PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement

Typical Service Activities

Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources.

Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow.

Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.

Typical Construction Activities

Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity.

Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization.

Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork.

PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. 

Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.

Full description on SAM.gov

Overview

Agency:
Department of AgricultureFOREST SERVICE
Office:USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Posted:January 15, 2026
NAICS:237310: Highway, Street, and Bridge Construction
Last Updated:Oct 22, 2026
First published:
Last updated on SAM.gov:
PSC:Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Solicitation
Place of Performance:Arizona

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (18)

  • Amendment 02.pdf

    216 KBAdded in Solicitation version 13Posted
    Download
  • Award Notice for SAM Updated v. 1.pdf

    49 KBAdded in Solicitation version 12Posted
    Download
  • Award Notice for SAM.pdf

    49 KBAdded in Solicitation version 11Posted
    Download
  • Amendment 01 Pre Bid Inquiries.pdf

    91 KBAdded in Solicitation version 10Posted
    Download
  • Amendment 01 Final AZ FERM Quote Package.pdf

    463 KBAdded in Solicitation version 10Posted
    Download
  • Amendment 01 Final AZ FERM BPA.pdf

    827 KBAdded in Solicitation version 10Posted
    Download
  • Amendment 01.pdf

    133 KBAdded in Solicitation version 10Posted
    Download
  • Final AZ FERM BPA.pdf

    816 KBAdded in Solicitation version 10Posted
    Download
  • Pre Bid Inquiries.pdf

    76 KBAdded in Solicitation version 10Posted
    Download
  • Final AZ FERM Quote Package.pdf

    461 KBAdded in Solicitation version 10Posted
    Download
  • Fire Plan.pdf

    145 KBAdded in Solicitation version 10Posted
    Download
  • Wage Deter Service Statewide AZ.pdf

    59 KBAdded in Solicitation version 10Posted
    Download
  • Wage Deter Constr Coconino Maricopa Mohave Pinal Yavapai Yuma Counties.wpd.pdf

    79 KBAdded in Solicitation version 10Posted
    Download
  • Wage Deter Constr Apache Cochise Gila Graham Greenlee La Paz Navajo Santa Cruz Counties.pdf

    66 KBAdded in Solicitation version 10Posted
    Download
  • Road Maintenance Specifications.pdf

    1.3 MBAdded in Solicitation version 10Posted
    Download
  • E__PSR-REVIEW_C-GROUP 3 G3-4 EARTHEN BARRIER G3-4 (1).pdf

    92 KBAdded in Solicitation version 10Posted
    Download
  • 840-2 DRAWING.pdf

    188 KBAdded in Solicitation version 10Posted
    Download
  • 840-2 INSTALL.pdf

    447 KBAdded in Solicitation version 10Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice bda5640f3cf5464db8a84efa84af0b4a on SAM.gov

  2. 2
    Version 2Solicitation

    Type changed from Presolicitation to Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 50143a66f33b465fb895df9875da609e on SAM.gov

  3. 6
    Version 6Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 92f766618e3246b3a25ebb08eee3d50d on SAM.gov

  4. 9
    Version 9Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 21754ebba24b47ea81f47fb162c9e9c9 on SAM.gov

  5. 10
    Version 10Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 65523667929c47c6a69e8829c9ca948d on SAM.gov

  6. 11
    Version 11Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 4351360d6368467abafe018dc6d298cf on SAM.gov

  7. 12
    Version 12Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 69249d7624594a0b9c9db96377e6122d on SAM.gov

  8. 13
    Version 13Solicitation

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice 21d6f580871d4f59a5a7215380f68c7b on SAM.gov

  9. 14
    Version 14SolicitationCurrent

    Arizona Forest Engineering and Road Maintenance (FERM)

    Notice b4665bce509a4752a539610e2ebdaf57 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

12363N23Q4021

Archive Date

Feb 28, 2033

Office Address

Washington, DC, 202501138