Notice ID: babf6c453f976ee32c9337c231778c13Solicitation
Kettle Crest Trail #13 South Rehabilitation
Archived on January 25, 2011. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−05:00
- Posted
- July 27, 2009
- Notice type
- Solicitation
- Set-aside
- Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- COLVILLE NATIONAL FOREST
- Place of performance
- Ferry County, Washington State, KETTLE FALLS, 99141
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- AG-05G1-S-09-0016
- Notice ID
- babf6c453f976ee32c9337c231778c13
Description
Colville National Forest, Kettle Crest Trail #143South Rehabilitation The Three Rivers Ranger District on the Colville National Forest located in North Eastern Washington State has a requirement for trail rehabilitation services on Kettle Crest Trail #13 South. The project is located in Ferry County, Washington State. To reach the project from Colville, Washington, travel north on State Highway 395 for approximately 12 miles to State Highway 20, travel west on State Highway 20 for approximately 24 miles to Forest Road #2000495, travel north on Forest Road #2000495 for 0.15 miles to Kettle Crest Trail head. The project begins on the east side of the parking area. The Contractor shall provide all tools, equipment, material, supplies (there are no Government – Furnished), labor, supervision, workman’s compensation, unemployment insurance, facilities, transportation and incidentals to perform all work necessary to accomplish the trail rehabilitation project. This project consists of approximately 14.04 miles of trail rehabilitation of the Kettle Crest Trail #13 South from Kettle Crest Trailhead to White Mountain Trailhead on the Colville National Forest. The Kettle Crest Trail is designated as a National Recreation Trail and is part of the newly designated Pacific Northwest National Scenic Trail. The trail is open to hikers, mountain bikers, and horses; however motorized equipment can be used for trail reconstruction/restoration authorized by this contract. All work shall be completed by October 15, 2010. The trail is normally accessible by May 15th. Seasonal shutdowns are to be expected. The purpose of the project is to rehabilitate 73,989 linear feet of trail with a tread width of 24 inches. The project includes restoration of the tread, clearing vegetation within the clearing limits, rock and root removal, maintenance of existing rock waterbars and other drainage features, reconstruction of approximately 30 linear feet of turnpike with log or rock retainer, construction of one rock culvert, construction of rock waterbars and reconstruction and construction of rock shallow stream fords and gulley crossings. Native materials found along or adjacent to the trail are to be used for all construction (except for geotextile required under turnpike). The goal of the project is to have a free-draining, self-maintaining trail. The project is estimated between $100,000 to $250,000. A bid guarantee will be required. The awarded Contractor will have to provide both payment and performance bonds. This project will be advertised as a written request for proposals. Estimated issue date of the solicitation is on or about July 27, 2009. Proposals are estimated to be due August 26, 2009. The actual due date will be listed in the solicitation. The solicitation will be posted on this site. This acquisition is 100% set-aside for HubZone small business concerns. NAICS code is 237990 size standard is $31 million. All responsible sources may submit a proposal which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-05G1-S-09-0016- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 10, 2009
Kettle Crest Trail #13 South Rehabilitation
- SolicitationCurrentJul 27, 2009
Kettle Crest Trail #13 South Rehabilitation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-05G1-S-09-0016
Archive Date
Jan 25, 2011
Office Address
COLVILLE, WA, 99114