GovChime
Notice ID: 83990025cdd62ab5966c3cfd33f625d2Award NoticeAwarded

Design-Build-Bridging Construction Services for the Modernization of the U.S. National Poultry Research Center (USNPRC), SEPRL Campus in Athens, GA

Awarded on July 31, 2017. Full description on SAM.gov.

Awarded tounder AG-3K25-C-17-0001 (source: SAM.gov award notice)• $141.5M

Overview

Posted
August 3, 2017
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction

Notice details

Place of performance
934 College Station Road , Athens, 30605
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025
Award date
Jul 31, 2017
Award amount (SAM.gov award notice)
$141.5M

Identifiers

Solicitation number
AG-3K25-S-17-0003
Notice ID
83990025cdd62ab5966c3cfd33f625d2
Award number (PIID)
AG-3K25-C-17-0001

Description

The USDA, Agricultural Research Service, intends to issue a Request for Proposal (RFP) for the replacement of the Southeast Poultry Research Laboratory (SEPRL) at the U.S. National Poultry Research Center in Athens, GA. This SEPRL Modernization Project will be implemented by the Design-Build project delivery method and will involve the design and construction of an entirely new research campus. The USDA has developed a set of Bridging Documents (plans and specifications) showing and describing the project's essential elements. BACKGROUND: The SEPRL staff currently conducts research activities in more than thirty buildings with a combined floor area of approximately of 80,000 Gross Square Feet (GSF) on a thirty-two acre site. The offices, laboratories, conference and animal facilities are outdated, poorly equipped and overcrowded. Since the construction of the campus in the 1960s, the scope and objectives of SEPRL's research mission have changed, resulting in the facilities' inability to properly support the research necessary to lead the nation and the world in the control of devastating poultry and zoonotic diseases such as avian influenza. REQUIREMENT: The selected Design Build Contractor (DBC) will be required to provide all of the necessary professional architectural and engineering services. The scope of this contract will require the DBC to demolish 29 buildings occupying approximately 69,000 GSF, to construct four new main buildings occupying approximately 255,000 GSF, some smaller support buildings, and to completely replace all of the existing utility systems. The four new main buildings will consist of: 1) Building (B)45, a two story, laboratory, office, and administration building occupying about 67,000 GSF; 2) B46, an Animal Biosafety Level- 2 (ABSL-2) poultry holding facility with a main floor, penthouse and basement, with a floor area of about 87,000 GSF; 3) B47, consisting of: a) Biosafety Level-3 Enhanced (BSL-3E) laboratories, b) Animal Biosafety Level-3 Enhanced (ABSL-3E) poultry holding facilities; and c) Biosafety Level-3 Agriculture (BSL-3AG) animal holding facilities, housed on a main floor, a two level penthouse, a basement and a mezzanine, with a combined area of approximately 89,000 GSF; and 4) B49, a hatchery and brooding facility with a main floor and basement covering about 12,000 GSF. BASE: Base Item - All project design and construction work is contained in the Base Item, except for the Optional Items described below. OPTIONS: OPTION 001 - Provide and install in B46 a new tissue renderer and all of its associated utilities as shown in the Bridging Documents (BD) plans and specifications. OPTION 002 - Provide all labor, material and equipment to upgrade the HEPA filter boxes in B47 with an automatic scan testing feature. This option shall also include providing two automatic scanning systems complete with all necessary equipment needed to perform the automatic scan. OPTION 003 - Provide all labor, material and equipment to construct a pre-engineered building (B50) as detailed on the BDs. The DBC may use this building for storage during the construction duration and prior to the Government's taking ownership of the building. The warranty period for this building will not start until Government takes ownership of the building. GENERAL: The contract performance time is approximately 2008 calendar days (Base and all Optional Items) after the issuance