GovChime
Notice ID: 1233f27d6c68ef10565a5e6d5d7d0d9eSolicitation

Idaho Panhandle NF - Central Zone Bridge Replacements

Archived on October 1, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
August 19, 2009
Notice type
Solicitation
Set-aside
Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC IM
Place of performance
Idaho Panhandle National Forest Coeur d’Alene River Ranger District
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
AG-82B1-S-09-0064
Notice ID
1233f27d6c68ef10565a5e6d5d7d0d9e

Description

The USDA Forest Service, Idaho Panhandle National Forest, intends to acquire by contract the repair of seven existing timber bridges and two concrete bridges. The work includes but is not limited to minor clearing of vegetation, treatment of bridge approaches, and placing riprap. It also includes bridge cleaning, rail removal, leveling raised sections of a deck, replacing running planks, running plates, curbs and wing wall posts with new bridge timbers. Replace type 3 object markers and posts with new object markers and posts on timber bridges. Remove Type 3 object markers and install Type 2 object markers on concrete bridges. Provide erosion and pollution control measures and all other incidental items necessary to complete the project in accordance with the plans and specifications. Remove existing railings and don’t replace them. The following are the bridge locations (project sites): Leiberg Creek Bridge (812-9.7): From the Coeur d’Alene River Ranger District turn East and travel 5.8 miles on County Road 108. to Fernan Saddle. Continue on Forest Road 268 to the junction of Forest Roads 268 and 612. Continue 10.9 miles on Forest Road 612 to the junction of Forest Roads 612 and 209. Turn right (South) and travel 5.1 miles to the junction of Forest Roads 209 and 422. Turn left (North) and travel 2.3 miles to the junction of Forest Roads 422 and 812 and the bridge location. Big Elk Creek Bridge (422-8.2): From the Leiberg Creek Bridge (812-9.7) travel North on Forest Road 422 for 5.9 miles to the bridge. Tepee Creek Bridges (812-0.03 , 0 .09, 1.9): From the Big Elk Creek Bridge (422-8.2) travel North 1.6 miles to the junction of Forest Roads 422 and 812. Turn right (East) and travel 0.03, 0.09 and 1.9 miles to the bridge locations. Halsey Creek Bridge (1514-0.1): From the junction of Forest Roads 422 and 812 travel North 1.7 miles to the junction of Forest Roads 422 and 1514. Turn right (East) and travel 0.1 miles to the bridge. Tepee Creek Bridge (265-0.2): From the junction of Forest Roads 422 and 1514 travel North 1.3 miles to the junction of Forest Roads 422 and 265. Turn right (East) and travel 0.2 miles to the bridge. Trail Creek Bridge (422-13.0): From the junction of Forest Roads 422 and 265 travel North 0.2 miles to the junction of Forest Roads 422, 534, and 6310 and the bridge. Independence Creek Bridge (6310-3.6): From the junction of Forest Roads 422, 534, and 6310 travel North 3.6 miles on Forest Road 6310 to the bridge. The Forest Service intends to issue a solicitation for this project utilizing FAR Part 14 procedures for sealed bidding. This acquisition is 100 percent set-aside for HUBzone Business concerns. A single firm-fixed price type contract will be awarded to the responsible Bidder (IAW FAR Part 9, Contractor Qualifications) whose bid is of the lowest total price that meets the technical requirements outlined in the solicitation. Payment Protection will be required for this project and Davis-Bacon wage rates will apply to any resulting contract. This solicitation will be available on or about August 12, 2009. The period of performance for this project will be from issuance of a Notice to Proceed and to be completed by October 1, 2010; the Notice to Proceed is anticipated to be issued on or about September 15, 2009. All responsible sources may submit a bid which will be considered by the government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:AG-82B1-S-09-0064
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 29, 2009

    Idaho Panhandle NF - Central Zone Bridge Replacements

    Notice 2c0788c3402a3b475425a9ee960526e9 on SAM.gov

  2. SolicitationCurrentAug 19, 2009

    Idaho Panhandle NF - Central Zone Bridge Replacements

    Notice 1233f27d6c68ef10565a5e6d5d7d0d9e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82B1-S-09-0064

Archive Date

Oct 1, 2009

Office Address

Washington, DC, 202500001