GovChime
Notice ID: c37b522ff77ae78908b41a1ea91bf021Solicitation

Stillwater Slump Repair

Archived on September 11, 2008. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−05:00
Posted
June 27, 2008
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Rocky Mountain Regional Office
Place of performance
This project is located on the Arapaho Roosevelt National Forest, Sulphur Ranger District located in Grand County, Colorado. Directions to the project site: from Granby, Colorado travel north along State Highway 40 approximately one mile to the intersection with State Highway 34. Then travel north along 34 approximately nine miles to the intersection with NFSR 125 (Stillwater Pass Road/Grand County Road 4) then west approximately seven miles to the road slump area., GRANBY, 80549
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
AG-82X9-S-08-0212
Notice ID
c37b522ff77ae78908b41a1ea91bf021

Description

Solicitation AG-82X9-S-08-0212 is for the Stillwater Pass Road slump repair project. A section of NFSR 123 Stillwater Pass road has failed (loss of road shoulder) and has restricted the width of this two lane gravel road to one lane for about 0.1 miles. The work required includes the reconstruction of approximately 0.1 miles of the road with a deep french drain installed on the upside of the road. Work items include, but are not limited to; removal of existing soil nails, excavation and embankment, aggregate base, traffic control, temporary erosion control, french drain construction, trenching, geotextiles, rip rap, culvert installation, clay linears, and hydroseeding. This project is located on the Arapaho Roosevelt National Forest, Sulphur Ranger District located in Grand County, Colorado. Directions to the project site: from Granby, Colorado travel north along State Highway 40 approximately one mile to the intersection with State Highway 34. Then travel north along 34 approximately nine miles to the intersection with NFSR 125 (Stillwater Pass Road/Grand County Road 4) then west approximately seven miles to the road slump area. The project time for this project is 90 days. Work will begin as soon as practicable after award. The Government estimate for this project is between $100,000 and $250,000. This solicitation will be posted to www.fbo.gov on or around June 24, 2008. The solicitation will be available for download at no cost at this website. Proposals will be due approximately 30 days after the solicitation is issued. There will be a site visit for this project conducted on July 10, 2008, 10:00 local time. The site visit will be hosted at the Arapaho Roosevelt National Forest Sulphur Ranger District Office located at 9 Ten Mile Drive, Granby, Colorado. If you plan to attend the site visit, you must RSVP by calling Christina A. Schofield at 970-295-6635 before close of business on July 8, 2008. Attendance is not required to submit a proposal. All questions pertaining to this solicitation must be submitted in writing to cschofield@fs.fed.us or via facsimile to 970-295-6699. Only written questions will be addressed. All Offerors must be registered in the Central Contractor’s Registry (CCR) in accordance with FAR 52.207-4 to be considered for award. All Offerors must be registered in ORCA in accordance with FAR 52.204-8 to be considered for award.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Christina A Schofield
Contracting Officer
Fax: 970--295-6699

Secondary Contact

Julie Major
Procurement Technician
Fax: 970-295-6699

Documents

No documents available.

Lifecycle

Solicitation:AG-82X9-S-08-0212
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJun 27, 2008

    Stillwater Slump Repair

    Notice 9c18bb8b65bc722f86a6b94cbf1b42d0 on SAM.gov

  2. SolicitationCurrentJun 27, 2008

    Stillwater Slump Repair

    Notice c37b522ff77ae78908b41a1ea91bf021 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-82X9-S-08-0212

Archive Date

Sep 11, 2008

Office Address

LAKEWOOD, CO, 80401