Notice ID: f38c4039ed0cd6cfe6f3fb64313a6ca8Award NoticeAwarded
Replacement Lighting, Canyon WC, Kelly WC & Pierce WC
Awarded on May 18, 2010. Full description on SAM.gov.
Awarded tounder AG-82B1-P-10-0110 (source: SAM.gov award notice)• $56.7K
Overview
- Posted
- August 10, 2010
- Notice type
- Award Notice
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA FOREST SERVICE-SPOC IM
- Place of performance
- See Description Above
- PSC
- F: NATURAL RESOURCES MANAGEMENT
- Last updated
- Dec 5, 2025
- Award date
- May 18, 2010
- Award amount (SAM.gov award notice)
- $56.7K
Identifiers
- Solicitation number
- AG-82B1-S-10-0294
- Notice ID
- f38c4039ed0cd6cfe6f3fb64313a6ca8
- Award number (PIID)
- AG-82B1-P-10-0110
Description
Solicitation added
Award Overview
Award Number
AG-82B1-P-10-0110
Award Amount (SAM.gov award notice)
$56.7K
Award Date
May 18, 2010
Awardee
Original Solicitation
Notice ID: f38c4039ed0cd6cfe6f3fb64313a6ca8
Posted Date: Aug 10, 2010
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-82B1-S-10-0294- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 2×Pre-SolicitationMar 26, 2010
Replacement Lighting, Canyon WC, Kelly WC & Pierce WC
- SolicitationMay 6, 2010
Replacement Lighting, Canyon WC, Kelly WC & Pierce WC
- AwardedCurrentAug 10, 2010
Replacement Lighting, Canyon WC, Kelly WC & Pierce WC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The following are the firms shortlisted for Design Build services for the Carl B. Stokes U.S. Courthouse Fire Alarm Replacement Project in Cleveland, Ohio: Dawn Inc., 2861 Sferra Ave. NW, Warren, OH. 44483 Higley Construction, 3636 Euclid Ave., Cleveland, OH 44115 R.J. Runge Company, Inc., 3539 NE Catawba Rd., Port Clinton, OH 43452 | - | Special Notice | Open |
This requirement is for two air compressor relocations for US Naval Research Laboratory (NRL). The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1905 along with attachments. Your quick response is appreciated to facilitate an award prior to current fiscal year end. A site visit is required before submitting any proposal or quote. The mandatory site visit is scheduled for Wednesday, October 7, at 9:30 am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified in Block 8 of the Standard Form (SF) 1449 will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end. Amendment N0017326Q19050001 provides photos of the air compressors data plate information. Amendment N0017326Q19050002 includes an additional site visit and extends RFQ response date. Amendment N0017326Q19050003 removes the small business set aside, includes a site visit and extends RFQ response date. Amendment N0017326Q19050004 provides additional photos, drawings, Government responses to questions received, and extends RFQ response date. Amendment N0017326Q19050005 provides Government response to an additional question received. Amendment N0017326Q19050006 extends RFQ response date to 11/04/2026 @ 2:00pm EST. | - | Combined Synopsis | 11/04/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE: This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS CODE: 238210 Electrical Contractors and Other Wiring Installation Contractors SMALL BUSINESS STANDARD: $19,000,000.00 NOTE: While Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The 11th Contracting Squadron (11 CONS), District of Washington, has a requirement to execute the design-build upgrades, repairs, and/or replacements to the deteriorated Electrical Switching Stations located at B18 and B168 on Joint Base Anacostia Bolling (JBAB) that includes developing a solution to establish a connection by high voltage electrical redundancy cable. The Government is evaluating the feasibility of executing these requirements via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. This project summary establishes the operational requirements, technical baseline, and acquisition framework for the Progressive Design-Build (PDB) Other Transaction Authority (OTA) effort to modernize Joint Base Anacostia-Bolling’s (JBAB) primary electrical infrastructure. Project Title JBAB Electrical Switching Stations (ESS B18 & B168) Modernization & Grid Redundancy Location Joint Base Anacostia-Bolling (JBAB), 11th Wing Acquisition Strategy Progressive Design-Build (PDB) via Other Transaction Authority (OTA) Primary Objective Engineer comprehensive design packages to repair, upgrade, and interconnect deteriorated electrical switching infrastructure Primary Deliverables 100% executable design packages, specifications, and implementation schedules for ESS upgrades, facility hardening, cable routing, and smart-grid wireless SCADA/telemetry Scope Breakdown by Facility & Component ESS B18 (Switching Station