Notice ID: 5d67bdd370eac89636bd126f222a88e2Solicitation
Laguna Water Distribution System
Archived on June 26, 2015. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 AM UTC+02:00
- Posted
- May 12, 2015
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Sierra National Forest
- Place of performance
- Project Site: is located in San Diego County within the Mt. Laguna Recreation area. From San Diego, California, travel east on Interstate 8 for approximately 60 miles to Sunrise Highway (S1). Thence turn left on Sunrise Highway and travel northeast 5 miles to the second gated dirt road named Old County Road.
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- AG-9A40-S-15-0007
- Notice ID
- 5d67bdd370eac89636bd126f222a88e2
Description
This project is located on the Descanso Ranger District of the Cleveland National Forest. Work consists of the design and installation of a water distribution system, as follows: Electrical service, water treatment, pumping and delivery system, electrical control and remote monitoring system and the installation of a potable water tank, waterlines, electrical lines, a control system, road construction, and any other work necessary for the installation of a functioning potable water system. This Design-Build process will have two distinct phases. Phase 1 will be the pre-qualification process, where the Government will select up to three to four contractors on the basis of their qualifications and preliminary proposal(s). Only the selected contractors will then qualify for the Phase 2 process. In Phase 2 of the procurement procedure, Offerors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals. Final selection and basis for award of the Design-Build contract will be qualifications, past experience, technical quality, price, and other salient factors considered to be the best value to the Government. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest priced or the highest technically-ranked. If awarded the contract, the Offeror shall provide and complete all necessary and required design and contraction documents, and complete construction in compliance with these requirements.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
AG-9A40-S-15-0007- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationMar 10, 2015
Laguna Water Distribution System
- SolicitationCurrentMay 12, 2015
Laguna Water Distribution System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
AG-9A40-S-15-0007
Archive Date
Jun 26, 2015