GovChime
Notice ID: 8bd25543901139c3fb17e1238c067969Award NoticeAwarded

Stony Quarry Aggregate Crushing

Awarded on July 25, 2016. Full description on SAM.gov.

Awarded tounder AG-9JGP-C-16-0106 (source: SAM.gov award notice)• $269.5K

Overview

Posted
July 26, 2016
Notice type
Award Notice
NAICS
212321: Construction Sand and Gravel Mining
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Tahoe National Forest
Place of performance
Mt Hough Ranger District 39696 CA Highway 70, Quincy, 95971
PSC
56: CONSTRUCTION AND BUILDING MATERIAL
Last updated
Dec 5, 2025
Award date
Jul 25, 2016
Award amount (SAM.gov award notice)
$269.5K

Identifiers

Solicitation number
AG-9JGP-S-16-0122
Notice ID
8bd25543901139c3fb17e1238c067969
Award number (PIID)
AG-9JGP-C-16-0106

Description

Combined Solicitation & Synopsis AG-9JGP-S-16-0122 The Department of Agriculture, US Forest Service, Central California Acquisition Services Area, Plumas National Forest requires services for Pit development and site reclamation, crush and stockpile Aggregate product from the Stony Quarry located on the Beckwourth Ranger District. This is a combined / solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. It is the contractor's responsibility to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://acquisition.gov/far. This is solicitation no.AG-9JGP-S-16-0122, a Request for Quotations (RFQ) and is a 100% Total Small Business Set-Aside. The NAICS code is 212321 Support Activities for Forestry. The size requirement for this NAICS code is 500 employees. The government intends to award a Firm Fixed Price Contract. Closing date of Solicitation is: July 5, 2016: 3:00 PM PST. Projected Award Date is: July 7, 2016 B.1 ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1 Mobilization LSQ 1. $______________ $_____________ 2 Pit Development LSQ 1. $______________ $_____________ & Reclamation 3 Crush & Stockpile CY 22,000 $_____________ $_____________ Aggregate Surface Course, 1-inch minus gradation AS PER THE GENERAL SPECIFICATIONS IN ATTACHMENT 1 AND THE FOLLOWING ADDITIONAL REQUIREMENTS: This is a commercial test item. Contractor Responsibility: Except as otherwise specified under 1.2 and 1.4, the contractor shall furnish the necessary personnel, supplies and transportation to perform the services and insure that the designated areas present a clean, healthy, orderly and well-kept appearance. Estimated Start Date & Contract Time: Date/Time Start July 11,2016 Contract Time 120 days Licenses & Insurance The contractor shall obtain the insurance and licenses listed here; (see also Section L, Notices to Offerors and Respondents). Other: Worker's Compensation Insurance: The Contactor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance. DESCRIPTION OF WORK: 1. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) (APR 1984) The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than July 11, 2016. Work is estimated to begin July 11, 2016. 1 DESCRIPTION OF WORK Furnish all labor, equipment, and materials, to accomplish the Work under this Supply contract. Services consist mainly of the extraction of material from previously exposed quarry slopes, then crushing it into the aggregate surface course, meeting the gradation provided in the specifications, and as Specified by the Schedule of Items. Work includes but is not limited to the following major items: o Production of the specified aggregate surface course gradation from extracted material source shown on drawings; includes the stockpiling of aggregates at sites designated by the drawings, also submittal of required quality control tests for the produced materials. o Pit development of the quarry includes removal of weed-contaminated soil prior to all other work, then stockpiling it at area designated by drawings, removal of overburden from extraction area shown on drawings, consolidation of existing stockpiles for each gradation prior to stockpiling new crushed aggregate. o Site Reclamation is part of the pit development after completion of aggregate crushing and stockpiling operations. Excavated slopes will be pulled down and stabilized as required by the drawings, also meeting OSHA and MSHA requirements for open pit mines. All disturbed areas will be sloped to drain and re-contoured to the line and grades shown on the drawings. o Submittals of a Traffic Control Plan, Project Quality Control Plan, Proposed Project Schedule, All Required Permits, Licenses, and Certifications for review and approval. The Contractor should refer to the Schedule of Items, Project Area Map, and Specifications when making estimates of quantities or work. 2. PROJECT LOCATION State of California, County of Plumas, Plumas National Forest, Beckwourth Ranger District, Stony Quarry, Township 26 North, Range 13 East, Section 11, (Lat. 40 07'32.40", Lon 120 28'59.70"). The Plumas Project Site, Stony Quarry is located on the Beckwourth District of the Plumas National Forest. Directions below are to initial mobilization point for the project at Stony Quarry. From Town of Portola CA: Proceed East on CA State Highway 70 approximately 5.0 miles to the junction left with FSR 177/County 111 in Beckwourth CA. Turn Left and proceed approximately 9.5 miles to where the roads split, junction road left is County 111, proceed on junction road right FSR 177-also marked 