GovChime
Notice ID: 845d4726f2ce9be8294dd9f74594fd48Solicitation

RECOVERY - Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County

Archived on November 16, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 PM UTC+01:00
Posted
November 5, 2009
Notice type
Solicitation
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE-SPOC SW
Place of performance
Region 5. Lake Tahoe Basin Mgmt Unit, Supervisor's Office 35 College Drive , South Lake Tahoe, 96150
PSC
38: CONSTRUCT/MINE/EXCAVATE/HIGHWY EQPT
Last updated
Dec 5, 2025

Identifiers

Solicitation number
AG-9702-S-09-0035
Notice ID
845d4726f2ce9be8294dd9f74594fd48

Description

Description: THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) ACTION. The U.S. Forest Service, EROC SW region has a requirement for maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County. Work includes a single layer chip seal with associated hand patching and brushing to prepare the road surface. Also included are traffic control items needed to maintain public traffic while work progresses. LOCATION From the intersection of Hwy 28 and Hwy 267, travel 3.2 miles North on Hwy 267 to Mt Watson Blvd. (Left Side). At the gate is the beginning of the project. Continue on Mt Watson for 10.75 miles to the end of existing chip seal. This is the end of the project. GOALS AND OBJECTIVES The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, equipment and materials to complete the project on time and on schedule. Contractor shall comply with contract requirements with regards to work and materials. The period of performance is 30 calendar days after receipt of notice to proceed. Along with the Requirements and Responsibilities identified in this document, the Contractor shall provide project administration services to include the following: • Consultation with the Government regarding all aspects of the project • Attend pre-bid walk through, pre-construction conference, bi-weekly construction meetings and closeout • Travel • Direction and quality control of in-house personnel and consultants • Coordination and response to Submittals and Requests for Information • Coordination with the local utility companies • Coordination with the local government A negotiated firm-fixed price contract will be awarded requiring submission of both a technical and a price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The none price factors are more important than price. The evaluation factors will be stipulated in the solicitation documents. The estimated construction range of magnitude is between $250,000 and $500,000. The applicable North American Industry Classification System (NAICS) Code is 237310. The small business size standard is $14 million. Contractors are required to be registered with the Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA). This acquisition will be awarded as a Small Business Competitiveness Demonstration Program. The solicitation with specifications and wage rates will be posted to the http://www.fedbizopps.gov on or about October 2, 2009. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the http://www.fedbizopp.gov website. Please provide the requested information no later than October 30, 2009 to: Fred Weatherill Contracting Officer U.S. Forest Service Economic Recovery Operations Center (EROC) SW 1323 Club Drive Vallejo, CA 94592 Email: fweatherill@fs.fed.us

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Alfredo Lansangan
Contract Specialist

Secondary Contact

Fred Weatherill
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:AG-9702-S-09-0035
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationSep 17, 2009

    RECOVERY - Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County

    Notice 474d5d24c75a78ea72126694c2f5eebb on SAM.gov

  2. SolicitationCurrentNov 5, 2009

    RECOVERY - Chip Seal Maintenance of the 73 Road (Mt Watson Boulevard) on the LTBMU in Placer County

    Notice 845d4726f2ce9be8294dd9f74594fd48 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-9702-S-09-0035

Archive Date

Nov 16, 2009