Notice ID: 2d4b98af7edb576681ca247db55403dcAward NoticeAwarded
Lake George Work Center Office Expansion
Awarded on June 10, 2015. Full description on SAM.gov.
Awarded tounder AG-82X9-C-15-0011 (source: SAM.gov award notice)• $316.2K
Overview
- Posted
- June 10, 2015
- Notice type
- Award Notice
- NAICS
- 236210: Industrial Building Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Rocky Mountain Regional Office
- Place of performance
- Lake George Work Center, 140 Trail Creak Road, Lake George, 80827
- PSC
- 56: CONSTRUCTION AND BUILDING MATERIAL
- Last updated
- Dec 5, 2025
- Award date
- Jun 10, 2015
- Award amount (SAM.gov award notice)
- $316.2K
Identifiers
- Solicitation number
- AG-82X9-S-15-0006
- Notice ID
- 2d4b98af7edb576681ca247db55403dc
- Award number (PIID)
- AG-82X9-C-15-0011
Description
SYNOPSIS This project is located on the Pike and San Isabel National Forest and Cimarron and Comanche National Grasslands at the South Park Ranger District, Lake George Work Center. The Work Center is approximately 35 miles West of Colorado Springs, Colorada at 140 Trail Creak Road, Lake George, CO 80827. The Lake George Work Center is the duty station for six permanent and typically eight to ten fire and fuel seasonal employees. The Work Center Office is a one floor building located at grade, is a 1.300 square foot long building on a stone foundation constructed in 1939 by the Civilian Conservation Corps. The intent of the contract is to provide for the complete construction of the project as described in the contract. The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete work identified in Division 1 Specifications, "Definition of Contract Items and Measurements and Payments". The project will expand the Lake George Work Center Office to provide two accessible restrooms and additional entry space. The building addition will extend the Eastern gable end of the office to the East and into the current site access road. The road will be shifted to the east to accommodate the expansion. The site has several features of historic and/or archaeological significance. A Forest Service provided archaeologist will be onsite during excavation phases of this project to observe and record any findings. Solicitation with Specifications and Drawings will be added to this combined Synopsis/Solicitation as soon as they are avaliable. *** ALL INQUIRES MUST BE SUBMITTED ELECTRONICALLY (VIA E-MAIL). *** As per FAR 36.204 Disclosure of the Magnitude of Construction Projects. The estimated ranges for this project is between $250,000 - $500,000.
Award Overview
Award Number
AG-82X9-C-15-0011
Award Amount (SAM.gov award notice)
$316.2K
Award Date
Jun 10, 2015
Awardee
Awardee UEI
RJPGM3TDAK78
Original Solicitation
Notice ID: 2d4b98af7edb576681ca247db55403dc
Posted Date: Jun 10, 2015
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Thomas C Fuller
Supervisor Contracting Officer/Team Lead
Fax: 303-275-5453
Documents
No documents available.
Lifecycle
Solicitation:
AG-82X9-S-15-0006- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 9×Combined SynopsisMar 11, 2015
Lake George Work Center Office Expansion
- AwardedCurrentJun 10, 2015
Lake George Work Center Office Expansion
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-82X9-S-15-0006
Archive Date
Sep 21, 2015