Woods Creek Rehabilitation and Road Decommissioning Project

Awarded tounder AG-82AT-C-13-0041 (source: SAM.gov award notice)• $39.3K

Overview

Posted
September 6, 2013
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Rocky Mountain Regional Office
Place of performance
Clear Creek Ranger District 101 Highway 103, Idaho Springs, 80452
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Sep 5, 2013
Award amount (SAM.gov award notice)
$39.3K

Identifiers

Solicitation number
AG-82AT-S-13-0032
Notice ID
73eeaec95a6ab16b0d81b46a4af509ff
Award number (PIID)
AG-82AT-C-13-0041

Description

Woods Creek Rehabilitation and Road Decommissioning project consists of rehabilitation of a segment of stream channel including temporary installation of Sedimat (or equal), construction of 12 boulder weir structures (1200-foot segment) and stream bank/streambed reconstruction (20-foot long segment). Optional bid items are obliteration of 2-miles of road and seeding and mulching of the obliterated road footprint. Primary equipment for stream work and road obliteration is to be a tracked CAT 325D excavator with bucket/thumb attachment or proven similar. The intent of the contract is to provide for the complete construction of the project as described in the contract. This project requires the Contractor to supply all labor, materials, equipment, tools, transportation, freight and delivery, as well as all necessary licenses and permits required to complete the project in reasonably close conformity with the drawings and specification, and in accordance with the provisions of the contract. All services will be accomplished by use of Contractor furnished and Contractor operated equipment. The allotted time for this contract is forty-five (45) days from the notice to proceed. All work shall be performed on the Arapaho/Roosevelt National Forest and Pawnee National Grasslands. Location The Woods Creek project is located on the Clear Creek Ranger District, Arapaho and Roosevelt National Forest and Pawnee National Grassland. To get to the project, take US Highway 40 west from I-70 approximately 9 miles to just above the Town of Berthoud Falls, turn off at turn to Big Bend Picnic Area south, travel approximately 1500 feet to County Road 203, take County Road 203 southwest to the site just above the Upper Urad Reservoir (approximately 3 miles from US Highway 40). The site is located in Township 3 South, Range 76 West, Sections 2, 35, 36, Clear Creek County. NOTE: 203 is closed to public, coordinate access with US Forest Service. A pre-proposal site visit is scheduled for July 31, 2013 at 10:00 a.m. Details of this meeting will be included in the solicitation. All participants must RSVP by July 30, 2013 by contacting Malinda (Mindy) Jiminez at 970-295-6683 or by email at mrjiminez@fs.fed.us. Government Estimate is between $25,000.00 and $100,000.00 This is a total Service Disabled Veteran Owned small business set aside. The anticipated date for issuance of the solicitation is on or around July 22, 2013. The due date will be identified on the solicitation. The solicitation will be available for free download at www.fbo.gov. All questions pertaining to this solicitation must be submitted, in writing, to Malinda (Mindy) Jiminez at mrjiminezi@fs.fed.us no later than August 5, 2013. All Offerors shall be registered with the System of Award Management (SAM) www.sam.gov in accordance to FAR 52.204-7 and FAR 52.204-8 (previously know as CCR and ORCA) to be considered responsive to this solicitation. All Offerors must respond to all evaluation criteria in Section M of the solicitation to be considered responsive to this solicitation. Offerors to fail to meet these three criteria will not be considered in the Technical Evaluation of offers.

Full description on SAM.gov

Award Overview

Award Number

AG-82AT-C-13-0041

Award Amount (SAM.gov award notice)

$39.3K

Award Date

Sep 5, 2013

Awardee

Awardee UEI

LPCZDWF8NAS6

Original Solicitation

Notice ID: 73eeaec95a6ab16b0d81b46a4af509ff

Posted Date: Sep 6, 2013

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Malinda Jiminez
Contract Specialist
Fax: 9702956699

Secondary Contact

Kasey Koch
Contract Specialist
Fax: 970-295-6699

Documents

No documents available.

Lifecycle

Solicitation:AG-82AT-S-13-0032
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationJul 19, 2013

    Woods Creek Rehabilitation and Road Decommissioning Project

    Notice e97cf5aa8b538522a21f417a6de47a00 on SAM.gov

  2. SolicitationAug 6, 2013

    Woods Creek Rehabilitation and Road Decommissioning Project

    Notice 75d076f7892a13d75f4badfb09da4e47 on SAM.gov

  3. AwardedCurrentSep 6, 2013

    Woods Creek Rehabilitation and Road Decommissioning Project

    Notice 73eeaec95a6ab16b0d81b46a4af509ff on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82AT-S-13-0032

Archive Date

Oct 3, 2013