Notice ID: e745423624cef570fcbf9b2b626e6f67Award NoticeAwarded
EWP Streambank Stabilization - South of Patchin Road Site, Town of Boston, Erie County, NY
Awarded on August 9, 2010. Full description on SAM.gov.
Awarded tounder AG-2C31-C-10-0010 (source: SAM.gov award notice)• $99.8K
Overview
- Posted
- August 11, 2010
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Town of Boston, Erie County
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 3, 2025
- Award date
- Aug 9, 2010
- Award amount (SAM.gov award notice)
- $99.8K
Identifiers
- Solicitation number
- AG-2C31-S-10-0007
- Notice ID
- e745423624cef570fcbf9b2b626e6f67
- Award number (PIID)
- AG-2C31-C-10-0010
Description
The USDA NRCS in New York is preparing to issue a solicitation for work authorized under the Emergency Watershed Protection Program due to recent heavy rain with resultant flooding conditions. This streambank stabilization work is to relieve imminent hazards to life and property. The work consists of site dewatering, installation of approximately 185 linear feet of stacked and pinned rock riprap, 110 linear feet of sloped rock riprap, one (1) rock stream barb (deflector) and seeding and plantings to stabilize the stream bed and banks along Eighteenmile Creek in the Town of Boston, Erie County, New York. Alternative payment protection in the amount of 50% of contract amount in the form of a payment bond or an irrevocable letter of credit will be required within 5 calendar days of award of contract. The location of the work sites will be within the flooded areas and as described in the solicitations. All necessary permits and land rights have been acquired. Price Range is between $25,000 - $100,000 Maximum performance time will be 8 calendar days A firm-fixed price award is anticipated under the Small Business Competitiveness Demonstration Program. The solicitation package, construction drawings and specifications will be posted and available from this site on or about July 20, 2010. Anticipated date for bid opening will be on August 5, 2010. A pre-bid site showing is scheduled for Thursday, July 29, 2010 at 1:30 p.m.. Meet at pull-off on Back Creek Road just south of Patchin Road.
Award Overview
Award Number
AG-2C31-C-10-0010
Award Amount (SAM.gov award notice)
$99.8K
Award Date
Aug 9, 2010
Awardee
Original Solicitation
Notice ID: e745423624cef570fcbf9b2b626e6f67
Posted Date: Aug 11, 2010
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-2C31-S-10-0007- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 3×Pre-SolicitationJul 19, 2010
EWP Streambank Stabilization - South of Patchin Road Site, Town of Boston, Erie County, NY
- SolicitationJul 30, 2010
EWP Streambank Stabilization - South of Patchin Road Site, Town of Boston, Erie County, NY
- AwardedCurrentAug 11, 2010
EWP Streambank Stabilization - South of Patchin Road Site, Town of Boston, Erie County, NY
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-2C31-S-10-0007
Archive Date
Aug 24, 2010