26N70 for another approximate 11.7 miles. Veer Left onto FSR 176-also marked 28N03 proceed approximately another 7.6 miles to junction right with FSR 26N16. Turn Right onto FSR 26N16 proceed approximately 150 feet; turn left onto a Spur Road-marked 26N16A and proceed approximately another 0.9 mile and make one final left turn into the quarry, arriving at the beginning of the project site. 3 WORK TIMING The Contractor shall begin work within ___3_______ calendar days after the effective date of the Notice to Proceed and shall prosecute the work at a rate that will result in completion of all work within the following time frame: Item No. Estimated Start Work Date Contract Time (Calendar Days) 1 July 11 120 days 2 July 11 120 days 3 July 11 120 days Failure to begin work on schedule will make the contract subject to immediate termination for default. Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time. The Government reserves the right to set the priority of items or subitems. Contractor shall complete all work on one sub-item before proceeding to another. If this solicitation has more than one numbered item, award of more than one item to one contractor will not change the start work dates or the amount of contract time; times will run concurrently. Winter Shutdown When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time. 4 PROJECT SITE CLEAN UP Project site cleanup includes the removal and proper disposal of all project trash, debris, and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal. Any Fuel Trucks staged on-site must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A Spill Containment Plan must be submitted and approved prior to the start of work. If a Single Oil or Oil Product Container exceed 660 Gallons, or if the Combined On-Site Storage exceeds 1,320 Gallons, the Contractor shall prepare, and submit for review and approval, then later for implementation a Spill Prevention and Countermeasures Plan. The (SPCC) Plan shall meet applicable EPA requirements (40 CFR 112), including required certification by a Registered Professional Engineer. Contractor is responsible for all clean-up costs of petroleum product spills within the project vicinity area caused directly or indirectly by their employees or from their contract operations. 6 SPECIAL CONDITIONS AFFECTING THE WORK a. Physical Conditions. The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys performed by the Government. 1. A geotechnical assessment of the site was conducted and the site geology is as follows: Site Morphology: located on a hillside beginning at the base of a basalt flow Lithology: basalt underlain by an ignimbrite and decomposed granite. Texture: Aphanitic Alteration: Some weathered pockets; mostly just stained Competency: Rebounds to pits Fines Availability: Expect little to none, majority of aggregate fines are produced. Small Scale Structures: Basalt naturally breaks into 4-6" sized blocky pieces Large Scale Structures: Basalt flow Soil Development: A few very rocky, weathered pockets; generally minimal Surface Vegetation: Sparse grasses and some trees above and below the site; some invasive weeds located in the northwest and southeast sections of the pit. Groundwater Level: Deep b. Weather. Low temperatures at the project site range from temperatures of less than 30 F in December and January to lows of 50 F in July and August. High temperatures range from 45 F in December and January to over 90 F in July and August. The annual precipitation at the project site is less than 30 inches per year including snow fall. Winter snow storms and freezing temperatures will occur during the winter months that result in a winter project shutdown. Icy conditions on local roads and highways can occur during the fall, winter and spring. Highway curves in shaded areas will remain covered with ice or frost for weeks. c. Work Hours. Work hours are from 7:00 am to 5:00 pm Monday through Friday. Weekend equipment work is not allowed at any time during the Work. Dogs and pets are not allowed on the project site at any time. d. Safety, Emergency Communications and Evacuation. Contractor is responsible for the safety of the Contractor's employees including Subcontractors employees, Government employees associated with the project, and any visitors to the site both Government and private. The Contractor shall submit a Project Safety Plan to the Contracting Officer for review prior to commencement of Work. The project safety plan shall comply with the appropriate California OSHA and Federal OSHA rules and regulations and must include a medical evacuation and emergency communications plan. e. Highway Permits. Contractor is responsible for securing any overload or over width limit permits required for the transport of materials or equipment to the project site. The Contractor is responsible for conducting a thorough reconnaissance of all routes leading to the site. f. Toilets. No toilet or shower facilities are available on site. Contractor shall provide portable toilet facilities for its employees. g. Camping. Contractor may use a self-contained travel trailer or recreational vehicle to camp on the premises. All waste material must be transported off-site to a station equipped to handle such waste. This is subject to availability and must be coordinated through