GovChime
Notice ID: 4d202f373532e61feb196445430f3d70Award NoticeAwarded

RECOVERY: SILVER CREEK CAMPGROUND CONSTRUCTION, BOISE NF

Awarded on June 21, 2010. Full description on SAM.gov.

Awarded tounder AG-82B1-C-10-0214 (source: SAM.gov award notice)• $1.3M

Overview

Posted
July 9, 2010
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC IM
Place of performance
Boise National Forest, Boise
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Jun 21, 2010
Award amount (SAM.gov award notice)
$1.3M

Identifiers

Solicitation number
AG-82B1-S-10-0234
Notice ID
4d202f373532e61feb196445430f3d70
Award number (PIID)
AG-82B1-C-10-0214

Description

The USDA Forest Service, Boise National Forest, intends to acquire by contract the reconstruction the Silver Creek Campground. This project consists of reconstructing a campground area and two group areas on the Emmett Ranger District on the Boise National Forest. Major items of work include: construction of new campground roads, parking areas and parking spurs; removal and disposal of existing structures; construction of new aggregate surface family units with site furniture; construction of tent pads; construction of new pathways; construction of aggregate and concrete surfaced group areas with tables, fire rings, serving tables and grills; constructing a rockery retaining wall; installation of a new water system including a well, utility building, solar powered submersible pump, tank, distribution lines and hydrants; seeding; and construction of other site features (site identification and traffic control signs, culverts, concrete curb stops, bulletin boards, and fee tubes). The project is located in the Emmett Ranger District of the Boise National Forest, Emmett County, Idaho, in Sections 36, T12N, R5E at the junction of Nation Forest System Road (NFSR) 671, and NFSR 671W1. The Forest Service intends to issue a solicitation for this project utilizing FAR Part 15 procedures for contracting by negotiation. This acquisition is 100 percent set-aside for HUBzone Business concerns. A single firm-fixed price type contract will be awarded to the responsible Offeror (IAW FAR Part 9, Contractor Qualifications) whose proposal is of the overall best value to the Government in accordance with the evaluation factors outlined in the solicitation. Payment Protection will be required for this project and Davis-Bacon wage rates will apply to any resulting contract. This solicitation will be available on or about March 15, 2010. The period of performance for this project will be 180 days from issuance of a Notice to Proceed, which is anticipated to be issued on or about 15 May, 2010. All responsible sources may submit an offer which will be considered by the government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.

Full description on SAM.gov

Award Overview

Award Number

AG-82B1-C-10-0214

Award Amount (SAM.gov award notice)

$1.3M

Award Date

Jun 21, 2010

Awardee

Original Solicitation

Notice ID: 4d202f373532e61feb196445430f3d70

Posted Date: Jul 9, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

douglas lee
CONTRACTING OFFICER

Secondary Contact

JILL CHARPIA
Contracting Specialist

Documents

No documents available.

Lifecycle

Solicitation:AG-82B1-S-10-0234
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 4×
    Pre-SolicitationMar 1, 2010

    **RECOVERY** Silver Creek Campground Construction, Boise NF

    Notice bedf4eb336e36f3986813d05c0487835 on SAM.gov

  2. SolicitationApr 9, 2010

    **RECOVERY** Silver Creek Campground Construction, Boise NF

    Notice f4a5f1a21896419b0bfe302a0547de07 on SAM.gov

  3. AwardedCurrentJul 9, 2010

    RECOVERY: SILVER CREEK CAMPGROUND CONSTRUCTION, BOISE NF

    Notice 4d202f373532e61feb196445430f3d70 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82B1-S-10-0234

Archive Date

Jul 13, 2010