GovChime
Notice ID: 7f085ff3867b289d69f7ab83ccf97371Solicitation

WRP Hydrology Restoration Project

Archived on February 27, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:30 AM UTC+02:00
Posted
June 24, 2016
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

Place of performance
Rutherford County
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 3, 2025

Identifiers

Solicitation number
AG-2B46-S-16-0033
Notice ID
7f085ff3867b289d69f7ab83ccf97371

Description

The project is for construction of a shallow water development on the John H. Taylor permanent wetland reserve program (WRP) easement located in Rutherford County, Tennessee. The work consists of excavation to create two ditches and earthfill for a ditch plug. One ditch will carry water through the existing shallow water impoundment to an inline water control structure. The second ditch will be constructed outside of the impoundment to intercept water and carry it to a swale that outlets into an off-site drain. A ditch plug and inline water control structure will be installed to manage water levels in the impoundment. The estimated price range for this project is less than $25,000. The performance time for this work is 22 calendar days. A site showing will be held for this project; the date and time will be posted in the bid package. Site showings are typically held within 1-2 weeks from the date the package is uploaded to this site. All contractors must be registered in, and complete the annual representations and certifications electronically via the System for Award Management (SAM) website at http://www.sam.gov, prior to being awarded a federal contract. The Request for Quotation (RFQ) will be issued on, or about, June 24, 2016. Interested offerors may register at www.fbo.gov to receive notification when the solicitation and any amendments are issued and available for downloading. All responsible sources may submit a written quotation which shall be considered by the agency.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Faith Tillman
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:AG-2B46-S-16-0033
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 10, 2016

    WRP Hydrology Restoration Project

    Notice d85fe9d277d5c6c4379997aac05d5e35 on SAM.gov

  2. SolicitationCurrentJun 24, 2016

    WRP Hydrology Restoration Project

    Notice 7f085ff3867b289d69f7ab83ccf97371 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-2B46-S-16-0033

Archive Date

Feb 27, 2017