GovChime
Notice ID: f72b0e9bc86c8b7a1ffb9d8f2791351eSolicitation

BIG MEADOWS TRAIL BRIDGE REPLACEMENT

Archived on July 10, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC+02:00
Posted
May 14, 2015
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA FOREST SERVICE
Place of performance
Big Meadow Trailhead Area, Hume Lake Ranger District, Sequoia National Forest/Giant Sequoia National Monument
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
AG-9AB5-S-15-0035
Notice ID
f72b0e9bc86c8b7a1ffb9d8f2791351e

Description

Furnish all labor, equipment and material to accomplish the Work under this contract. Work includes but is not limited to the following: 1. Demolish and remove the old 40' long log stringer trail bridge. 2. Clearing and grubbing of vegetation as required within the clearing limits of the project. 3. Furnish and install a new 60' span steel truss trail bridge with concrete abutments. 4. Construct approximately 60' of timber boardwalk on one approach of the trail bridge. 5. Minor realignment of the trail approaches to the bridge. SPECIAL NOTE: In addition to the sensitive meadow area, a campground and trailhead are located nearby and the successful contractor can expect to encounter numerous public contacts and vehicles nearby and adjacent to the project site during all construction phases. The campground and trailhead will remain open to the public during construction. Project location is in the State of California, County of Tulare, Sequoia National Forest/Giant Sequoia National Monument, Hume Lake Ranger District; at Township 14S Range 29E Section 9; Latitude 36.7168N, Longitude 118.8317W. The Big Meadows trail bridge replacement site is located a few hundred feet from the Big Meadows trailhead off FS Road 14S11 Horse Corral road. From Fresno, CA follow State Highway 180 east through Squaw Valley and past the Big Stump entrance station into Kings Canyon National Park. Approximately 2 miles past the entrance station, turn right on the General's Highway for approximately 8 miles, then left on FSR 14S11 for approximately 5 miles to Big Meadows Trailhead on the right. The price range of this project is between $100,000 and $250,000. A Mandatory Pre-Bid Tour will be conducted. Since the location is currently inaccessible, the date and time for the pre-bid will be included in the solicitation. Once the date and time is established offerors will meet at the Big Meadows Trailhead to go over the job site and associated work. Contractors shall notify the Contracting Officer of their intent to attend the pre-bid tour. The pre-bid tour will be mandatory due to the sensitive riparian and meadow areas, and the need to review site access. Contract time is 150 calendar days. Issue date for the solicitation is approximately March 23, 2015 with a closing date of approximately May 6, 2015. This project is 100% set aside for small business.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Nancy L. Ruggeri
Contracting Officer
Fax: 559788 0188

Documents

No documents available.

Lifecycle

Solicitation:AG-9AB5-S-15-0035
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationFeb 24, 2015

    BIG MEADOWS TRAIL BRIDGE REPLACEMENT

    Notice 7008339eea922dca9f61d47a452140e2 on SAM.gov

  2. SolicitationCurrentMay 14, 2015

    BIG MEADOWS TRAIL BRIDGE REPLACEMENT

    Notice f72b0e9bc86c8b7a1ffb9d8f2791351e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-9AB5-S-15-0035

Archive Date

Jul 10, 2019