Notice ID: 4c59c0cf2a9d1735a5c02786249a928eAward NoticeAwarded

RECOVERY � LOLO PASS VISITOR CENTER DEFERRED MAINTENANCE REDUCTION, CLEARWATER NATIONAL FOREST, OROFINO, ID

Awarded on September 10, 2010. Full description on SAM.gov.

Awarded tounder AG-82B1-C-10-0378 (source: SAM.gov award notice)• $712.4K

Overview

Posted
September 10, 2010
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC IM
Place of performance
CLEARWATER NATIONAL FOREST 12730 HIGWAY 12 , Orofino, 83544
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Sep 10, 2010
Award amount (SAM.gov award notice)
$712.4K

Identifiers

Solicitation number
AG-82B1-S-10-0407
Notice ID
4c59c0cf2a9d1735a5c02786249a928e
Award number (PIID)
AG-82B1-C-10-0378

Description

THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT. The resulting contract will utilize funds provided by the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009. Interested parties are notified that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be required of the successful proposal. The purpose of this announcement is to make notice that the Forest Service is releasing a Request for Proposal numbered AG-82B1-S-10-0407, for the RECOVERY Lolo Pass Visitor Center Deferred Maintenance Reduction. This requirement is being solicited as a Request for Proposal (RFP) under FAR Part 15. Proposals or offers are due at August 27, 2010; 5:00 P.M. Mountain Time. A single firm-fixed price type contract will be awarded to the responsible offeror based upon price and other evaluation factors as stated in the soliciation(IAW FAR Part 9, Contractor Qualifications) ALL PROPOSALS SHOULD BE MAILED TO: USDA/FOREST SERVICES ATTN: PHYLLIS R. COBURN-HARRIEL 740 SIMMS ST GOLDEN, CO 80401 PROJECT DESCRIPTION. The project consists of a structural upgrade / repair and miscellaneous repairs to the existing 3360 s.f. visitor center and the adjacent 880 s.f. warming hut. Ten years after completion, the log structure has undergone unacceptable levels of settlement and shrinkage. Work will also include repairs to the existing residence, 2 small storage buildings and the construction of a new storage building. Project work includes but is not limited to : structural work and upgrade of the existing Visitor Center (Building A ), Structural work and upgrade of the existing Warming Hut (Building B ), new log construction of Storage Building (Building C ), porch repair of existing mud creek cabin residence (Building D ). Repairs and roof upgrades to existing storage buildings (Building E & Building F ). The buildings must be protected from leakage and exposure to the weather during removal of the existing roof and completion of the new roof. New concrete logs will replace existing weathered sign structures. Existing site and parking lot lighting will be retrofitted with LED fixtures. Contractor shall remove, store, protect and reinstall all interpretive signage. The Contractor shall provide all materials and labor necessary to complete the work in a professional workman like manner and in accordance with attached specifications and drawings. Final cleanup shall be considered incidental to the work. The magnitude of this project IAW FAR 36.204 (e) is between $500,000 and $1,000,000. ADDED AUGUST 4, 2010: A PRE-BID MEETING HAS BEEN SCHEDULED FOR AUGUST 16, 2010 AT 10:00 AM MOUNTAIN STANDARD TIME (9:00 AM PACIFIC STANDARD TIME - LOCAL TIME AT LOLO PASS. THE PRE-BID MEETING WILL BE HELD AT THE SITE. PLEASE E-MAIL PHYLLIS HARRIEL PRHARRIEL@FS.FED.US TO CONFIRM ATTENDANCE - PLEASE SUBMIT ALL QUESTIONS IN WRITING TO ALLOW THE ENGINEERS THE OPPORTUNITY TO RESPOND PRIOR TO MEETING. ALL QUESTIONS ARE DUE NLT AUGUST 10, 2010 AT 4:30 PM. The recommended contract length is 365 days. Performance and Payments will be required per the Miller Act and Davis-Bacon wage rates will apply. PROJECT LOCATION. Project work is located at Lolo Pass Recreation Area, Idaho County, Idaho, in the Clearwater National Forest. Lolo Pass Recreation Area is located approximately 130 miles east of Orofino, Idaho. From Orofino, Idaho travel approximately 130 miles east via Highway 12 to Lolo Pass, Idaho. Lolo Pass is approximately at milepost 174 on Highway 12. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the Central Contractor Registration (CCR) http:www.ccr.gov or call 888-227-2423 or 269-961-5757 and shall complete the On-Line Registration and Certifications Application (ORCA) http://orca.bpn.gov. All responsible sources may submit a response to this announcement which will be considered by this agency.

Full description on SAM.gov

Award Overview

Award Number

AG-82B1-C-10-0378

Award Amount (SAM.gov award notice)

$712.4K

Award Date

Sep 10, 2010

Awardee

Original Solicitation

Notice ID: 4c59c0cf2a9d1735a5c02786249a928e

Posted Date: Sep 10, 2010

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Phyllis R. Coburn-Harriel
Contract Specialist

Secondary Contact

Susan Graves
Contracting Officer Representative

Documents

No documents available.

Lifecycle

Solicitation:AG-82B1-S-10-0407
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationJul 7, 2010

    RECOVERY � LOLO PASS VISITOR CENTER DEFERRED MAINTENANCE REDUCTION, CLEARWATER NATIONAL FOREST, OROFINO, ID

    Notice 97cea0bcadd472ce79e3d5b4ca5d9ac6 on SAM.gov

  2. SolicitationAug 20, 2010

    RECOVERY � LOLO PASS VISITOR CENTER DEFERRED MAINTENANCE REDUCTION, CLEARWATER NATIONAL FOREST, OROFINO, ID

    Notice 503e63154776c8e514d5620c46d64631 on SAM.gov

  3. AwardedCurrentSep 10, 2010

    RECOVERY � LOLO PASS VISITOR CENTER DEFERRED MAINTENANCE REDUCTION, CLEARWATER NATIONAL FOREST, OROFINO, ID

    Notice 4c59c0cf2a9d1735a5c02786249a928e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82B1-S-10-0407

Archive Date

Sep 25, 2010