Upgrade) • Full replacement of legacy switchgear with FR3 fluid, air-insulated switchgear (per latest UFC 3-550-01) • Life-cycle cost and sustainability integration (UFC 1-200-02) • Thermal partition separating switchgear room from power generation bay • Dedicated HVAC system and air conditioning ductwork • Sized space heating units • High-efficiency interior LED lighting ESS B168 (Repair, Upgrade & Hardening) • Complete switchgear replacement mirroring ESS B168b using FR3 air-insulated switchgear (UFC 3-550-01) • Sustainable design practices (UFC 1-200-02) • Dedicated single HVAC unit and duct system • Interior/exterior high-efficiency LED flood/task lighting • Raised roof profile with comprehensive crack sealing/insulation • Foundation pillar repairs, crawl space waterproofing, and rainwater gutter system • Motorized roll-up door, cyber/physical cypher-locked access doors, and motorized loading dock ramp with widened sidewalk High-Voltage Redundancy Cables • Design 4-circuit bidirectional interconnect (8 cables total) connecting ESS B18 and ESS B168 • Baseline routing derived from 2025 Engineering Study • Mandatory underground routing preference across base footprint • Aerial routing permitted strictly as secondary exception where subsurface obstructions prevent underground installation Wireless SCADA & Grid Telemetry • Air Force long-term smart-grid wireless connectivity architecture • Cell-enabled control panels reporting directly to electric shop web interface without physical comm trunk lines • Relay-to-control panel comm wiring for ESS B18 and ESS B168 • Additional telemetry control panel integrated into ESS B4505 (sub-station to B18) to monitor sub-station power load profiles Key Technical Standards & Compliance Baseline UFC 3-550-01 Exterior Electrical Power Distribution Mandates modern FR3 biodegradable, fire-resistant fluid dielectric air-insulated switchgears, significantly mitigating environmental and thermal hazards. UFC 1-200-02 High Performance and Sustainable Building Requirements Governs energy efficiency, life-cycle cost effectiveness, indoor environmental quality, and durable materials integration. PDB / OTA Authority Prototype / Collaboration Framework Fosters early contractor involvement during Phase 1 design, mitigating unforeseen site and subsurface risk prior to Phase 2 construction commitment. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy: Company Profile: Q1. Business Name Q2. Address Q3. Point of Contract (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. Cage Code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Statutory Compliance: Q10. OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. Q11. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Progressive Design-Build (PDB) / Early Contractor Involvement: Q12. What minimum level of detail (e.g., Statement of Need, conceptual site plans, target budget) does your firm require prior to entering Phase 1 (Design/Pre-construction) to feel confident in the project's viability? Q13. What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days to rapidly transition from a "blank page" to a mutually agreed-upon baseline? Q14. Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Feedback on the Acquisition Strategy & Alternatives: Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? Bonding Capability: Q17. Specify your maximum bonding (single and aggregate) as a sole prime contractor and/or as a joint venture. SUBMISSION INSTRUCTIONS: Please submit your responses by 30 November 2026 at 1000 Eastern Standard Time (EST) to Mr. Terry Agena at terry.agena.1@us.af.mil and MSgt Quortez Dorsey quortez.dorsey@us.af.mil. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | - | Market Research | 11/30/2026 |
Ameendment 0001 -Removal of Abandoned Telecommunications Equipment | - | Solicitation | 10/23/2026 |
The U.S. Department of State, Bureau of Overseas Buildings Operations (OBO), plans to award an Indefinite Delivery Indefinite Quantity (IDIQ) contract to replace and repair fire alarm systems at U.S. Embassies, Consulates, Missions and Branch Offices worldwide. The Department has more than 268 diplomatic facilities that must keep operating during emergencies and crises, and about 120 of their fire alarm systems have passed their end of life and no longer have manufacturer support. Under individual task orders, the contractor will remove existing equipment, furnish, install, program and test new fire alarm systems, perform repairs, and deliver fire alarm materials to overseas sites, including remote and high-threat locations. | - | Market Research | 10/23/2026 |
Additional Details
Solicitation Number
AG-82B1-S-10-0294
Archive Date
Jun 29, 2019