of the Notice to Proceed. Total Design-Build cost is estimated to be more than $100 million. The North American Industry Classification System (NAICS) codes are 236220 (Construction), 541310 (Architect) and 541330 (Engineering), with a size standard of $33.5 million for construction and $4.5 million for architectural and engineering services. This project will be initiated by a two-phase design-build solicitation. This procurement is being issued on an unrestricted basis using full and open competition utilizing the negotiated method by issuing a Request for Proposal (RFP). The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful DBC must design and construct complete and useable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Phase One is the pre-selection phase. This phase does NOT include the submission of a price proposal. Evaluation factors under Phase One may consist of the following: Bonding, Project Management, Special Experience & Technical Capacity and Past Performance. Proposals will be evaluated in Phase One to determine which offerors are eligible to submit proposals for Phase Two, and an amendment to the RFP will be issued to those selected offerors (maximum of four). The detailed project performance requirements for this project will be included in the amended RFP package for Phase Two. The Evaluation Factors for Phase Two will consist of the following: Technical Solutions, Oral Presentations, the Design-Build Team, and Small Business Utilization. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a sub-contracting plan as part of its proposal package during Phase Two of the solicitation. The contract will be awarded, based on the Best Value "Trade-off" process, to the firm whose proposal, in the judgment of the Contracting Officer, provides the best combination of design features and cost or price reasonableness. In making this determination, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price. The Government reserves the right to make the contract award to other than the lowest price offeror, price and other factors considered. Bid Bonds are required. Performance and Payment Bonds will be required by the successful offeror. It is anticipated that the solicitation documents will be available for viewing and downloading on FedBizOpps (www.fedbizopps.gov) on or about December 22, 2016. Plans and specifications will NOT be provided in hard paper copy. The solicitation and all amendments for the RFP will be posted on www.fbo.gov Proposals are due on or about January 26, 2017, at the George Washington Carver Center (GWCC), ATTN; Michael Wigfall, 5601 Sunnyside Avenue, Beltsville, MD 20705-5123. Due to the heightened security at Government buildings, offerors are encouraged to send their proposals via overnight mail. If proposals are sent via regular mail, please allow an additional five (5) days for mail scanning. Couriers will not be allowed to drop proposals off at the security desk; they must take them to the mail room located at the back of the building and therefore must do so in enough time to meet the date and time for receipt of proposals. All responsible sources may submit a proposal which will be considered. Offerors will have the maximum timeframe expressed in calendar days below to develop proposals in response to Phase 1 and Phase 2. In Phase I, the Government will evaluate Performance Capability proposals to "Shortlist" a maximum of four (4) of the most highly qualified Offerors. ONLY those firms selected in Phase I will be allowed to participate in Phase II. a. PHASE 1 - 30 Calendar Days b. PHASE 2 - 30 Calendar Days It is the responsibility of the contractor to check www.fbo.gov frequently for any amendments or changes to the solicitation. The Government is not responsible for any loss of internet connectivity or for an offeror's inability to access the documents posted at the referenced website. No copies on electronic storage (USBs, DVDs, CDs, etc...) or hard copies will be made available. If an offeror would like to be listed so that others can see that the offeror is an interested vendor, the offeror must click the "Add Me to Interested Vendors" button in the listing for this solicitation on www.fbo.gov

