Replacement TAO Wind Monitors for the National Data Buoy Center at Stennis Space Center, MS
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM CST
- Posted
- November 18, 2026
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- Agency
- Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
Notice details
- Office
- DEPT OF COMMERCE NOAA
- Place of performance
- Stennis Space Center, Mississippi, 39529
- Last updated
- Nov 18, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 142082-27-0006
- Notice ID
- b333f8efd74c4ea7b7d93bf6e00bf1ea
Description
The National Oceanic and Atmospheric Administration’s (NOAA) Acquisition and Grants Office, Eastern Acquisition Division-Kansas City intends to negotiate and award a purchase order, on a sole source basis, under authority of RFO FAR 6.103-1, with RM Young Company for Replacement TAO Wind Monitors (P/N 05103-1) to be delivered to National Data Buoy Center at Stennis Space Center, MS.
The sole source determination is based on NOAA’s only one source is capable rationale. The RM Young propeller wind monitors technology uses magnetic induction for measuring wind speed which requires no energy input. Essentially you get the wind speed for free with respect to power requirements. Further, the directional portion of the sensor only requires 0.6 mW of power. That is 100 times less power requirement than an ultrasonic anemometer. This low power wind measurement is imperative in a battery-operated remote buoy station. The propeller anemometer also provides for the measurement of wind gusts over 100 m/s where no ultrasonic anemometer technology can currently measure in that range. The NDBC helped develop the R.M. Young propeller anemometer which is now considered the industry standard. No other propeller anemometer available has the reliability of the R.M. Young propeller anemometer. Hence, the R.M. Young model 05103-1 anemometer was selected as the anemometer for the TAO refresh system in 2010 and the TAP Recapitalization effort in 2023. The NDBC now has a complete TAO network populated with these 015103-1 wind monitors and this procurement replaces those units lost at sea, damaged beyond repair, or have reached their end of life during fiscal years 2025 and 2026.
The RM Young 05103-1 is provided with the cable and connector required to match current TAO cabling. The 05103-1 also provides a pulse output for wind speed as a result of the magnetic induction technique for the measurement. The selection of another manufacturer’s wind sensors could result in $100K of engineering efforts to rework the hardware and firmware of the TAO system and the NDBC wind tunnel testing equipment to accept different connections and output formats. Further, due to TAOs climate study the new sensor would need to be tested side-by-side the RM Young 05103-1 for a year to develop the transition equation to ensure there are no step or abrupt changes in the general wind speed and direction trends. This year long side-by-side testing could cost more than $100k as it would require a co-located buoy at several locations.
This pre-solicitation notice is not a request for competitive proposals and no solicitation package is available. However, firms that believe they can fully meet the government’s requirements may submit substantiating documentation or a request for additional information in writing to Abigail Green at Abigail.green@noaa.gov within 15 days after publication of this pre-solicitation notice. Such requests and documentation will be evaluated solely for the purpose of determining whether or not to conduct this procurement on a competitive basis. A determination by the government not to conduct a competitive procurement, based upon responses to this notice, is solely within the discretion of the government. Oral communications are not acceptable in response to this pre-solicitation notice.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 1Version 1PresolicitationCurrent
Replacement TAO Wind Monitors for the National Data Buoy Center at Stennis Space Center, MS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
142082-27-0006
Archive Date
Dec 5, 2026
Office Address
NORFOLK, VA, 23510