Notice ID: 4e5715a71919ead306dd52bc614b914fAward NoticeAwarded
Pringle Falls Electric Upgrade
Awarded on September 13, 2017. Full description on SAM.gov.
Awarded tounder AG-82FT-C-17-0019 (source: SAM.gov award notice)• $9.0K
Overview
- Posted
- September 13, 2017
- Notice type
- Award Notice
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- ROCKY MTN RESEARCH STATION
- Place of performance
- La Pine
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Sep 13, 2017
- Award amount (SAM.gov award notice)
- $9.0K
Identifiers
- Solicitation number
- AG-82FT-S-17-0020
- Notice ID
- 4e5715a71919ead306dd52bc614b914f
- Award number (PIID)
- AG-82FT-C-17-0019
Description
The Contractor shall pull the existing #10 wire out of the one inch conduit from the MDP Meter/Panel to the Garage Panel and save the exist ground wire for future use . The Contractor shall remove the existing panel and mark the existing circuit wires to relocate into the new panel. The Contractor shall provide and install one new 60 Amp Panel with Main Breaker (Square D Model # QO48M60DSGP or similar model) with six 20 Amp breakers to replace the existing 30 Amp fused panel in the Garage. The Contractor shall install approximately 100 feet of new, #6 Cu, THHN/THWN wire, the existing #10 ground wire from the MDP Meter/Panel to the Garage maybe reused. Reattach the old circuits to the new panel in the Garage and add (3) new GFI circuits with two outlets (12 Gauge wire run to each outlet) on each circuit according to current NEC and State of Oregon Electrical Code. Ground the new panel according to NEC to the existing Ground Rods and test all circuits after completing installation. The allotted time for this contract is 30 days from the notice to proceed. Pre-proposal Site Visit - Upon Request. Location: Head Northeast on Highway 97 toward Bend, Oregon for approximately 2.6 miles. Turn left at Burgess Road Loop and proceed for approximately 7.6 miles. Turn left into the second driveway approximately 1/8 mile pass the Deschutes River into Pringle Falls Experimental Forest Headquarters driveway. The magnitude of this project is less than $25,000. This acquisition is 100% set-aside for Small Business concerns under NAICS Code 238210. Offerors shall submit all questions in writing by August 16, 2017. Questions shall be sent to asalas@fs.fed.us. Submit your proposal electronically to asalas@fs.fed.us, no later than August 23, 2017 11:00am MT.
Award Overview
Award Number
AG-82FT-C-17-0019
Award Amount (SAM.gov award notice)
$9.0K
Award Date
Sep 13, 2017
Awardee
Awardee UEI
KV97USJBNU23
Original Solicitation
Notice ID: 4e5715a71919ead306dd52bc614b914f
Posted Date: Sep 13, 2017
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Anthony O Salas
Contracting Officer
Documents
No documents available.
Lifecycle
Solicitation:
AG-82FT-S-17-0020- Combined Synopsis
- Awarded
This opportunity has been awarded.
- Combined SynopsisAug 2, 2017
Pringle Falls Electric Upgrade
- AwardedCurrentSep 13, 2017
Pringle Falls Electric Upgrade
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-82FT-S-17-0020
Archive Date
Jul 16, 2019