Notice ID: d7a2cdc2e0badb66ae0d669b36257c80Award NoticeAwarded
EWP - Streambank Stabilization - Taylor Hollow Road - South Bridge and North Bridge Sites, Town of Collins, Erie County, NY
Awarded on August 24, 2010. Full description on SAM.gov.
Awarded tounder AG-2C31-C-10-0012 (source: SAM.gov award notice)• $73.8K
Overview
- Posted
- August 27, 2010
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Town of Collins, Erie County, New York
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 3, 2025
- Award date
- Aug 24, 2010
- Award amount (SAM.gov award notice)
- $73.8K
Identifiers
- Solicitation number
- AG-2C31-S-10-0011
- Notice ID
- d7a2cdc2e0badb66ae0d669b36257c80
- Award number (PIID)
- AG-2C31-C-10-0012
Description
The USDA NRCS in New York is issuing this solicitation for work authorized under the Emergency Watershed Protection Program due to recent heavy rain with resultant flooding conditions. This streambank stabilization work is to relieve imminent hazards to life and property. This project consists of two sites - South Bridge Site and North Bridge Site. Work on the North Bridge Site includes site dewatering, channel clearing, the installation of approximately 180 linear feet of slope rock riprap, and seeding to stabilize the stream bank. The work on the South Bridge site consists of site dewatering, installation of approximately 30 linear feet of stacked and pinned rock riprap, 170 linear feet of sloped rock riprap, one (1) rock stream barb, seeding, and plantings to stabilize. All work is necessary to stablilize the stream bed and banks along Clear Creek in the Town of Collins, Erie County, New York. Alternative payment protection in the amount of 50% of contract amount in the form of a payment bond or an irrevocable letter of credit will be required within 7 calendar days of award of contract. The location of the work sites will be within the flooded areas and as described in the solicitations. All necessary permits and land rights have been acquired. A firm-fixed price award is anticipated under the Small Business Competitiveness Demonstration Program. The solicitation package, construction drawings and specifications are available only from this site. Bid opening is scheduled for 11:00 a.m. on August 19, 2010. A pre-bid site showing is scheduled for Thursday, August 12 at 10 a.m. To participate meet at the South Bridge in the pump station driveway on Taylor Road between Lenox 9aka West Quaker) and Richardson Roads. Price Range is between $25,000 - $100,000 Maximum performance time will be 24 calendar days
Award Overview
Award Number
AG-2C31-C-10-0012
Award Amount (SAM.gov award notice)
$73.8K
Award Date
Aug 24, 2010
Awardee
Original Solicitation
Notice ID: d7a2cdc2e0badb66ae0d669b36257c80
Posted Date: Aug 27, 2010
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-2C31-S-10-0011- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 2×Combined SynopsisAug 3, 2010
EWP - Streambank Stabilization - Taylor Hollow Road - South Bridge and North Bridge Sites, Town of Collins, Erie County, NY
- AwardedCurrentAug 27, 2010
EWP - Streambank Stabilization - Taylor Hollow Road - South Bridge and North Bridge Sites, Town of Collins, Erie County, NY
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-2C31-S-10-0011
Archive Date
Sep 8, 2010