the Contracting Officer. h. Water. Water for the project can be drafted out of two tributaries of the Cottonwood Creek, located about 1500 to 2000 feet away from the project. i. Security. Contractor is responsible for the Contractor's equipment and materials supplied to the site, including all produced and stockpiled aggregate. Any aggregate stolen during performance of the contract, shall be replaced at the contractor's expense. All equipment not equipped with a key lock system shall be secured in such a manner as to make it inoperable to the average person at the end of each working day. All hand tools and other equipment shall be secured at the end of each working day. The quarry shall be closed to the public at all times, but remain open to authorized government employees. The contractor shall be responsible for signing, limiting public access, and safety of the public and/or government employees in the area. On Fridays all construction debris, trash, and refuse shall be properly stored in dumpsters or trash bins or removed from the site. j. Traffic Control. Contractor shall submit a Traffic Control and Signage Plan for review and approval, prior to the start of operations. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. k. Air Quality Permits. Contractor shall submit an Air Pollution Permit (Northern Sierra Air Quality Management District) and National Pollutant Discharge Elimination System (NPDES) Permit (State). l. Burning Permits. Contractor is subject to all rules and regulations governing the on site burning of slash and other debris. Contractor shall obtain a burning permit from the jurisdiction having control over burning. The Contractor shall comply with Fire Plan for Construction and Service Contracts included in the Contract. m. Protection of Resources. Contractor shall thoroughly clean all equipment prior to delivery to the project site to remove weeds, mud, grease and oil buildup from the tires, wheels, tracks, engines and engine compartments, and other surfaces. Spills of petroleum products and other hazardous substances shall be reported, contained, and removed in accordance with all applicable rules, regulations and laws. Contractor shall submit a project spill response plan at the pre-work meeting for review by the Contracting Officer. 7 PRE-BID CONFERENCE OR TOURS There will be no Pre-Bid Tour for the project. The Contractor acknowledges that they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government. 8 EQUIPMENT CLEANING & NOXIOUS WEED-FREE CERTIFICATION Unless the entire project area is already infected with noxious weeks, the contractor shall ensure that prior to moving on to another part of the project area all off-road equipment, which last operated in areas known by Forest Service to be infected with noxious weeds, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Contractor shall certify in writing that off-road equipment is free of noxious weeds prior to each start-up of operations and for subsequent moves of equipment to other project areas. Measures taken to ensure that off-road equipment is free of noxious weeds will be identified. "Off-road equipment" includes all equipment operating off of paved roadways. A Current list of noxious weeks of concern to Forest Service is available at the Forest Supervisor's office. Contractor shall clean off-road equipment prior to moving between project areas with known infestations with noxious weeds and other project areas, if any, which are free of such weeds. Project Area maps show areas known by Forest Service that contain specific noxious weeds species of concern. Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required. Contractor shall notify Forest Service at least 24 hours prior to beginning of work in area designated as a noxious weed area, unless otherwise agreed. Notification shall include the location of the equipment's most recent operations. If the prior location of the off-road equipment cannot be identified, forest service may assume that it was infested with noxious weed seeds. Upon request of Forest Service, Contractor must arrange for forest Service to inspect each piece of off-road equipment prior to it being placed into service. If Contractor desires to clean off-road equipment on National forest land, such as at the end of a project or prior to moving to a new unit that is free from noxious weeds, Contractor and Forest service shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any. New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, within the project area or on the haul route, shall be promptly reported to the other party. 52.211-16 Variation in Quantity. As prescribed in 11.703(a), insert the following clause: Variation in Quantity (Apr 1984) (a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause. (b) The permissible variation shall be limited to: _15__ Percent increase _15__ Percent decrease This increase or decrease shall apply to _Item 3 only___________.