GovChime

Thornapple Wetland Restoration Project

Overview

Response deadline
12:00 AM UTC+02:00
Posted
June 21, 2012
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237990: Other Heavy and Civil Engineering Construction

Notice details

PSC
F: NATURAL RESOURCES MANAGEMENT
Last updated
Dec 3, 2025

Identifiers

Solicitation number
AG-5D21-S-12-0003
Notice ID
0c2c9a99db9a6bcc35f2c85a3d471332

Description

The work on this project will consist of installing a water level control structure to facilitate restoration of wetlands on several properties adjacent to the Thornapple Drain in Eaton County, MI. Work on the water level control structure will consist of installing a steel sheet pile structure with a central stop log bay to control water level conditions. Other work includes site clearing, fabrication of a steel catwalk and other miscellaneous metal fabrication, installation of rock riprap, soil erosion and sedimentation control measures, seeding, and mulching. Equipment such as dozers, excavators, off-road dump trucks, cranes, and other equipment necessary to drive steel sheet piling will be used to construct the water level control structure. Performance time is 90 days for the entire project

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Michael D. Scott
Contracting Officer

Secondary Contact

Michelle Bales
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:AG-5D21-S-12-0003
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentMay 24, 2012

    Thornapple Wetland Restoration Project

    Notice 0c2c9a99db9a6bcc35f2c85a3d471332 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-5D21-S-12-0003

Archive Date

Jul 11, 2012