GovChime
Notice ID: a216980e7102ce304449f06abd78e612Award NoticeAwarded

Tupso Pass Road FSR #41 Drainage Upgrades

Awarded on August 23, 2010. Full description on SAM.gov.

Awarded tounder AG-05M6-C-10-0032 (source: SAM.gov award notice)• $600.0K

Overview

Posted
August 27, 2010
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
MT BAKER SNOQUALMIE NATIONAL FOREST
Place of performance
Mt. Baker National Forest Darrington Ranger District Snohomish County
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Aug 23, 2010
Award amount (SAM.gov award notice)
$600.0K

Identifiers

Solicitation number
AG-05M6-S-10-0047
Notice ID
a216980e7102ce304449f06abd78e612
Award number (PIID)
AG-05M6-C-10-0032

Description

The intent of this construction contract is to provide for drainage upgrades for Forest Service Road 41, Tupso Pass Road on the Darrington Ranger District of the Mt. Baker Snoqualmie National Forest. The repair consists of various drainage crossing upgrades by removing existing culverts and replacing with newer right sized culverts. Some sites will require large amounts of earthwork removal and replacing. The project is located on Forest Service Road 41, Tupso Pass Road from Mile Post 3.5 to M.P. 15.0 on the Darrington Ranger District in Township 31N, Range 8E, numerous Sections. To reach the project site, travel 8 miles east of Granite Falls, Washington on the Mountain Loop Hwy (FSR 20) to the intersection of FSR 41. Travel north on FSR 41 approximately 3.5 miles to the beginning of the project. A Darrington Ranger District map showing the road system is available for viewing and/or purchase at the Verlot Public Service Center 11 miles east of Granite Falls, Washington or the Darrington Ranger District office north on Hwy 530 in Darrington, Washington. The estimated issue date of the solicitation is on or about June 1, 2010. The estimated start work date is August 16, 2010. Contract work time is approximately 300 days. The Government's estimated price range is between $500,000.00 and $1,000,000.00. The project is 100% set aside for HUBzone small business. Payment security shall be required for this project. The technical contact is Jim Mitchell who can be reached at the Mt. Baker Ranger District at (360) 854-2620. Interested vendors can download a copy of the solicitation documents from this website when they become available.

Full description on SAM.gov

Award Overview

Award Number

AG-05M6-C-10-0032

Award Amount (SAM.gov award notice)

$600.0K

Award Date

Aug 23, 2010

Awardee

Original Solicitation

Notice ID: a216980e7102ce304449f06abd78e612

Posted Date: Aug 27, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Bonnie L. Childs
Contract Specialist
Fax: (425) 783-0129

Documents

No documents available.

Lifecycle

Solicitation:AG-05M6-S-10-0047
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationMay 17, 2010

    Tupso Pass Road FSR #41 Drainage Upgrades

    Notice 2801843980b2f388c2be39a6dfd0e359 on SAM.gov

  2. SolicitationJul 20, 2010

    Tupso Pass Road FSR #41 Drainage Upgrades

    Notice 15c24ce70f224fd2a67afffe0a3cb621 on SAM.gov

  3. AwardedCurrentAug 27, 2010

    Tupso Pass Road FSR #41 Drainage Upgrades

    Notice a216980e7102ce304449f06abd78e612 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-05M6-S-10-0047

Archive Date

Oct 13, 2010