End of the World Long Term Stewardship
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 AM MST
- Posted
- November 9, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- No Set aside used
- NAICS
- 113310: Logging
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH
- Place of performance
- Grangeville, Idaho
- PSC
- F099: NATURAL RESOURCES/CONSERVATION- OTHER
- Last updated
- Nov 9, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 12363N26R4016
- Notice ID
- b1a7b373c87e4afb913b843805346c12
Description
Amendment 001: This amendment provides responses to questions received, updates the points of contact for proposal submission, extends the solicitation response due date and time to 9:00 AM MST on 12/11/2026 and sets a deadline of 11/13/2026 for additional questions.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Proposals are being requested and a separate written solicitation will not be issued.
Solicitation number 12363N26R4016 is issued as a Request for Proposal (RFP) for the End of the World G-Z Long-Term IRSC (EOTW G-Z LTIRSC). The End of the World Project area is approximately 50,000 acres on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest. The End of the World EIS authorizes commercial treatment on over 17,000 acres primarily through intermediate harvest. The purpose of the EOTW G-Z LTIRSC is to thin overstocked stands to reduce the risk of catastrophic wildfire as well as improve stand health. The EOTW Project is within the Wildland Urban Interface and has numerous private inholdings with seasonal and permanent residents. This contracting tool will increase the pace and scale of active management beyond the current capacity of staffing levels.
A secondary objective of the EOTW G-Z LTIRSC is to provide a steady, dependable supply of timber and forest products to local facilities. This project aligns with Secretarial Memo 1078-006 and the Implementation of Secretarial Memo 1078-006 dated April 3, 2025 to utilize long term stewardship contracts for active management.
This acquisition is not set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 113310 and the small business size standard is 500 Employees This acquisition is an unrestricted requirement. All responsible sources may submit a proposal and offer which will be considered by the agency.
Proposals are to be submitted via email to Mark Phillipp at mark.phillipp@usda.gov and Matt Daigle at matthew.daigle@usda.gov.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (41)
- Download
13. DRAFT_EOTW GZ LTIRSC.pdf
874 KBAdded in Sources Sought version 6Posted - Download
14. EOTW G-Z LTIRSC DRAFTS.zip
13 MBAdded in Sources Sought version 6Posted - Download
C05a_SF-30_12363N26R4016.pdf
161 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
C05b_A001_Subcontracting Plan Template.docx
54 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
872 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04b_1b EOTW G-Z LTIRSC SOI_12363N26R4016.xlsx
41 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04c_2 EOTW GZ IRSC Appendix A.pdf
350 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04d_3 EOTW GZ LTIRSC Appendix B.pdf
1.2 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04e_4 EOTW G-Z LTIRSC Appendix C - Jungle Bird T-Specs.pdf
151 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans.pdf
8.8 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04g_5b FSSS Jungle Bird.pdf
427 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04h_6a Jungle Bird Mandatory CAM.pdf
7.0 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04i_6b_EOTW GZ LTIRSC Overview Map.pdf
3.5 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04j_7 Project Design Elements.pdf
187 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04k_8 Layout Note Template.pdf
401 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04l_9 Road Survey Description of Work.pdf
945 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04m_10 End of the World Marking Guide.pdf
209 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04n_11 Least Cost Road Standards.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04o_12 FP-24 Specifications.pdf
5.7 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04p_13 PCT Survey Template.pdf
122 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04q_14 Planting and Reforestation Description of Work.pdf
7.5 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04r_15 PCT Description of Work.pdf
196 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04s_16 Jungle Bird Mandatory Timber Cruise.pdf
250 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx
48 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
7. EOTW_GZ_18x24L_Wooly Bully_DRAFT.pdf
5.5 MBAdded in Sources Sought version 3Posted - Download
1. End of the World Meeting Notes.pdf
144 KBAdded in Sources Sought version 2Posted - Download
2. EOTW_RFI_PPT.pdf
1.7 MBAdded in Sources Sought version 2Posted - Download
C04u_18 EOTW G-Z LTIRSC LiDAR Process.pdf
165 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
11. EOTW_JBIRD_WSQE G-Z SOQ.pdf
101 KBAdded in Sources Sought version 4Posted - Download
8. EOTW_GZ_18x24L_Ski Bird_DRAFT.pdf
4.4 MBAdded in Sources Sought version 3Posted - Download
3. EOTW_ROD_20250106.pdf
1.6 MBAdded in Sources Sought version 2Posted - Download
12. EOTW_JBIRD_WSQE G-Z WORKLIST.pdf
159 KBAdded in Sources Sought version 4Posted - Download
9. EOTW_GZ_18x24L_Cold Fir_DRAFT.pdf
6.1 MBAdded in Sources Sought version 3Posted - Download
4. EOTW_GZ_Data_20250930.zip
1.3 MBAdded in Sources Sought version 2Posted - Download
C04v_19 EOTW G-Z LTIRSC GIS Data.zip
1.3 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
10. EOTW_GZ_18x24L_Free Bird_DRAFT.pdf
7.9 MBAdded in Sources Sought version 3Posted - Download
C04w_20 SCA WD 1955-0228v68 Dated 08142026.pdf
111 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
End of the World Long-Term Contract RFI Letter_Final.pdf
396 KBAdded in Sources Sought version 1Posted - Download
Encl 3_EOTW_Vicinity Map.pdf
3.7 MBAdded in Sources Sought version 1Posted - Download
C04x_21 DBA WD ID20260080 Mod 1 Dated 05182026.pdf
143 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Encl 4_EOTW Detail Map.pdf
3.4 MBAdded in Sources Sought version 1Posted
Lifecycle
- 2Version 2Sources SoughtArchived
End of the World Long Term Stewardship
- 3Version 3Combined Synopsis/Solicitation
Type changed from Sources Sought to Combined Synopsis/Solicitation
End of the World Long Term Stewardship
- 4Version 4Combined Synopsis/SolicitationCurrent
End of the World Long Term Stewardship
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
12363N26R4016
Archive Date
Dec 26, 2026
Office Address
Washington, DC, 202501138