GovChime
Notice ID: cc35851b700190d702572c12e9e37207Combined Synopsis/Solicitation

Asphalt Overlay, Ava Ranger District

Archived on June 1, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 PM UTC+02:00
Posted
May 3, 2017
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE
Place of performance
USDA Forest Service Ava Ranger District 1103 S Jefferson, Ava, 65608
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
AG-64R4-S-17-0022
Notice ID
cc35851b700190d702572c12e9e37207

Description

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offors are being requested. Solicitation AG-64R4-S-17-0022 is issued as RFQ under FAR Part 13. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-95 100% Small Business, NAICS 237310 small business size standard $36.50 Million. Project Magnitude: Under $10,000. Furnish all labor, equipment and materials to complete the following work: Visitor Parking Lot Overlay: The parking lot (332 SY) will be marked for overlay by the Forest Service. The existing parking lot surface shall be free of loose material, dirt, or other deleterious material by approved methods. Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins. Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide a minimum of 2" compacted depth overlay of approved hot asphalt mix. Provide three 411 wide white pavement markings 20 foot in length as located by the COR. 48 hour notice must be given before construction begins. Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway. Warehouse Road Overlay: The road (304 SY) will be marked for overlay by the Forest Service. The existing road surface shall be free of loose material, dirt or other deleterious material by approved methods. Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins. Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide 2" compacted depth overlay of approved hot asphalt mix. 48 hour notice must be given before construction begins. Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway. Site Visit: A contractor evaluation of site is recommended. A pre-bid visit with Darren Morris; Transportation Engineer, can be scheduled. FAR 52.212-1; 52.212-2; 52.212-3; 52.212-4, 52.212-5 apply to this acquisition. Quotes are due 5/17/17. eMail submissions to dceaster@fs.fed.us

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:AG-64R4-S-17-0022
  1. Combined Synopsis
  1. Combined SynopsisCurrentMay 3, 2017

    Asphalt Overlay, Ava Ranger District

    Notice cc35851b700190d702572c12e9e37207 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-64R4-S-17-0022

Archive Date

Jun 1, 2017