GovChime
Notice ID: 231f1f755fb2ed5762ff7bc9ad35dacfAward NoticeAwarded

Mill Creek Coalition, Glenn Sites 17 & 19, AMD Treatment Project, Clarion & Jefferson Counties, PA.

Awarded on July 27, 2010. Full description on SAM.gov.

Awarded tounder AG-2D37-C-10-0007 (source: SAM.gov award notice)• $517.1K

Overview

Posted
July 26, 2010
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 3, 2025
Award date
Jul 27, 2010
Award amount (SAM.gov award notice)
$517.1K

Identifiers

Solicitation number
AG-2D37-S-10-0006
Notice ID
231f1f755fb2ed5762ff7bc9ad35dacf
Award number (PIID)
AG-2D37-C-10-0007

Description

The Purpose of this Addition to the Description of the Mill Creek Project is to Post by answering a Couple of questions raised that were not Covered in the Specs. This DOES NOT CHANGE the Sealed Bid Closing Date which Stays the same as: July 16, 2010 at 11:00am. The Following are Questions with Answers: 1. What is to be done with tree stumps? Answer: At the pre-bid, it was determined that the stumps be hauled or burnt at the contractors discretion. 2. Specs call for 2RC on Site 19, but not for Site 17. Is this correct? Answer: Yes, according to illustration 5 on sheet 4 (drawing for Site #19) 8 inches of 2RC is required., and illustration 4 on sheet 2 ((drawing for Site #17) 8 inches of native granular material (not defined) is required. In the pre-bid it was discussed that 2RC, which is equivalent to PennDOT 2A, may not be adequate in certain areas where the soil is saturated and the predominant soil type is a silty material. 3. Shall both access roads have geo-textile? Answer: No! Specifications call for 2RC aggregate with AASHTO #1 at the entrances. Geotextile was listed only at the entrances beneath the AASHTO #1. 4. Are all concrete structures (except weir) to be 6 inches thick? Answer: No, thicknesses will depend on the span, internal pressures, and the casting procedures (in-place vs. precast). 5. What size of 60% CaC03 is needed in the AeLB Pond? Answer: AASHTO #3 (2.5 to 0.5 ) page 1000-2 in Technical Specifications. Although illustration 3 of Sheet 4 lists TS 1008 as the reference document, it is actually TS1002. These Questions and Answers DO NOT Change the Sealed Bid Opening date. The Sealed Bid Opening Date remains the same which is: July 16, 2010 at 11:00am.

Full description on SAM.gov

Award Overview

Award Number

AG-2D37-C-10-0007

Award Amount (SAM.gov award notice)

$517.1K

Award Date

Jul 27, 2010

Awardee

Original Solicitation

Notice ID: 231f1f755fb2ed5762ff7bc9ad35dacf

Posted Date: Jul 26, 2010

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Edward W. Hall
Contract Officer

Documents

No documents available.

Lifecycle

Solicitation:AG-2D37-S-10-0006
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationApr 30, 2010

    Mill Creek Coalition, Glenn Sites 17 & 19, AMD Treatment Project, Clarion & Jefferson Counties, PA.

    Notice c1747d43658b2cb8e4acee8a70513197 on SAM.gov

  2. SolicitationJul 2, 2010

    Mill Creek Coalition, Glenn Sites 17 & 19, AMD Treatment Project, Clarion & Jefferson Counties, PA.

    Notice 6f98d52586be221edd051f0b63ad4cd4 on SAM.gov

  3. AwardedCurrentJul 26, 2010

    Mill Creek Coalition, Glenn Sites 17 & 19, AMD Treatment Project, Clarion & Jefferson Counties, PA.

    Notice 231f1f755fb2ed5762ff7bc9ad35dacf on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

AG-2D37-S-10-0006

Archive Date

Dec 29, 2015