Notice ID: c3bfa8603c91770792edca7a894d4754Award NoticeAwarded
Spruce Knob Road Paving
Awarded on September 23, 2009. Full description on SAM.gov.
Awarded tounder AG-3434-C-09-0012 (source: SAM.gov award notice)• $146.2K
Overview
- Posted
- October 9, 2009
- Notice type
- Award Notice
- NAICS
- 237310: Highway, Street, and Bridge Construction
Notice details
- Place of performance
- CHeat/Patomac Ranger District Monongahela National Forest, Randolph County
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 3, 2025
- Award date
- Sep 23, 2009
- Award amount (SAM.gov award notice)
- $146.2K
Identifiers
- Solicitation number
- AG-52B1-S-09-0037
- Notice ID
- c3bfa8603c91770792edca7a894d4754
- Award number (PIID)
- AG-3434-C-09-0012
Description
The USDA Forest Service, Monongahela National Forest, Cheat/Potomac Ranger District, Randolph County, WV has a requirement to provide road paving services to Spruce Knob Road. All work to be performed in accordance with the West Virginia Division of Highways, Standard Specifications Roads and Bridges, Adopted 2000 and West Virginia Division of Highways, Supplemental Specifications, Issued July 1, 2001. Contractor is required meet all state, federal and local laws and secure all necessary permits. Solicitation Type: Sealed Bid per FAR Part 14 Project Location: From Elkins, WV follow US 33 East approximately 20 miles to County Road 29; follow CR 29 approximately 20 miles to Forest Road 1; follow Forest Road 1 approximately 2 miles to project site at lake. The applicable North American Industry Classification System (NAICS) Code is 237310 with a Size Standard of $33.5 Million. DOL General Decision Number: WV080003 REV 19 dtd 07/03/2009 applies to this project Project Estimate: Between $100,000.00 and $250,000.00. Period of performance is 30 days. The solicitation will be available ONLY electronically at the FEDBIZOPSS website http://www.fedbizopps.gov. Bids are not solicited at this time. Solicitation documents will be posted on-or-about August 3, 2009 A pre-solicitation conference and site visit will be scheduled, see solicitation documents (when posted) for date, time and location
Award Overview
Award Number
AG-3434-C-09-0012
Award Amount (SAM.gov award notice)
$146.2K
Award Date
Sep 23, 2009
Awardee
Original Solicitation
Notice ID: c3bfa8603c91770792edca7a894d4754
Posted Date: Oct 9, 2009
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-52B1-S-09-0037- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationJul 7, 2009
Spruce Knob Road Paving
- 2×Pre-SolicitationAug 20, 2009
Spruce Knob Road Paving
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
ACCESS ROAD CONSTRUCITON OF 8R MIDFIELD RVR AND 15L RO RVR, GEORGE BUSH INTERCONTINENTAL, HOUSTON, TEXAS THIS IS A 2-TIERED SOLICITATION. PREFERENCE IS FIRST GIVEN TO SBA CERTIFIED SMALL BUSINESSES AND THEN FULL AND OPEN IF THERE IS INSUFFICIENT COMPETITION- PLEASE SEE SECTIONS L AND M FOR MORE INFORMATION. ESTIMATED START DATE IS 8/2/27- PLEASE SEE ATTACHED SOLICITATION AND ATTACHMENTS FOR FURTHER DETAILS | 75% | Solicitation | 01/14/2027 |
Work will consist of furnishing all labor, equipment, materials, warranties, and site survey to accomplish the repair and repaving of 2,892 square yards of the Project Office Back Lot in accordance with the below listed specifications and drawings. | 67% | Solicitation | 08/10/2026 |
The contractor shall provide complete, performance-based asphalt pavement surface maintenance services that result in a structurally sound, durable, and safe paved surface capable of supporting heavy transport vehicles and loading-dock traffic. All services must ensure positive drainage away from adjacent structures, flush and code-compliant transitions at concrete interfaces, and compliance with federal safety regulations and local installation standards. The Contractor shall complete all work in accordance with North Carolina Department of Transportation Specifications. The estimated area of work is approximately 1300 to 1500 square feet. | 66% | Market Research | 11/10/2026 |
This is a sources sought synopsis announcement; a market survey for information only. This is not a solicitation for proposals and no contract will be awarded from this synopsis. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow-up information requests. The purpose of this synopsis is to gain knowledge of potentially qualified sources; please do not request a copy of a solicitation, as one does not exist at this time. An industry day is not required for this sources sought. This sources sought is attempting to seek small businesses capable of meeting the requirement. Estimated Scope of Work: The Contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required for maintaining and repairing existing paved and unpaved structures and constructing new paved and unpaved structures, including but not limited to paved and unpaved roadways, bridges, sidewalks, parking areas, motor pools, airfields, and runways to include subsequent services and typical features that promote safe and efficient transportation (trails, ditches, curbs and gutters, traffic signals, traffic signs, street lights, and drainage features). Projects may include landscaping, electrical, and drainage work. The 50th Contracting Squadron at Schriever SFB in Colorado Springs, CO seeks potential sources capable of providing: 1. Corporate Identity: Provide your company’s name, physical address, UEI number, CAGE code, and primary Point of Contact (name, title, phone, email). 2. Socio-Economic Status & Size Standard Transition: Under NAICS code 237310 (Highway, Street, and Bridge Construction): a. Current Status: What is your current business size and socio-economic status (e.g., 8(a), HUBZone, SDVOSB, WOSB, Small Business, or Large Business) under the current $45M monetary size standard? b. Proposed Status: Please note that the proposed rule on Small Business Size Standards may change this NAICS code’s standard from $45M to 700 employees (potentially increasing the number of eligible small businesses). What would your business size status be if this proposed rule is fully implemented? 3. Bonding Capacity: What is your current single-project bonding limit and aggregate bonding capacity? 4. Geographic Footprint: Please indicate your capability and interest in executing task orders in the following locations (Specify All, Some, or None; if "Some", please specify which states/regions): Colorado, Wyoming, Utah, New Mexico. 5. ADB & PDB Familiarity: Are you familiar with, willing, and capable of operating under a Progressive Design Build (PDB) contract structure? PDB reduces execution risk by selecting a partner based on qualifications to co-develop the design and negotiate a Guaranteed Maximum Price, offering a built-in "off-ramp" to compete the build separately if a fair price is not met. 6. Commercial: Do you believe the requirements described in the Estimated Scope of Work are custom-tailored to the government and should be considered non-commercial, or are they consistent with services regularly offered in the commercial marketplace? 7. Pre-Priced Work: What type of work (labor, materials, etc) would you see fit to pre-priced at the IDIQ level? Would the location (state, county, installation) impact this decision? Does pre-priced IDIQ work align with commercial industry standards? 8. Industry Feedback: Do you have any comments, questions, or recommendations? | 66% | Market Research | 11/20/2026 |
OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link. | 64% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
AG-52B1-S-09-0037
Archive Date
Dec 31, 2009