Full description on SAM.gov

Award Overview

Award Number

AG-3K25-C-17-0001

Award Amount (SAM.gov award notice)

$141.5M

Award Date

Jul 31, 2017

Awardee

Awardee UEI

GPXRWUEUHZ19

Original Solicitation

Notice ID: 83990025cdd62ab5966c3cfd33f625d2

Posted Date: Aug 3, 2017

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

More From This Vendor

Top 5 most recent

1
  • 1232SA20C0005
    M. A. MORTENSON COMPANY
    Department of AgricultureNAICS 236220
    $95.9MSigned Dec 11, 2024

Contacts

Contracting Officer

Primary Contact

Michael J Wigfall
Contracting Officer
Fax: 301-504-1216

Documents

No documents available.

Lifecycle

Solicitation:AG-3K25-S-17-0003
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 10×
    Pre-SolicitationDec 6, 2016

    Design-Build-Bridging Construction Services for the Modernization of the U.S. National Poultry Research Center (USNPRC), SEPRL Campus in Athens, GA

    Notice b611526f9474697076f8ca54d05782f0 on SAM.gov

  2. SolicitationApr 3, 2017

    Design-Build-Bridging Construction Services for the Modernization of the U.S. National Poultry Research Center (USNPRC), SEPRL Campus in Athens, GA

    Notice 22f0c1b1946482ccd2076cb9b3dd163b on SAM.gov

  3. AwardedCurrentAug 3, 2017

    Design-Build-Bridging Construction Services for the Modernization of the U.S. National Poultry Research Center (USNPRC), SEPRL Campus in Athens, GA

    Notice 83990025cdd62ab5966c3cfd33f625d2 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
***To obtain access to the controlled documents in SAM.gov, complete Attachment 11, Non-Disclosure Agreement and return to the Contracting Officer (Brett Zeigler, brett.zeigler@fletc.dhs.gov) then request access to the controlled documents in SAM.gov*** Amendment 0005: The purpose of this amendment is to provide final responses to questions submitted. Request for Information 04 is provided as an attachment. Proposal due date and time is unchanged; November 18, 2026 11:00 a.m. Eastern Time. Amendment 0004: The purpose of this amendment is to provide responses to questions submitted. Request for Information 03 is provided as an attachment. Request for Information 02 required corrections and is provided with Amendment 0004. Amendment 0003: The purpose of this amendment is to extend the proposal due date (11-18-2026, 11:00 AM ET), set the final date for submitting questions (11-06-2026, 5:00 PM ET), and provide responses to questions submitted. Request for Information 02 is provided as an attachment, updates are highlight yellow. Amendment 0002: The purpose of this amendment is to provide responses to questions submitted, post the site-visit sign-in sheet, provide photos, provide drawings, and update the statement of work and specifcations. Amendment 0001: The purpose of this amendment is to clarify the date of the site visit (October 22, 2026), period of performance, and due date for submitting questions. This Request for Proposal will result in a Single Firm Fixed Price Contract Award for Building 262 Renovation on the Federal Law Enforcement Training Center Glynco, GA. This acquisition is a 100% Small Business Set-Aside, under North American Industry Classification Systems (NAICS) Code 236220, Commercial and Institutional Building Construction. A site visit is scheduled for October 22, 2026, at 9:00am at FLETC Glynco Building 200. Upon arrival, attendees should report to the commercial gate a minimum of 30 minutes prior to the application screening process, then proceed to Building 200. All personnel who are not currently badged will need to complete and return Day Pass applications for all attendees no later than October 20, 2026, at 5:00pm to the attention of Project Manager, Richard Love at richard.love@fletc.dhs.gov. Please coordinate receipt of badge applications and submission with Mr. Love. Complete Attachment 11, Non-Disclosure Agreement and return to the attention of the Contracting Officer. The completed NDA is requierd to obtain access to controlled documents in SAM.
-Solicitation11/18/2026
This is a special notice prepared in accordance with the Revolutionary FAR Overhaul (RFO) Federal Acquisition Regulation (FAR) 5.1 "Pre-solicitation Notice" for Commercial Simplified Acquisition in accordance with FAR 12.201-1(c)(2)(i). In accordance with RFO 12.201-1(c)(2), the Government may solicit quotations directly from suppliers for this acquisition at or below the simplified acquisition threshold. The USDA Forest Service intends to award a firm fixed price (FFP) purchase order using Simplified Acquisition Procedures that meets the specifications outlined below. This is not a Request for Quotes. This solicitation will be a 100% Small Business Set-Aside. This announcement constitutes the only notice, and a written solicitation will not be posted. Quotes will be requested under reference 12445527Q0009, for mold abatement at the White Mountain National Forest headquarters. The small business size standard for NAICS code 236220 (Commercial and Institutional Building Construction) is $45.0 million.
-Special Notice11/10/2026
11/09/2026- See attached solicitation amendment 0002 to post RFI responses and extend proposals due date. (attachments 0002, 0002A,0002B) 10/19/2026- See attached solicitation amendment 0001 to provide Pre-Bid Site Visit Attendance Sheet (attachment 0001). 10/15/26- Update made to Point of Contact. 10/13/26- See attached solicitation and attachments 1-11 for details.
-Solicitation11/19/2026
-AwardedOpen
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent’s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team’s understanding of the Robins Air Force Base operational environment The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team’s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project.
-Special Notice11/20/2026

Additional Details

Solicitation Number

AG-3K25-S-17-0003

Archive Date

Aug 15, 2017