessary to accomplish the trail rehabilitation project. This project consists of approximately 14.04 miles of trail rehabilitation of the Kettle Crest Trail #13 South from Kettle Crest Trailhead to White Mountain Trailhead on the Colville National Forest. The Kettle Crest Trail is designated as a National Recreation Trail and is part of the newly designated Pacific Northwest National Scenic Trail. The trail is open to hikers, mountain bikers, and horses; however motorized equipment can be used for trail reconstruction/restoration authorized by this contract. All work shall be completed by October 15, 2010. The trail is normally accessible by May 15th. Seasonal shutdowns are to be expected. The purpose of the project is to rehabilitate 73,989 linear feet of trail with a tread width of 24 inches. The project includes restoration of the tread, clearing vegetation within the clearing limits, rock and root removal, maintenance of existing rock waterbars and other drainage features, reconstruction of approximately 30 linear feet of turnpike with log or rock retainer, construction of one rock culvert, construction of rock waterbars and reconstruction and construction of rock shallow stream fords and gulley crossings. Native materials found along or adjacent to the trail are to be used for all construction (except for geotextile required under turnpike). The goal of the project is to have a free-draining, self-maintaining trail. The project is estimated between $100,000 to $250,000. A bid guarantee will be required. The awarded Contractor will have to provide both payment and performance bonds. This project will be advertised as a written request for proposals. Estimated issue date of the solicitation is on or about July 27, 2009. Proposals are estimated to be due August 26, 2009. The actual due date will be listed in the solicitation. The solicitation will be posted on this site. This acquisition is 100% set-aside for HubZone small business concerns. NAICS code is 237990 size standard is $31 million. All responsible sources may submit a proposal which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Cathy E. Van Alyne
Fax: (509) 684-7280

Documents

No documents available.

Lifecycle

Solicitation:AG-05G1-S-09-0016
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 10, 2009

    Kettle Crest Trail #13 South Rehabilitation

    Notice 5889d53e8bd455872e82afac5a0ee580 on SAM.gov

  2. SolicitationCurrentJul 27, 2009

    Kettle Crest Trail #13 South Rehabilitation

    Notice babf6c453f976ee32c9337c231778c13 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-05G1-S-09-0016

Archive Date

Jan 25, 2011

Office Address

COLVILLE, WA, 99114