GovChime
Notice ID: e69da6185c35712c1f1a7014680c3fe8Award NoticeAwarded

Russell Pond Road reconstruction

Awarded on June 22, 2016. Full description on SAM.gov.

Awarded tounder AG-1484-C-16-0010 (source: SAM.gov award notice)• $1.1M

Overview

Posted
June 22, 2016
Notice type
Award Notice
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
ALLEGHENY NATIONAL FOREST
Place of performance
East of I-93, 1.8 miles along Tripoli Road to Russell Pond Campground, Woodstock, 03223
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Jun 22, 2016
Award amount (SAM.gov award notice)
$1.1M

Identifiers

Solicitation number
AG-1484-S-16-0006
Notice ID
e69da6185c35712c1f1a7014680c3fe8
Award number (PIID)
AG-1484-C-16-0010

Description

C1-a) Introduction - The Forest Service (FS) is soliciting bids for the reconstruction of Russell Pond Road, in Thornton and Woodstock, NH within the White Mountain National Forest, Pemigewasset Ranger District. The contractor shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits (as applicable), coordination with utilities, transportation, and incidentals necessary to complete the work described. The desired outcome is completed installation per the standards attached to this solicitation, and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract. Work shall be completed as shown in the drawings, maps, specifications, and exhibits as referenced or included in this contract; and in accordance with applicable federal state and local regulations. C1-b) Description of Work - Work includes the removal of existing culverts and installation of new drainage structures, including dewatering, excavation, furnish and place structures, and structural backfill; removing existing asphalt (in-place) and reconditioning the roadbed; furnish and place aggregate and asphalt surfacing; recondition ditches; removing, storing, and reinstalling signs and gates; and marking of pavement. C1-c) Project Location - Russell Pond Road is located east of I-93, Exit 31, 1.8 miles along Tripoli Road. Russell Pond Road heads north from Tripoli Road and ends at the Russell Pond Campground. C1-d) Price Range - Between $1,000,000 and $5,000,000 C1-e) Pre-bid Tour - A pre-bid tour is planned for April 27th, 2016 at 10:00AM. Meet at the intersection of Tripoli and Russell Pond Roads. Questions and answers from the pre-bid tour will be posted to the solicitation. Prospective bidders wishing to visit the site on their own may obtain directional information by contacting Scott Lees (603) 536-6252 or Johanna Nugent (603) 536-6253 at the Forest Supervisor's Office, White Mountain National Forest, Campton, NH, or can call the Pemigewasset District Office, Campton, NH, telephone (603) 536-6100. Tripoli Rd is seasonally closed. Check on its status by clicking the "Forest Roads Status" on the White Mountain National Forest website at http://www.fs.usda.gov/whitemountain. C1-f) Start Work - It is estimated that pre-construction work will begin around August 1, 2016. Due to campground, construction shall not begin until August 15, 2016. Site disturbing activities shall be performed consistent with the periods of restriction noted in Plans, Permits, or other instruction. SOLICITATION WILL BE POSTED ON OR ABOUT APRIL 15, 2016

Full description on SAM.gov

Award Overview

Award Number

AG-1484-C-16-0010

Award Amount (SAM.gov award notice)

$1.1M

Award Date

Jun 22, 2016

Awardee

Awardee UEI

TZ4WDTQ6TLG9

Original Solicitation

Notice ID: e69da6185c35712c1f1a7014680c3fe8

Posted Date: Jun 22, 2016

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Alan J. Zero
Contracting officer
Fax: 814-726-1465

Documents

Select documents to download

Showing 10 of 10 items

Document
Source
Agency
Posted Date
File Size
Actions
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
PresolicitationFOREST SERVICEJun 22, 2016-
SolicitationFOREST SERVICEJun 22, 2016-

Lifecycle

Solicitation:AG-1484-S-16-0006
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationApr 1, 2016

    Russell Pond Road reconstruction

    Notice 282fe75c2bf022ad986b225fb4024d38 on SAM.gov

  2. SolicitationMay 13, 2016

    Russell Pond Road reconstruction

    Notice eef1038b80a76b2d714139bf165f6f2d on SAM.gov

  3. AwardedCurrentJun 22, 2016

    Russell Pond Road reconstruction

    Notice e69da6185c35712c1f1a7014680c3fe8 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-1484-S-16-0006

Archive Date

Jun 30, 2016