GovChime
Notice ID: 1648ba9c9ac843d8835ca6587441ae1bSpecial Notice

Justification & Approval for Antarctic Support Contract Extension

Archived on February 22, 2026. Original response deadline: . Full description on SAM.gov.

Description

The National Science Foundation (NSF) is releasing the attached Justification & Approval (J&A) for Other than Full and Open Competition. This J&A concerns extension of the period of performance end date for the Antarctic Support Contract (ASC) (#NSFDACS1219442) from 30 September 2026 to 30 September 2027.

This J&A leverages the authority of FAR 6.302-3; “Industrial mobilization; engineering, developmental, or research capability; or expert services”.

Consistent with the requirements of FAR 6.305, this J&A is being made publicly available. Comments concerning this J&A may be submitted to the NSF email alias provided as part of this notice.

All costs associated with responding to this release will be solely at the interested party’s expense and any information provided under this release is purely voluntary. Not responding to this release does not preclude participation in any future competition or participation in future subcontract opportunities which may arise with NSF.

Full description on SAM.gov

Overview

Agency:
National Science Foundation
Office:OFFICE OF POLAR PROGRAMS
Posted:January 8, 2026
NAICS:561210: Facilities Support Services
Last Updated:Aug 21, 2026
PSC:M1HA: OPERATION OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) R&D FACILITIES
Set-Aside:Not specified
Type:Special Notice
Place of Performance:N/A

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

NSF DACS Antarctic Support Contract

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Special NoticeNATIONAL SCIENCE FOUNDATIONJan 8, 2026419.71 KB

Lifecycle

Solicitation:ASC_Ext2
  1. Special NoticeCurrentJan 8, 2026

    Justification & Approval for Antarctic Support Contract Extension

    Notice 1648ba9c9ac843d8835ca6587441ae1b on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years The objective of this solicitation is to provide VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with Boiler Plant Inspection Services. The resulting contract should be for one base year and four options years as follows: Base Year: 11/1/2026 to 10/31/2027. Option Year 1: 11/1/2027 to 10/31/2028 Option Year 2: 11/1/2028 to 10/31/2029 Option Year 3: 11/1/2029 to 10/31/2030 Option Year 4: 11/1/2030 to 10/31/2031 Details: The VA SORCC has three heating boilers, each rated at 250HP operating at low pressure (<15 psi), gas and oiled fired. Yearly state inspections are required on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank. SPECIFIC REQUIREMENTS: Contractor to furnish labor, personnel, materials and equipment to perform inspections on the following. (3) Three heating boilers, each rated at 250HP (operating pressure <15psi), gas and oil fired. (1) One deaerator/feed water tank (Option Year 1 and 3 only) Perform a non-destructive test (Option Year 3 only) A certified inspector must be present during the NDT Test in order for the NDT test to be valid. (1) One heat recovery tank (Option Year 1 and 3 only) (1) One condensate tank (Option Year 1 and 3 only) (1) One bottom blow tank (Option Year 1 and 3 only) Inspections to include a TYPE &ldquo;A&rdquo; Internal and External inspection and a TYPE &ldquo;C&rdquo; External inspection under steam pressure for each boiler. The contractor shall witness and sign a checklist of boiler safety devises as per VA-SORCC testing procedures during the external operational inspection and shall provide a written inspection report upon completion of each inspection to Facilities Management Service. The checklist of required safety devises to be tested will be available to the contractor The inspections are to be scheduled anytime throughout the term of the contract at the discretion of the Boiler Plant Lead. Why an Inspector Must Be Present Legal Compliance: Without an inspector&rsquo;s presence and approval, the NDT cannot be considered valid for regulatory purposes. Safety Verification: The inspector confirms that the test is conducted according to recognized standards (e.g., ASME, NBIC) and that any defects are properly documented. Certification: The inspector&rsquo;s signature or approval is required on the Certificate of Inspection or NDT report, which is necessary for the boiler to remain in service. Place of Performance: VA SORCC 8495 Crater Lake Hwy White City, OR 97503 See attached Performance Work Statement (PWS) for all details regarding the specific requirements for this solictation. Questions are due by October 23th 2026 Offers are due 10/28/2026 at 5PM PDT. Contracting Officer is Jeremiah Middleton, Jeremiahmiddleton2@VA.gov
Solicitation561210Service-Disabled Veteran-Owned Small Business Set-Aside10/19/202610/28/2026White City, OR
Sources Sought for National Support Center Operations and Maintenance contract for the Urbana, MD facility.
Special Notice561210No Set-Aside10/19/202610/30/2026-
Sole Source / J&A561210No Set-Aside10/19/2026Open-
The Transportation Security Administration (TSA), Enterprise Support, Security and Administrative Services (SAS), Real Estate Management Division (REMD) and Contracting and Procurement (C&P) issued a Task Order that restricts the number of sources considered (FAR 8.405-6). The procurement request number is PR267668E127 and Contracting and Procurement&rsquo;s J&A tracking number is JA-2026-01-1309. Per FAR 8.405-6 (c), this acquisition is conducted under the authority of the Multiple Award Schedule Program. Task Order #70T01026F7668N011: a) Contractor Name: SourceAmerica (8401 Old Courthouse Rd., Vienna VA 22182) (b) Type of Action: Federal Supply Schedule Task Order with Firm Fixed Price (FFP) and Time-and-Material (T&M) line items. (c) Estimated Amount: $3,358,220.40 (d) Year of Funding: Fiscal Year 2026 (e) Period of Performance: 5/10/2026 – 5/09/2027 (f) Other Information: TSA intends to fulfill this requirement through the AbilityOne program. Due to the significant time necessary to transition these services under the program, a sole source award to SourceAmerica under GSA Multiple Award Schedule (MAS) Contract Number GS-21F-0049X is required to prevent any interruption in service until the transition is successfully completed and services are awarded under the program. Please see the attached justification for further information.
Sole Source / J&A561210No Set-Aside10/19/2026Open-
Combined Synopsis561210No Set-Aside10/19/202611/16/2026Huntington, WV

Additional Details

Solicitation Number

ASC_Ext2

Archive Date

Feb 22, 2026

Place of Performance Country

ANTARCTICA

Office Address

ALEXANDRIA, VA, 22314