* AGAR 452.211-74 Period of Performance (FEB 1988) The period of performance of this contract is from July 11, 2016 through November 7, 2016. Contractor shall immediately after award, plan and coordinate with the Contracting Officer the approximate start date for the pit development, then production and stockpiling of the specified surface course gradation during the listed period of performance for the Stony Quarry. Factors which will help determine the Approved Schedule, but are not limited to; Contractor's mobilization of equipment, employees, and vehicles to the project site, also material production rate capabilities and quality control compliance testing. Contractor shall comply with the Approved Schedule, to finish all work under this contract. Contractor shall immediately notify the Contracting Officer of any unforeseen delay or needed change to the Approved Schedule, so adjustments to the Period of Performance can be made in a timely manner. 9. PRE-WORK Pre-work conference. Before work begins on service contracts, a pre-work conference is normally held to discuss the contract--especially the specifications, labor provisions, plan of work, and selected standard clauses. The pre-work meeting should be attended by an officer of the firm or someone designated in writing to act on behalf of the firm. The pre-work meeting may be waived at the discretion of the Contracting Officer. Notice to Proceed. No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed. 10. PAYMENT Payments . Payment will be made for fully acceptable work at the prices bid in the schedule of items. Payment will be made monthly or at the milestones as specified in the contract specifications. Deductions In accordance with the inspection clause, payment may be made for less than fully acceptable work at a reduced price. Other exceptions are noted below: Contract Release. Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15). Invoices. Invoices. Payment will be made from Contractor's invoice submitted through The Invoice Processing Platform (IPP). RETAINAGE (applicable to service contracts where work accomplishments are measured in units other than time) The following supplements Clause 52.232-1, Payments: The Contracting Officer may retain up to 10 percent of the invoiced amount if the contractor is behind schedule at the time the invoice is presented. "Behind schedule" means that the percentage of work completed is less than the percentage of time used. Payment will be made from Contractor's invoice. 11. GOVERNMENT-FURNISHED PROPERTY The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract. NONE 12. INSPECTION AND ACCEPTANCE FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/ FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES 52.246-4 Inspection of Services--Fixed-Price (AUG 1996) 12.1 Quality Control Plan - The Contractor shall conduct inspections on all units in accordance with his/her Quality Control Plan (QCP). The Contractor's Quality Control Plan shall be submitted and accepted by the Government prior to any work starting. 12.2. Government Inspections Government inspections are for the purpose of satisfying the Government that the services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections. Summary results will be made available on request. Compliance Inspections. Visual compliance inspections will be made on a periodic basis. Such inspections are not final and do not constitute acceptance by the Government. Final Inspections. Final (formal) inspections for payment will be made on completed sub-items only. Contractor shall request final inspections in writing and give the Forest Service at least four working days advanced notice. Inspections will be completed within four working days after the notice is received. If the work is not ready for inspection at the time specified by the Contractor, the cost associated with the inspection attempt may be charged to the Contractor. Final inspection will involve a USFS check cruise. A check cruise will be conducted by the USFS Quality Control Group and must pass with 80 percent for each element and 85 percent overall or better. Check cruise that does not pass with 85 percent or better will need to be re-cruised at the contractor's expense. Refer to USFS Timber Cruising Handbook 2409.12 Chapter 60 for specific requirements. Final check cruise will be completed within 10 business days of receiving written request form contractor. Disputed Inspection. The Contractor may request reinspection without rework if the results are unacceptable. Reinspection must be requested in writing within 48 hours after receiving written notice of the inspection results. Reinspection will be accomplished within five working days after receipt of the contractor's written request. The same sampling and inspection procedures will be used, but new samples will be taken. The inspection pattern will be shifted so that new samples will not overlap previously inspected samples. Results will be rounded to the nearest whole percent. If reinspection results are within five percentage points of the first inspection, the original inspection result will be used in determining acceptability and payment. If reinspection results are greater than five percentage points above or below the first inspection, the reinspection results will be used. If the reinspection results are within five percentage points of the first inspection, the Contractor shall pay the actual costs of the reinspection. Reinspection after Rework. Where rework after a failed inspection may improve the inspection results, the Contractor may rework the area and request (in writing) a second inspection. The Government will charge to the Contractor the cost of this additional inspection. Reinspection will be accomplished within five working days after the notice is received. The results of the second inspection will be final, and no further rework will be permitted. Areas not ready for reinspection at the time specified by the Contractor will not be reinspected, and the results of the first inspection will be final. 