GovChime
Notice ID: 4e5715a71919ead306dd52bc614b914fAward NoticeAwarded

Pringle Falls Electric Upgrade

Awarded on September 13, 2017. Full description on SAM.gov.

Awarded tounder AG-82FT-C-17-0019 (source: SAM.gov award notice)• $9.0K

Overview

Posted
September 13, 2017
Notice type
Award Notice
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
ROCKY MTN RESEARCH STATION
Place of performance
La Pine
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025
Award date
Sep 13, 2017
Award amount (SAM.gov award notice)
$9.0K

Identifiers

Solicitation number
AG-82FT-S-17-0020
Notice ID
4e5715a71919ead306dd52bc614b914f
Award number (PIID)
AG-82FT-C-17-0019

Description

The Contractor shall pull the existing #10 wire out of the one inch conduit from the MDP Meter/Panel to the Garage Panel and save the exist ground wire for future use . The Contractor shall remove the existing panel and mark the existing circuit wires to relocate into the new panel. The Contractor shall provide and install one new 60 Amp Panel with Main Breaker (Square D Model # QO48M60DSGP or similar model) with six 20 Amp breakers to replace the existing 30 Amp fused panel in the Garage. The Contractor shall install approximately 100 feet of new, #6 Cu, THHN/THWN wire, the existing #10 ground wire from the MDP Meter/Panel to the Garage maybe reused. Reattach the old circuits to the new panel in the Garage and add (3) new GFI circuits with two outlets (12 Gauge wire run to each outlet) on each circuit according to current NEC and State of Oregon Electrical Code. Ground the new panel according to NEC to the existing Ground Rods and test all circuits after completing installation. The allotted time for this contract is 30 days from the notice to proceed. Pre-proposal Site Visit - Upon Request. Location: Head Northeast on Highway 97 toward Bend, Oregon for approximately 2.6 miles. Turn left at Burgess Road Loop and proceed for approximately 7.6 miles. Turn left into the second driveway approximately 1/8 mile pass the Deschutes River into Pringle Falls Experimental Forest Headquarters driveway. The magnitude of this project is less than $25,000. This acquisition is 100% set-aside for Small Business concerns under NAICS Code 238210. Offerors shall submit all questions in writing by August 16, 2017. Questions shall be sent to asalas@fs.fed.us. Submit your proposal electronically to asalas@fs.fed.us, no later than August 23, 2017 11:00am MT.

Full description on SAM.gov

Award Overview

Award Number

AG-82FT-C-17-0019

Award Amount (SAM.gov award notice)

$9.0K

Award Date

Sep 13, 2017

Awardee

Awardee UEI

KV97USJBNU23

Original Solicitation

Notice ID: 4e5715a71919ead306dd52bc614b914f

Posted Date: Sep 13, 2017

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Anthony O Salas
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:AG-82FT-S-17-0020
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. Combined SynopsisAug 2, 2017

    Pringle Falls Electric Upgrade

    Notice 06bf2e117f12103f074e953a77a4f4ad on SAM.gov

  2. AwardedCurrentSep 13, 2017

    Pringle Falls Electric Upgrade

    Notice 4e5715a71919ead306dd52bc614b914f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82FT-S-17-0020

Archive Date

Jul 16, 2019