Notice ID: ffa8202b92ac4eb5e92f815cbf5d9a75Solicitation
Wetland Restoration Project � Hyde County, North Carolina � Easement 66453200004GH
Archived on September 27, 2016. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 PM UTC+02:00
- Posted
- September 14, 2016
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Longitude and Latitude Lines: LAT - 35 degrees 37� 39.05� N LON � 76 degrees 22� 49.67� W
- PSC
- F: NATURAL RESOURCES MANAGEMENT
- Last updated
- Dec 3, 2025
Identifiers
- Solicitation number
- AG-2B46-S-16-0013
- Notice ID
- ffa8202b92ac4eb5e92f815cbf5d9a75
Description
Solicitation: Released on 08/11/2016
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 6 of 6 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | SAM.gov | Sep 14, 2016 | - | |||
| Presolicitation | SAM.gov | Sep 14, 2016 | - | |||
| Presolicitation | SAM.gov | Sep 14, 2016 | - | |||
| Presolicitation | SAM.gov | Sep 14, 2016 | - | |||
| Presolicitation | SAM.gov | Sep 14, 2016 | - | |||
| Presolicitation | SAM.gov | Sep 14, 2016 | - |
Lifecycle
Solicitation:
AG-2B46-S-16-0013- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 4×Pre-SolicitationJul 26, 2016
Wetland Restoration Project � Hyde County, North Carolina � Easement 66453200004GH
- SolicitationCurrentSep 14, 2016
Wetland Restoration Project � Hyde County, North Carolina � Easement 66453200004GH
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The project is located along the right descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement. | 80% | Solicitation | 12/03/2026 |
On or about 23 October 2026, the Government intends to issue the Invitation for Bid (IFB) for LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2. The IFB will close on or about 3 December 2026. This is a 100% Small Business Set-Aside. Sit Visit: A Site Visit is scheduled for 3 November 2026. Additional information regarding the site visit will be provided in the solicitation in Section 00 21 00. Project Description: Element 2 of the project includes the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, and the creation of a 200-by-1,500-foot island within Reach 4 of the lake, in water up to three feet deep. The island will be planted with cottonwood trees and other culturally significant vegetation. To protect the lakeward side of the island from wind, wave action, and ice erosion, a riprap revetment will be installed. The sheltered open water area between the island and the shoreline is anticipated to naturally evolve into approximately 5.17 acres of emergent wetland. Additionally, this measure will result in the creation of roughly 32 acres of riparian habitat. DO NOT submit requests for plans and specifications. See Obtaining Solicitation Documents below. Completion Date: The Contractor will be required to commence work upon receipt of contract award and complete the work 550 days after receipt of Notice to Proceed. This is subject to change after IFB issuance. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. Estimated Construction Costs: The estimated construction cost of this project is between $10,000,000 and $25,000,000. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237990, Heavy and Other Civil Engineering Construction, with a size standard for Small Business of $45M. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS listed above is included in their profile prior to submission of offer. Contracting Officer Address: USACE Omaha District 1616 capital Ave Omaha, NE 68102-4901 Point Of Contact: All questions shall be submitted on ProjNet. ProjNet access, and additional guidance, will be given at time of issuance of the IFB Solicitation. Place of performance: Big Bend, Lower Brule, South Dakota 57548 Bid Submissions: BID SUBMISSION REQUIREMENTS HAVE CHANGED AND WILL NO LONGER BE ACCOMPLISHED VIA EMAIL. Contractors shall submit their bids via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module no later than 1 hour before the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable: **It is recommended that contractors create their PIEE Solicitation Module account as soon as possible and not wait till bid due date, as access may take time. The following information is provided for reference. Step 1: Complete vendor registration on https://piee.eb.mil/.Instructions for registration can be found through: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfStep 2: Upload offer in the Solicitation Module through https://piee.eb.mil/. Instructions for uploading an offer can be found through: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtmlDo not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractors should allow adequate time for submission completion because the entire bid must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable. Bids received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a bid, the bidder must ensure the submission is virus-free. The government will follow FAR 14.406 if a bid is unreadable. Part 15 is not applicable to this acquisition. Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Bidder/Teammate/Subcontractors should allow adequate time for submission completion because the entire bid (i.e. bidders submission and all teammate/subcontractor(s) independent submissions) must be received by the bid due date and time specified in Block 13 of SF 1442, or SF 30 as applicable. Obtaining Solicitation Documents: Solicitation documents will be posted in the PIEE Solicitation Module. A link to the solicitation documents on https://piee.eb.mil will be available on SAM.gov. The links below provide resources for accessing the PIEE Solicitation Module. Web Based Training for the PIEE Solicitation Module - https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml Department of Defense Procurement Toolbox - https://dodprocurementtoolbox.com/site-pages/solicitation-module Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. PHONE CALLS WILL NOT BE ACCEPTED. | 80% | Pre-Solicitation | Open |
*****Solicitation Notice Update to Post the Bid Abstract on 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | 80% | Awarded | Open |
*****Solicitation Notice Update to Post the Bid Abstract dated 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | 80% | Special Notice | Open |
*****Solicitation Notice Update to Post the Bid Abstract on 25 August 2026*****. **Amendment 0002- This amendment is to: A. Extend the invitation for bid due date from 13 August 2026 to 11:00 a.m. Eastern Daylight Time (EDT) on 25 August 2026. This amendment includes two (2) attachments.**Amendment 0001- This amendment is to: A. Provide Summary of Changes dated 06 August 2026, B. Provide clarification to NAICS code 237990 description, C. Provide DQM Pipeline Dredge Specifications for Small Business dated 04 August 2023, D. Provide Final Specifications and Final Plans dated August 2026, E. Incorporate Revolutionary Federal Acquisition Regulation (RFO) Clause 52.219-14 into the solicitation, F. Provide NE River Dredge Pre-Bid Site Visit Sign In Attendees_W912DR26BA010 dated 21 July 2026, G. Provide Wage Determination for MD20260035 - Cecil Co MD dated 04 June 2026, H. Responses to RFIs North East Dredging W912DR26BA0100001 dated 06 August 2026, and I. Revised Price Schedule dated 07 August 2026. This amendment includes nine (9) attachments. The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed. This invitation for bid has five (5) attachments. | 80% | Solicitation | 08/28/2026 |
Additional Details
Solicitation Number
AG-2B46-S-16-0013
Archive Date
Sep 27, 2016