GovChime
Notice ID: 246d935860a1a8cb94cf548ef1be142bCombined Synopsis/Solicitation

2017 White River National Forest Bridge Maintenance

Archived on November 21, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 AM UTC+02:00
Posted
June 16, 2017
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
White River National Forest
Place of performance
White River National Forest, Glenwood Springs, 81601
PSC
F: NATURAL RESOURCES MANAGEMENT
Last updated
Dec 5, 2025

Identifiers

Solicitation number
AG-82D7-S-17-0026
Notice ID
246d935860a1a8cb94cf548ef1be142b

Description

Change to COR: Steve J Hunter sjhunter@fs.fed.us 970-945-3308 ************************************************************* This project involves maintenance activities at three separate road bridges on the White River National Forest as described below: 1. Lincoln Creek #1 (CR 23.1, MP 0.10) a. Soil erosion and pollution control (including sediment control) work, to prevent pollutants, debris and sediment form entering the stream channel during deck cleaning and riprap placement work. b. 15 Cubic yards of riprap placement for abutment and bank protection. Riprap placement may be directed by the COR. 75% of material shall be 24" (inch) in size. Minor excavation and ground preparation is incidental to riprap placement. Material is government furnished from borrow source on Highway 82, See Map Location Below in Section C-2. c. Bridge deck cleaning. Sweep by hand or utilize mechanical methods. No debris shall be discharged into the stream channel or any waterbody. Waste material at least 100' (feet) from stream channel or any waterbodies. d. Seeding and mulching of all disturbed areas used to access the river bank. e. Temporary traffic control. 2. Rocky Fork (NFSR 105.6C, MP 0.00) a. Soil erosion and pollution control (including sediment control) work, to prevent pollutants, debris and sediment form entering the stream channel during deck cleaning work. b. 100 CY of surface rock placement on road approaches, compact with hauling and spreading equipment. CDOT Class 6, commercial source. c. Bridge deck cleaning. Sweep by hand or utilize mechanical methods. No debris shall be discharged into the stream channel or any waterbody. Waste material at least 100' (feet) from stream channel or any waterbodies. d. Temporary traffic control. 3. Horseshoe Bend (NFSR 105.4A, MP 0.84) a. Documentation of soil erosion and pollution control (including sediment control) protective measures at this site is required in the plan. Erosion and sediment control work at the project site may be required, but is unlikely because deck cleaning or excavation near the stream channel is not being conducted at this location. b. 20 CY of surface rock placement on road approaches, compact with hauling and spreading equipment. CDOT Class 6, commercial source. c. Removal of four (4) existing "Type 3 object marker" signs from existing fiberglass posts, and installing those object markers on new 4x4 treated wood post. Location of new sign posts to be marked on the ground or directed by COR. This work includes digging holes, setting the new posts, and removing and disposing of the existing fiberglass posts legally off of National Forest Lands. d. Removal of two (2) existing "Weight Limit" signs from their existing wood posts, and installing those weight limit signs on new 4x4 treated wood posts. Location of new sign posts to be marked on the ground or directed by COR. This work includes digging holes, setting the new posts, and removing and disposing of the existing wood posts legally off of National Forest Lands. e. Temporary traffic control.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Lonnie D Root
Contracting Officer

Secondary Contact

Steve J. Hunter
Contracting Officer Representative

Documents

No documents available.

Lifecycle

Solicitation:AG-82D7-S-17-0026
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentJun 16, 2017

    2017 White River National Forest Bridge Maintenance

    Notice 246d935860a1a8cb94cf548ef1be142b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82D7-S-17-0026

Archive Date

Nov 21, 2017