12.3 Sampling (Government's inspection system) Each item will be 100% visually inspected randomly. With 10% random sampling post weed disposal. 10% of aggregate production will be inspected randomly throughout the contracted period. 12.4. Specific Inspection Procedures Compliance Inspections. A. Walk-throughs: Compliance inspections shall be held throughout the performance of the contract. Inspections may be in the form of "walk-throughs" to visually confirm the proper application of the contract specifications. The Government reserves the right to perform formal inspections for verification of compliance to contract specifications. B. Formal Inspections: The Government will inspect marking to determine compliance with specifications. Formal inspection will occur randomly and will inspect 10% of aggregate produced to meet specifications attached. 13 Acceptance Work on this contract will be deemed acceptable when: For all units, determination of acceptability of the work performed will be based on the Government inspections and shall be considered conclusive except as otherwise provided in the Contract. The inspection results of each unit will not be averaged with the results of any other unit. The Contractor or a designated representative is encouraged to observe inspections while they are underway. 14. Pre-work Pre-work conference. Before work begins on service contracts, a pre-work conference is normally held to discuss the contract--especially the specifications, labor provisions, plan of work, and selected standard clauses. The pre-work meeting should be attended by an officer of the firm or someone designated in writing to act on behalf of the firm. The pre-work meeting may be waived at the discretion of the Contracting Officer. Notice to Proceed. No work may begin on this contract until the Contracting Officer has issued a Notice to Proceed. 15. Payment Payments and Deductions. Payment will be made for fully acceptable work at the prices bid in the schedule of items. In the event of extended non-work periods because of adverse weather, the Contracting Officer may authorize progress payments for partially completed sub-items on a case-by- case basis. In accordance with the inspection clause, payment may be made for less than fully acceptable work at a reduced price. Other exceptions are noted below: Payment will be made in full if inspection results are 90 percent or higher. If inspection results are below 90 percent, a deduction will be made equal to 1 percent for every 1 percent below 90. For example, if inspection results are 87 percent, the bid price would be reduced by 3 percent. No payment will be made if results are less than 80 percent. 16. Contract Release. The following supplements the Payments clause in Section I: Before final payment will be made the Contractor shall sign a release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 15). Invoices. Payment will be made from Contractor's invoice submitted through The Invoice Processing Platform (IPP). RETAINAGE (applicable to service contracts where work accomplishments are measured in units other than time) The following supplements Clause 52.232-1, Payments: The Contracting Officer may retain up to 10 percent of the invoiced amount if the contractor is behind schedule at the time the invoice is presented. "Behind schedule" means that the percentage of work completed is less than the percentage of time used. 17. Emergencies Fire Plan See Section J, Fire Plan Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J): 18. Superintendence by Contractor The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language. 19. Camping Permit Compliance Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved. 20. Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences. 21. Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer. 22. Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. "Off-road equipment" includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use. Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equ...

Full description on SAM.gov

Award Overview

Award Number

AG-9JGP-C-16-0106

Award Amount (SAM.gov award notice)

$269.5K

Award Date

Jul 25, 2016

Awardee

Awardee UEI

CZRLER96YAZ5

Original Solicitation

Notice ID: 8bd25543901139c3fb17e1238c067969

Posted Date: Jul 26, 2016

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

OLaine T. Martinez
Constract Specialist
Fax: 5304786126

Documents

No documents available.

Lifecycle

Solicitation:AG-9JGP-S-16-0122
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 2×
    Combined SynopsisJun 17, 2016

    Stony Quarry Development and Aggregate Supply

    Notice 9a55f9202dec7d038276505f7e808607 on SAM.gov

  2. AwardedCurrentJul 26, 2016

    Stony Quarry Aggregate Crushing

    Notice 8bd25543901139c3fb17e1238c067969 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

AG-9JGP-S-16-0122

Archive Date

Aug 9, 2016