Notice ID: a2f49786a72cdd25e59924652de52166Combined Synopsis/Solicitation
Asphalt Patching Poplar Bluff Ranger District
Archived on June 1, 2017. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 PM UTC+02:00
- Posted
- May 3, 2017
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE
- Place of performance
- USDA Forest Service Poplar Bluff Ranger District 1420 Maud Street, Poplar Bluff, 63901
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- AG-64R4-S-17-0024
- Notice ID
- a2f49786a72cdd25e59924652de52166
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested. Solicitation AG-64R4-S-17-0024 is issued as RFQ under FAR Part 13. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-95 100% Small Business, NAICS 237310 small business size standard $36.50 Million. Project Magnitude: Under $25,000. Furnish all labor, equipment and materials to complete the following work: The admin site asphalt patching area is approximately 552 SY. This area will be marked by the Forest Service. Contractor shall cut existing asphalt area as marked. Then area will be excavated 10 inches in depth and material disposed of off-site. Base rock shall be placed 6 inches in depth and in two lifts. Asphalt shall be placed 4 inches in depth and in two-lifts. Asphalt and Base rock finished elevations shall be constructed to provide drainage of surface to utilize existing drainage features. 48 hour notice must be given before constructions begins. Contractor shall provide all traffic control necessary to perform project. Care shall be taken not to damage existing pavement or structures. Site Visit: A contractor evaluation of site is recommended. A pre-bid visit with Darren Morris; Transportation Engineer, can be scheduled. FAR 52.212-1; 52.212-2; 52.212-3; 52.212-4, 52.212-5, and Sustainable Products and Services apply to this acquisition. Quotes are due 5/17/17. eMail submissions to dceaster@fs.fed.us
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-64R4-S-17-0024- Combined Synopsis
- Combined SynopsisCurrentMay 3, 2017
Asphalt Patching Poplar Bluff Ranger District
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-64R4-S-17-0024
Archive Date
Jun 1, 2017