Notice ID: c6957ab5411eac0a08ab01d21e2620b2Solicitation
"Fabricated" Culvert for the Upper Last Chance Creek
Archived on August 30, 2013. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 AM UTC+02:00
- Posted
- June 14, 2013
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 332313: Plate Work Manufacturing
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- White River National Forest
- Place of performance
- White River National Forest Airport Shop 1168 County Road 116 , Glenwood Springs, 81601
- PSC
- 54: PREFAB STRUCTURES/SCAFFOLDING
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- AG-82D7-S-13-0010
- Notice ID
- c6957ab5411eac0a08ab01d21e2620b2
Description
Description/Specifications C.1 Project Description: Please provide a bid for the manufacturing and delivery of: Aluminum Box Culvert Span: 17' - 9" Rise: 3' - 10" Length: 35' - 0" Foundation type for a grouted keyway Square end inlet and outlet end treatment C.2 Delivery Location: DELIVERY: Fabricated culvert shall be delivered FOB Destination to White River National Forest: Airport Shop 1168 County Road 116 Glenwood Springs, CO 81601 The Government will unload the culvert. The Contractor shall provide 72 hour notice of delivery date to the Contracting Officer's Representative (COR). C.3 General Specifications: The culvert shall be designed to conform to the requirements of the AASHTO Standard Specifications for Highway Bridges. The aluminum box culvert shall consist of plates, ribs, and appurtenant items as needed to comply with loading as specified and shall conform to the requirements of ASTM B 864. The structure shall be manufactured to connect to a slotted pre-cast footer grouted with non-shrink grout as recommended by the structure manufacturer. The box culvert shall be designed for an HS-25 wheel load with a minimum allowable height of cover of 1.4 feet. The manufacturer shall provide an electronic copy of the following information to the Contracting Officer's Representative (COR) seven (7) days after award of contract: a. Certification that all materials meet the specifications b. Shop drawings, to be approved by the Forest Service c. Assembly and installation instructions
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-82D7-S-13-0010- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 14, 2013
"Fabricated" Culvert for the Upper Last Chance Creek
- SolicitationCurrentJun 14, 2013
"Fabricated" Culvert for the Upper Last Chance Creek
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-82D7-S-13-0010
Archive Date
Aug 30, 2013